<month year> doc.: IEEE May 2014

Slides:



Advertisements
Similar presentations
Doc.: IEEE xxx Submission January 2015 N. Sato and K. Fukui (OKI)Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
Advertisements

Doc.: IEEE l2r Submission September 2012 N. Sato & K. FukuiSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE Submission September 2014 N. Sato and K. Fukui (OKI)Slide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE TG10 (L2R) July 2014 Clint Powell (PWC, LLC) Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE wng Submission May 2012 N. Sato, K. Fukui & T. HerbstSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
<month year> doc.: IEEE < > <September 2017>
November 1999 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Mapping the Bluetooth Specification to.
Submission Title: [Add name of submission]
<month year> <doc.: IEEE doc> May 2015
平成30年9月 doc.: IEEE /424r1 Novemver 2007
June 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Scenarios for Usage Model Document.
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Add name of submission] Date Submitted:
doc.: IEEE <doc#>
<month year> doc.: IEEE < > <September 2017>
<month year> doc.: IEEE < > <January 2018>
doc.: IEEE <doc#>
September Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ to adaptation.
<month year> doc.: IEEE /244r0 May 2001
March 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Toumaz response to TG6 Call for Applications]
<month year> doc.: IEEE < > <September 2017>
<May,2009> doc.: IEEE <doc .....> <July 2009>
doc.: IEEE <doc#1>
doc.: IEEE <doc#>
<month year> doc.: IEEE /119 September, 2003
Submission Title: Example of P2P route discovery
<month year> doc.: IEEE July 2014
平成31年1月 doc.: IEEE /424r1 July 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c motion.
May, 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Officer candidates of TG3c] Date Submitted:
<month year> doc.: IEEE < > <May 2017>
<month year> doc.: IEEE July 2014
August, 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Enhancing reliability of data transmission.
<month year> doc.: IEEE < e>
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Summary of L2R Preliminary Proposals.
doc.: IEEE <doc#>
<month year> <doc.: IEEE doc> December 2015
Submission Title: [One-to-many and many-to-many peering procedures]
Source: [Pat Kinney] Company [Kinney Consulting LLC]
平成31年2月 doc.: IEEE /424r1 November 2008
doc.: IEEE <doc#>
September Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ to adaptation.
平成31年2月 doc.: IEEE /424r1 November 2007
Sept 2004 doc.: IEEE b Sept 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
24 February 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Issues with Beacon-Mode SuperFrame.
<month year> November, 2004
doc.: IEEE <doc#>
doc.: IEEE /XXXr0 Sep 19, 2007 June 2009
Submission Title: [Frame and packet structure in ]
<month year> <doc.: IEEE doc> May 2015
<month year>20 Jan 2006
<month year> doc.: IEEE <030158r0> January 2004
doc.: IEEE <doc#>
Submission Title: [One-to-many and many-to-many peering procedures]
doc.: IEEE <doc#>
doc.: IEEE <doc#>
<month year> <doc.: IEEE doc> January 2016
<month year> <doc.: IEEE doc> March 2015
<month year> doc.: IEEE August 2014
平成31年5月 doc.: IEEE /424r1 September 2007
<month year> <doc.: IEEE doc> March 2015
doc.: IEEE <doc#>
doc.: IEEE <doc#>
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15.
September 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suggested TG3c PAR Changes] Date Submitted:
平成31年7月 doc.: IEEE /424r1 November 2007
<month year> <doc.: IEEE doc> September 2015
August, 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Improve the latency between GTS request.
<month year> <doc.: IEEE doc> March 2015
July 2003 doc.: IEEE <03/242> July 2003
Submission Title: TG9ma Agenda for September Meeting
Jan 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TeraHertz Closing Report Date Submitted: January.
Presentation transcript:

<month year> doc.: IEEE 802.15-14-0286-00-0010 May 2014 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [L2 Preliminary Proposal] Date Submitted: [ 12 May, 2014] Source1: [Noriyuki Sato, Kiyoshi Fukui] Company [OKI] Address [2-5-7 Hommachi chuo-ku, Osaka, Japan] Voice:[+81-6-6260-0700], FAX: [+81-6-6260-0770], E-Mail:[sato652@oki.com, fukui535@oki.com] Re: [This is the original document.] Abstract: [This documents describes OKI’s L2R proposal to CfPP.] Purpose: [To make a proposal] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. N. Sato and K. Fukui (OKI) <author>, <company>

L2R Preliminary Proposal <month year> doc.: IEEE 802.15-14-0286-00-0010 May 2014 L2R Preliminary Proposal TG10 presentation 11th May 2014 Waikoloa HA Noriyuki Sato / Kiyoshi Fukui OKI Electric Industry Co., Ltd. N. Sato and K. Fukui (OKI) <author>, <company>

<month year> doc.: IEEE 802.15-14-0286-00-0010 May 2014 Outline of L2R protocol Routing establishment consists of upward / downward route establishments Upward routing is established by exchanging information between neighbors. (many-to-one) Downward routing is established by sending information of parent-child relationship to the concentrator. (source routing) Both information are updated periodically. HOP-by-HOP retry L2R layer provides hop-by-hop retransmission Change route to an alternate parent BS switch consideration N. Sato and K. Fukui (OKI) <author>, <company>

Upward routing establishment <month year> doc.: IEEE 802.15-14-0286-00-0010 May 2014 Upward routing establishment All nodes broadcast “HELLO” frame to the neighbor nodes periodically. “HELLO” frame carries link costs between its neighbor nodes and itself. In the other words, outgoing link cost is told from the other side. (a) Each node decides incoming link cost. (b) A node decide the mutual link costs from the outgoing (a) and the incoming (b). HELLO frame also carries path cost. The Originator (concentrator, PAN coordinator or L2R former)’s cost is zero. A node receives path costs from its neighbors and its own path cost is calculated by using the derived mutual link cost. A node chooses the lowest one from them and broadcast to the neighbor nodes. N. Sato and K. Fukui (OKI) <author>, <company>

How to set a incoming link cost. May 2014 Node B has no neighbor information. Just after receiving a first hello from node A and C, node B sets a highest value as incoming link costs from these nodes. After receiving enough hellos, incoming link costs are updated to appropriate values. Node A Node B Node C NOA ① NOA AD LC 2 A 15 C ② NOA AD LC 2 A 1 C ③ NOA: Number of Address AD: Address LC: Link Cost N. Sato and K. Fukui (OKI)

Calculation of path cost & parent selection May 2014 Calculation of path cost & parent selection A node calculates path costs between each neighbor node. It selects the node which has the lowest path cost as the parent node. a LC = 2 1 Node h’s candidate parents 5 b f Neighbor ADDR PC LC My PC d 6 2 8 g 5 1 j 4 1 1 2 3 e 4 i c 2 4 2 2 g 3 PC: Path Cost LC: Link Cost 2 j d 1 2 1 h N. Sato and K. Fukui (OKI)

Downward routing establishment <month year> doc.: IEEE 802.15-14-0286-00-0010 May 2014 Downward routing establishment A node start to send RREC (route record) frame to its parent node periodically after upward routing is established. RREC carries the parent-child relationship information. Merged RREC is sent if RREC from a child is received. PAN coordinator gathers all parent-child relationship from the network. For the downward transmission, PAN coordinator send a frame by source routing. N. Sato and K. Fukui (OKI) <author>, <company>

Establishment of downward route May 2014 Establishment of downward route PAN coordinator (node A) achieve path to h by following steps. Node h send RREC to the PAN coordinator (node a). Each node on the path adds its address to address list of RREC. PAN coordinator gets path information to node h. Address list of RREC a NOA AD1 AD2 AD3 AD4 4 h j i f LC = 2 1 f ⇒ a 5 b f 1 NOA AD1 AD2 AD3 3 h j i 1 2 3 i ⇒ f e 4 i c 2 NOA AD1 AD2 2 h j 4 j ⇒ i 2 2 3 g 2 j d NOA AD1 1 h 1 h ⇒ j NOA: Number of Address AD: Address 2 1 h N. Sato and K. Fukui (OKI)

Hop-by-hop retry Hop-by-hop retransmission Change routing <month year> doc.: IEEE 802.15-14-0286-00-0010 May 2014 Hop-by-hop retry Hop-by-hop retransmission Retransmission timing is determined by macMinBE and macMaxBE is up to 2^(macMaxBE) * aUnitBackoffPeriod, which is intend to avoid neighbor collision L2R provides retransmission so that it retries after longer period than MAC provides. Change routing If transmission is failed to the parent, a node may change next hop to transmit. Next hop is chosen from candidates of parent which were obtained during upward route establishment / update N. Sato and K. Fukui (OKI) <author>, <company>

BS switch consideration <month year> doc.: IEEE 802.15-14-0286-00-0010 May 2014 BS switch consideration GW works as PAN coordinator Each BSs are connected to GW on the wires. A BS is downward next hop of GW. Even if one of BS is down, a node automatically updates routing information so that it connect to another BS. Hello GW BS1 BS2 BS3 BS4 Example of self healing functionality N. Sato and K. Fukui (OKI) <author>, <company>

Simulation result of 11x11 Number of nodes Distance from concentrator May 2014 Simulation result of 11x11 Number of nodes 11x11 = 121 Distance from concentrator 28 nodes on 1 hop distance. 72 on 2hops distance 20 on 3 hops distance Average 1.93hops N. Sato and K. Fukui (OKI)

Simulation result of 33x33 Number of nodes Distance 33×33=1089 May 2014 Simulation result of 33x33 Number of nodes 33×33=1089 Distance 28 nodes on 1 hop 76 nodes on 2 hops distance 124 nodes on 3hops distance 172 nodes on 4 hops dist. 220 nodes on 5 hops dist. 244 nodes on 6 hops dist. 160 nodes on 7 hops dist. 64 nodes on 8 hops dist. Average distance 4.99hops N. Sato and K. Fukui (OKI)

Condition of simulation May 2014 Condition of simulation Nodes within 3 units on the grid are neighbor where one unit is minimum distance between nodes on the grid. HELLO period: 64 (s) RREC: None L2R retransmission: Yes Delay of forwarding: 10 (ms) Data Size: 127 (Bytes) Sending period is set so that concentrator receive it 1 times per second. 11×11 each node sends once in 120 (sec) , 33×33once in 1088 (sec) NW establishment time All nodes detect route to the concentrator (s) – concentrator issued first hello (s) It may not always be optimum route. Data are sent after 15 minutes of begin of simulation . Number of trials 1 set consits (NW formation + data transmission 5 times) 100 sets of trials N. Sato and K. Fukui (OKI)

Result of simulation 11×11 33×33 Establishment time (s) 62.35 104.51 May 2014 Result of simulation 11×11 33×33 Establishment time (s) 62.35 104.51 Data arrival ration 0.999983 0.9999944 Average delay of data (s) 0.0446 0.1121 N. Sato and K. Fukui (OKI)