April 2009 doc.: IEEE /xxxxr0 January 2018

Slides:



Advertisements
Similar presentations
Geolocation databases for spectrum sharing : ECC findings and studies EC DG CONNECT Workshop, 20 March 2015 Bruno Espinosa, Deputy Director, ECO.
Advertisements

Doc.: IEEE /0271r4 Submission March 2015 Edward Au (Marvell Semiconductor)Slide 1 Comments on TGay PAR and CSD Date: Authors:
Doc.: IEEE /0023r1 Submission March 2010 Rich Kennedy, Research In MotionSlide 1 Ofcom 600 MHz Consultation Questions Date: Authors:
Updates on the 863MHz SRD band and 872MHz Award Andy Gowans, SPG, Ofcom UK 12th May 2009 IEEE802 Interim Meeting Atlanta 2009.
Doc.: IEEE /0015r2 Submission March 2015 Rich Kennedy, MediaTekSlide 1 DSRC Coexistence Tiger Team Report Date: Authors:
Standardization of Mobile Wireless Small Cell Backhaul (SCB) Document Number: IEEE r Date Submitted: Source: Junhyeong.
©Ofcom IEEE 802 Plenary, Dallas, Tx RRTAG( ) meeting Consultation on Safety Related ITS 12 th November 2008 Andrew Gowans, Head of Exempt Technology.
Doc.: IEEE /1238r0 Submission September 2011 Rolf de Vegt, QualcommSlide 1 Channelization and Bandwidth Modes for ah Date: Authors:
1/6 CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China CJK-IMT Possible Contribution to 11 th Meeting of WP5D ~ Related to Report ITU-R.
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
Doc.: IEEE /1537r1 Submission January 2016 Rich Kennedy, Unlicensed Spectrum Advocates, LLCSlide 1 IEEE Regulatory State of Affairs Date:
Doc.: IEEE /12??r0 SubmissionSlide 0 IEEE 802 Plenary, Dallas, Tx RRTAG( ) meeting Consultation on Safety Related ITS 12 th November 2008.
Doc.: IEEE /??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 0 Ultra Wideband in Europe The EC Decision January 2007.
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
Use of Spectrum Bands Above 24 GHz For Mobile Radio Services ‘5G’…
PAR Review - Meeting Agenda and Comment slides - Vancouver 2017
Proposed basis for PAR discussion
April 2009 doc.: IEEE /xxxxr0 February 2015
Andy Gowans – OFCOM (UK) 14 January 2017
IEEE Regulatory Ad Hoc Committee Closing Report
Proposed response to 3GPP ED request
IEEE Regulatory Ad Hoc Committee Closing Report
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
January 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Sub-GHz proposal for ] Date Submitted:
April 2009 doc.: IEEE /xxxxr0 May 2014
Updates on the 863MHz SRD band and 872MHz Award
IEEE Regulatory SC Waikoloa Closing Report
European 5G regulatory developments
January 2018 Project: IEEE P Working Group for Wireless Specialized Networks (WSNs) Submission Title: [Liaison Report on for Jan 2018] Date.
Ofcom 5 GHz Consultations Questions and Answers
Updates on the 60GHz bands
UWB Teleconference Report
EU-US-JP ITS Steering Group Annual Meeting 2018
LO2 - Be Able to Design IT Systems to Meet Business Needs
Month Year doc.: IEEE yy/xxxxr0 July 2015
January 19 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4g-SUN Closing Report for Beijing May 2010.
January 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Sub-GHz proposal for ] Date Submitted:
Ofcom 5 GHz Consultations Questions and Answers
Ofcom 5 GHz Consultations Questions and Answers
FCC Spectrum Sharing in the 3.5GHz Band Comments Approval
April 2009 doc.: IEEE /xxxxr0 January 2018
Ofcom 5 GHz Consultations Questions and Answers
February 19 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4g-SUN Closing Report for Vancouver, March.
Comments on Sub 1 GHz license-exempt operation
Ofcom 5 GHz Consultations Questions and Answers
April 19 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4g-SUN Closing Report for Montreal, May 2009.
Jul 15, /15/10 07/15/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4g-SUN Closing Report.
April 2009 doc.: IEEE /xxxxr0 January 2018
April 2009 doc.: IEEE /xxxxr0 January 2018
(60GHz New Technique Proposal)
Ofcom 5 GHz Consultations Questions and Answers
IEEE RR-TAG Teleconference Plan and Agenda
IEEE RR-TAG Teleconference Plan and Agenda
DSRC Coexistence Tiger Team Report
FCC FNPRM Responses Date: Authors: August 2016
Ofcom 5 GHz Consultations Questions and Answers
120 MHz PHY Transmission Date: Authors: January 2010
IEEE RR-TAG Teleconference Plan and Agenda
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Regulatory Update in Europe for Gigabit Application.
March 2019 Midweek Liaison from to Date: 13 March 2019, Vancouver, BC, Canada Authors: Jay Holcomb (Itron)
March Wednesday Plenary Liaison from to
Channelization for China’s Spectrum
TGah Coexistence Assurance
IEEE Regulatory Updates
RR-TAG (802.18) Closing Report
FCC FNPRM Responses Date: Authors: August 2016
IEEE Regulatory SC Atlanta Closing Report
Ofcom 5 GHz Consultations Questions and Answers
RF Feasibility of 120 MHz Channelization for China
Preliminary GSC positions on WRC-19 agenda items 1.13 IMT
Presentation transcript:

April 2009 doc.: IEEE 802.19-09/xxxxr0 January 2018 Ofcom Fixed Wireless Spectrum Strategy Consultation Questions and Answers Date: 18 January 2018 Authors: Jay Holcomb (Itron) Rich Kennedy, Research In Motion

April 2009 doc.: IEEE 802.19-09/xxxxr0 January 2018 Abstract This presentation is intended to be the collection point for answers to the Ofcom Fixed Wireless Spectrum Strategy consultation questions. The current revision includes the text approved by 802.18 during the 16/18 January 2018 meeting in Irvine, CA. Also included at the end of the deck are the instructions for filing the responses with Ofcom. The filing deadline is 01 February 2018 at 5:00pm UTC Jay Holcomb (Itron) Rich Kennedy, Research In Motion

Ofcom Fixed Wireless Spectrum Strategy Consultation April 2009 doc.: IEEE 802.19-09/xxxxr0 January 2018 Ofcom Fixed Wireless Spectrum Strategy Consultation https://mentor.ieee.org/802.18/dcn/18/18-18-0003-00-0000-ofcom-fixed-wireless-spectrum-strategy.pdf Consultation on proposed next steps to enable future uses of fixed wireless links We recently gathered information on how the uses of fixed wireless links could change over the next 5-10 years. This document summarises our key findings and consults on specific areas which focus on enabling ultra-high capacity wireless backhaul requirements for the future. Fixed wireless links are used to provide wireless connectivity for a range of uses such as mobile backhaul, utility services, broadcasting and financial networks using a range of spectrum bands. Jay Holcomb (Itron) Rich Kennedy, Research In Motion

April 2009 doc.: IEEE 802.19-09/xxxxr0 January 2018 Consultation – cont. In light of stakeholder responses, we are now consulting on specific areas that would enable evolved uses of fixed wireless links. With capacity requirements set to increase significantly, particularly as new technologies and networks evolve towards 5G, greater focus is now being placed on the higher millimetre wave bands to deliver this capacity. In order to start this discussion, this document explores new potential spectrum above 92 GHz. The document consults on changing the authorisation regime in the 64 – 66 GHz band to licence exempt and seeks views on a revised technical condition across the 57-66 GHz, commonly known as V band, in order to enable new fixed wireless access use cases. We are also seeking views on the adjacent 66 - 71 GHz band given that it could be part of the same ecosystem as V band. This consultation closes on 1 February 2018. Jay Holcomb (Itron) Rich Kennedy, Research In Motion

Additional Comments January 2018 April 2009 doc.: IEEE 802.19-09/xxxxr0 January 2018 Additional Comments Jay Holcomb (Itron) Rich Kennedy, Research In Motion

Consultation Question 1 January 2018 Consultation Question 1 Question 1: Do you agree that we have identified the key drivers likely to have a significant impact on the spectrum demand for fixed wireless links? If not, please provide further detail and evidence to support your answer. We agree with them. Do you have other comments to make/points to raise with us on these issues? Should add some. Jay Holcomb (Itron)

Consultation Question 2 January 2018 Consultation Question 2 Question 2: Do you agree with our conclusions on spectrum implications and our proposed strategy/next steps for each band? Depends on what Ofcom is thinking on 6GHz, hard for us to answer. Need to review consultation text more. We may not agree with them. Are there any other considerations of significance that you feel we should have included or do you have other comments to make/points to raise with us on these issues? Will come out of reviewing consolation text more. Please provide as much detail as possible to support your answer. Jay Holcomb (Itron)

Consultation Question 3 January 2018 Consultation Question 3 Question 3: Do you agree with the items we’ve identified for further consideration? Need to review consultation text. Are there any other significant areas that you believe should be included? If so, please include all necessary evidence to support your view. Jay Holcomb (Itron)

Consultation Question 4 January 2018 Consultation Question 4 Question 4: Do you agree with our proposal to change the authorisation regime in the 64 – 66 GHz band to licence exempt to create a common authorisation approach across the 57 – 66 GHz band for fixed outdoor installation use and that this would be a benefit to UK citizens and consumers? Yes, scale in 802.11ay. Jay Holcomb (Itron)

Consultation Question 5 January 2018 Consultation Question 5 Question 5: Do you agree with the proposed new technical conditions in Table 6 to facilitate equipment intended for fixed outdoor installation in the 57 – 66 GHz band? Please provide evidenced views /alternatives if you disagree with our proposal. Do you consider any additional conditions should be mandated as part of a licence exemption to manage the interference environment? We need to look at what the ECC is doing and align with others. b) Do you agree with our assessment that the proposed changes in technical conditions will have minimal impact on existing use and are appropriate to manage the future outdoor interference environment? _p/o above__ c) Are there likely to be any fixed outdoor installation use cases that will require operation at eirp levels above 55 dBm? If so, please provide evidence of how the coexistence with the different outdoor users could be ensured? _n/a_ Jay Holcomb (Itron)

Consultation Question 6 January 2018 Consultation Question 6 Question 6: What are the use cases and technical parameters envisaged for the 66 - 71 GHz band? Are they likely to be similar to those in the 57 – 66 GHz band? If so, what are your views on extending the same or similar technical conditions as described above for the 57 - 66 GHz band (both existing wideband data transmission (SRD) and new fixed outdoor technical conditions) to the 66 – 71 GHz band to facilitate both fixed and mobile use cases. See 802.11-2016 11ac / ad. b) Please provide your view on whether the technical parameters of wideband data transmission (SRD) as shown in Figure 4 are suitable to facilitate mobile/portable equipment including use outdoor? If you do not consider they are suitable, what alternative technical parameters do you think should be considered? We can explain why we need the spectrum, talk to someone from 802.11ay (Edward) to get some details. Please provide as much detail to your answer as possible and your considerations on the co-existence aspects. _p/o above__ Jay Holcomb (Itron)

Consultation Question 7 January 2018 Consultation Question 7 Question 7: Do you agree that there is a continued need for future low capacity fixed link applications? Yes - command and control. If so, please provide information to support your view and what alternatives you would consider appropriate should the upper 1.4 GHz band no longer be available. We want to understand how the 1.4 GHz users would be placed into the 6GHz band, and understand their use cases. Need to remember these are fixed links Please provide clear evidence to support the reasons for your views. _p/o above__ Jay Holcomb (Itron)

Consultation Question 8 and 9 January 2018 Consultation Question 8 and 9 Question 8: Do you consider there is merit in considering making the bands 52 GHz and 55 GHz available under alternative authorisation approach(es)such as block assignment? If so, what would you consider to be the best approach(es)? Please provide detailed views to support your response. China 802.11aj, has bands near here. How it is used or will be used in the future globally needs to be considered. If all of the EU could be enough justification even if not in NAM. What about adjacent bands in other countries? Question 9: Do you think we should review our authorisation approach to any other band used for fixed wireless links? Yes, can make comments on this. Jay Holcomb (Itron)

Consultation Question 10 January 2018 Consultation Question 10 Question 10: How do you envisage W band and D band will be used for mobile backhaul provision and the likely timescales? Please provide as much detail as possible on deployment scenarios and whether this would include indoor use. Are there any other types of applications (other than mobile backhaul) that could be suited for these bands? _n/a__ b) What are your views on the most appropriate authorisation approach for the W and D bands? Please provide as much detail and technical evidence as possible in your answer. Jay Holcomb (Itron)

Consultation Question 11 January 2018 Consultation Question 11 Question 11: Which capacity enhancing technique(s) are you using or planning to use? Yes, we can have something for this. (e.g. bandwidth, phase noise, …..) Please provide detail / evidence and clearly explain why and how each technique is planned to be used and if you consider there are any other aspects that should be considered. _p/o above_ Jay Holcomb (Itron)

Instructions for Filing January 2018 Instructions for Filing We strongly prefer to receive responses via the online form at https://www.ofcom.org.uk/consultations-and-statements/category-2/fixed-wireless-spectrum-strategy. “Basic details” questions must be answered The 11 slides correspond to the “Additional comments” and the 11 questions, to be cut and pasted into the online form in the appropriate boxes (omitting the question text from the slide) Enter the “Spam prevention” code and click “Submit” Jay Holcomb (Itron)