Special Valuation Washington Cracker Co. 304 W. Pacific Avenue

Slides:



Advertisements
Similar presentations
Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
Advertisements

366,84 m2 114,09 m2 220,84 m262,34 m2 Renaissance Premium have 2 underground parking floors which let 66 cars to park safely. 1 st Floor Bank Cafe Renaissance.
1 st Place Post-Secondary Winner. 2 nd Place Post-Secondary Winner.
DUBAI STAR WORK PROGRESS DATE 23 JULY Material At Site.
Elevations.
Capítulo 10 Instalaciones básicas programadas Instalaciones eléctricas interiores.
St Helens High School Building Construction
Barton St Peter’s Advent Calendar.
Kitsap County 1% for Arts Presents The Selected Artwork for the Kitsap County Administration Building.
Bellini Tower. - Mixed commercial (ground floor) and residential tower - Proximity to the Commercial Center, featuring retail outlets and establishments.
Rembrandt Tower - Mixed commercial (ground floor) and residential tower - Proximity to the Commercial Center, featuring retail outlets and establishments.
1130 Connecticut Ave. Washington, DC * 218,750 SF Bldg *25% Vacancy * Built 1986 * Rent = ~$46/SF * Office Building * Valuation =~$91M.
Pacific States Political Culture Washington -Moralistic Hawaii -Individualistic Oregon -Moralistic California -Moralistic.
 Life Expectancy is 180 th in the World.  Literacy Rate is 4 th in Africa.
PeriodTimeMinutes 3 rd Period8:00 – 8: rd Period8:45 – 10:1590 Break10:15 – 10: th Period10:30 – 11: th Period11:10 – 12:4090 PeriodTimeMinutes.
THE LOCATION Building Stack Basement Parking units Ground Floor -Corporate & Residential Lobby -4 Commercial Units 2 nd Floor- 3 rd Floor-Commercial.
Foundation Portfolio. frame Deploy Operating Object.
ΜΕΤΑΣΥΛΛΕΚΤΙΚΗ ΦΥΣΙΟΛΟΓΙΑ ΕΡΓΑΣΤΗΡΙΟ 3. Μετασυλλεκτική Εργ3-Λιοσάτου Γ.2 ΒΙΟΛΟΓΙΚΟΙ ΠΑΡΑΓΟΝΤΕΣ ΠΟΥ ΕΠΗΡΕΑΖΟΥΝ ΤΗ ΦΘΟΡΑ ΤΩΝ ΟΠΩΡΟΚΗΠΕΥΤΙΚΩΝ Αναπνοή Η λειτουργία.
Arithmetic and Geometric Means

Multistory Office Building
Special Valuation Northwest Transport truck Co
Co-ordinates in all 4 quadrants.
School-Wide Achievement Mathematics
Engelhorn/danmor apts 410 West 3rd Avenue
ERHS Drafting Tech Mrs. Oberlin
Special Valuation The Masonic Temple 1110 West Riverside Avenue
Special valuation 2728 S. Manito Blvd. Bonsall-Taylor House
The Derivative as a Function
1 Semester Project Design A Multi Story Office Building
Special Valuation Hobson Building 1213 West Railroad Avenue
Co-ordinates in all 4 quadrants.
اثرات گرمايش جهاني تغييرات آب و هوا، تأثيرات عميق و شديدي بر بسياري از عوامل اساسي موثر بر سلامت از جمله : آب، غذا، هوا و محيط زيست دارد كه اين مورد خود.
Grade one First term Second term Learning unit Learning unit
Genesee Block W Riverside Avenue
Phone Number BINGO!!!.
SPECIAL VALUATION 835 n POST STREET spokane-continental bakery building Commercial.
Are You Smarter Than a 5th Grader?
SPECIAL VALUATION 1021 – 1029 w First Ave New Madison hotel
LaSeven Inc. 215 East 58th Street Corner of 3rd Avenue
K E G O A Endicott GALLERY N Y MARTA MENDEZ.
Paired Verbal Fluency 3 rounds 1st: Partner A then Partner B
FOLSOM HOUSE 528 East 14th Avenue
Certificate of appropriateness 165 S
4n + 2 1st term = 4 × = 6 2nd term = 4 × = 10 3rd term
Special Valuation 1017 W First Avenue Odd fellows Hall/Montvale Event Center Commercial.
Special Valuation Montvale Hotel 1005 W. 1st Avenue
PAULSEN BUILDING 421 West Riverside Avenue
Scenario 1 CP Fire Room Ignition Team CP Attack Team Entry
Co-ordinates in all 4 quadrants.
Special Valuation 1017 W First Avenue Oddfellows Hall/Montvale Event Center Commercial.
Ашық сабақ 7 сынып Файлдар мен қапшықтар Сабақтың тақырыбы:
Are you interested in a Career as a Commercial Electrician
1st Floor Spaces Layout Latrine Latrine TTF Office TTF Office SQ SQ SQ
Windows басқару элементтері
4 Years Milestone plan – (Company Name)
Kinder Math Bee Addition Practice.
DISTRICT DEPARTMENT OF TRANSPORTATION PERMIT ISSUANCE REPORT
Co-ordinates in all 4 quadrants.
Before and After Practice
nomination Hobson Building – Barrister Winery 1213 W Railroad avenue
Қош келдіңіздер!.
October 2014 Star Data Prior to the C.A.F.E. Reading Initiative these were the results attained.
WHS Bell Schedule 1st Period  7:30 – 8:30 2nd Period  8:35 – 9:30
Shayn Bradley, Cornell Jenkins, Katherine Benson
Информатика пән мұғалімі : Аитова Карима.
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
MONTHS OF THE YEAR Les docs d’Estelle Les docs d’Estelle
GENTS REST ROOM LADIES REST ROOM BASEMENT-2 BASEMENT-1 GROUND FLOOR 1st floor 2nd floor 3rd floor 4th floor 5th floor.
SPECIAL VALUATION 726 E 25th Avenue Dr. Charles Rigg House
Presentation transcript:

Special Valuation Washington Cracker Co. 304 W. Pacific Avenue Commercial

Washington Cracker Co. Before:

Washington Cracker Co. After:

Washington Cracker Co. Windows Before After

Washington Cracker Co. Interior – 1st Floor Before

Washington Cracker Co. Interior – 1st Floor After

Washington Cracker Co. Interior - Basement After

Washington Cracker Co. Interior – 2nd Floor After Before

Washington Cracker Co. Interior – 2nd Floor After

Washington Cracker Co. Interior – 3rd Floor After Before

Washington Cracker Co. Passenger Elevator

Washington Cracker Co. Restrooms

Washington Cracker Co. Electrical Upgrades

Washington Cracker Co.

Washington Cracker Co.

Total Eligible Expenses: Washington Cracker Co. Total Eligible Expenses: $2,609,440