TPDES Construction General Permit Compliance

Slides:



Advertisements
Similar presentations
Soil Erosion.
Advertisements

Alaska Association of Harbormasters and Port Administrators Wrangell, Alaska October 26, 2010 Shane Serrano ADEC.
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
Stormwater Regulations and Programs Law Permits Watershed Programs Information available at
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
1 Effluent Guidelines for Construction Greg Davis USEPA
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
Env 247 Overview of Stormwater Management March 1, 2011.
2015 TCEQ Environmental Trade Fair May 6, 2015 Dan Siebeneicher
Overview of RIPDES Construction General Permit Requirements Developed by: Greg Goblick, Laura Stephenson RI Department of Environmental Management RIPDES.
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Construction and State Storm Water Permits What does it all mean? February 5, 2015Casper Workshop1.
Introduction to Construction General Permit Inspections.
TCEQ Construction General Permit Renewal TXR April 23, 2008 Houston Land/Water Sustainability Forum.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
NYS Department of Environmental Conservation DRAFT SPDES General Permit for Stormwater Discharges from Separate Storm Sewer Systems (MS4s) (GP )
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
MS4 Permitting Process William Creal Water Bureau Permits Section Chief.
Texas Pollutant Discharge Elimination System Stormwater Construction General Permit (CGP) 2013 TCEQ Environmental Trade Fair April 30 – May 1, 2013 Lindsay.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Short Elliott Hendrickson Inc. April A. Ryan, PE.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
Welcome Revisions of Chapter WAC Sections -035 and -036 Rule advisory committee workshop #5 Lacey, WA October 28, 2009.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Erosion and Sediment Control Programs at the Cities of Colleyville, Keller, Grapevine, Southlake, and Trophy Club Jimmy Brock, City of Colleyville Keith.
Introduction to NPDES Permits Introduction to NPDES Permits NPDES = National Pollutant Discharge Elimination System. Permit system required by Section.
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
CGP Transfers and Terminations How does it end?. Transfers.
West Pinal PM 10 Nonattainment Area Construction Dust Rule DECEMBER 9, 2015 JOSH DEZEEUW ENVIRONMENTAL PROGRAM MANAGER 1.
Legislative Overview  This quick module outlines in more detail the background of the legal requirements.
Texas Pollutant Discharge Elimination System (TPDES) Stormwater Construction General Permit (CGP) 2016 TCEQ Environmental Trade Fair May 4, 2016 Dan Siebeneicher.
Pollution Control: For Field Office Construction Sites.
Preventing Storm Water Pollution: What We Can Do Land Disturbances PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S.
Erosion and Sediment Control Ordinance. City of Southlake Strategy Map Live Our Core Values The City of Southlake provides municipal services that support.
Contractor’s Exemption Legislative Act No
Stormwater Construction General Permit (CGP) TXR150000
MS4 & Construction Storm Water Permits
Municipal Separate Storm Sewer System (MS4) Permit
For Storm Water Discharges Associated with Construction Activity
Environmental Rule 327 IAC 15-5 to a General Permit
2017 Environmental Trade Fair Shannon Gibson
MS4 On-site evaluations & common findings
Texas Pollutant Discharge Elimination System Stormwater Multi-Sector General Permit (MSGP) TXR Dan Siebeneicher Texas Commission on Environmental.
TPDES Construction Management at the City of Laredo
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
Sacramento County Stormwater Quality Program
EPA Public Meeting Dallas, Texas May 10, 2005
2018 Stormwater Construction General Permit (CGP) Renewal TXR150000
John Tinger U.S. EPA Region IX
Stormwater Pollution Prevention Plans
Ohio EPA, Division of Surface Water
CLEAN WATER ACT (1972) EPA DESIGNATED TO ASSURE COMPLIANCE WITH THE ACT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) MS4 GENERAL PERMIT ADMINISTERED.
Rule 5 and 13 Conversion Impacts
Flow chart to determine whether coverage is required
MS4 = Municipal Separated Storm Sewer System
Wastewater Permitting Updates
Edwards Aquifer Protection Program
2018 Environmental Trade Fair Shannon Gibson
Multi-Sector General Permit: MSGP
Sacramento County Stormwater Quality Program
Wastewater Permitting Updates
Stormwater Construction General Pemit (CGP) TXR150000
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

TPDES Construction General Permit Compliance Presented by: Patrick Hodgkiss and Darrel Solanik, CPESC, CESSWI Compliance Resources, Inc. March 2018

AGENDA Regulation Background / History Overview to the TPDES Construction General Permit Changes and clarifications to the 2018 Construction General Permit

Background / History All Storm Water Regulations stem from the CLEAN WATER ACT (1972) EPA (NPDES) delegated to Texas in 1998 Texas Pollutant Discharge Elimination System (TPDES - TCEQ) on March 5, 2003 Construction General Permit (CGP) – Renewed March 5, 2008 Construction General Permit (CGP) – Renewed March 5, 2013 Construction General Permit (CGP) – Renewed March 5, 2018

Construction General Permit (CGP) TXR150000 Authorizes discharges of Stormwater from: Large and small construction activities Construction support activities directly associated with construction activities Certain allowable non-Stormwater discharges into surface waters in the state

Obtaining Authorization under the CGP SWP3 and NOI’s are necessary for: Operators with “OPERATIONAL CONTROL” Operators with “DAY-TO-DAY CONTROL” NOTE – SWP3’s may be combined to cover numerous Operators, but NOI’s are opened individually for each Operator Operators may include: Landowners / Developers General Contractors Homebuilders / Custom Homebuilders NOTE: Some circumstances may require Subcontractor coverage

Operator Definition TPDES definition of “OPERATOR” Primary Operator – The person or persons associated with a large or small construction activity that meets either of the following two criteria: having on-site operational control over construction plans and specifications, including the ability to make modifications; or having day-to-day operational control over those activities necessary to ensure compliance with the SWP3 Secondary Operator – The person or entity, often the property owner, whose operation control is limited to: the employment of other operators, such as the general contractor, to perform or supervise construction activities; or the ability to approve or disapprove changes to plans and specs, but who does not have day-to-day onsite operational control over construction activities onsite

Responsibilities of All Operators Develop a SWP3 Based on the size of the project, open a Notice of Intent (NOI), Secondary Operator Construction Site Notice (CSN), or Small Construction Site Notice (CSN) Identify areas of SWP3 control Identify responsibility of operators NOTE: If the primary operator terminates the site, the secondary operator must obtain authorization as a primary operator.

Construction Activity What is considered “CONSTRUCTION ACTIVITY”? Clearing Grading Excavating Construction Support Activities. Similar Activities that Disturb / Expose Soil (Demolition, Cut / Fill areas, Spoils Areas……..) What is NOT considered “CONSTRUCTION ACTIVITY”? Routine Maintenance of Conveyances Routine Grading of Existing Roads Land Disturbances for Agricultural Activities

Construction Support Activity What is considered “CONSTRUCTION SUPPORT ACTIVITY”? Concrete or asphalt batch plants Rock crushers Equipment staging or storage areas Chemical storage areas Material storage areas Material borrow areas Excavated material disposal areas Note: The construction support activity must only directly support the construction activity authorized under this general permit.

Deadline for Obtaining Authorization If operators that submitted NOIs have active authorizations for construction activities that are ongoing when the term of the current general permit expires and a new general permit is issued, a 90-day interim (grace) period is granted to provide coverage that is administratively continued until operators with active authorizations can obtain coverage under the newly issued CGP. The 90-day grace period starts on the effective date of the newly issued CGP (3/5/18).

Changes and Clarifications to the TCEQ 2018 Construction General Permit (CGP) (effective March 5, 2018)

Changes to the 2018 Permit Definition of “infeasible” Added requirement to minimize pollutants in discharges Added requirement to preserve topsoil, unless infeasible or intentional (undesignated vehicle parking lot or equipment storage area) Provide a copy of the NOI / Secondary Operator CSN / Small CSN to the MS4 two days prior to commencing construction activities For Edwards Aquifer sites, you must submit a copy of the NOI to the TCEQ Edwards Aquifer Regional Office

Clarification to Existing Requirements STEERS is required to be used for all: Notice of Intent (NOI) - $225 fee Notice of Termination (NOT) - $0 fee Notice of Change (NOC) - $0 fee NOTE: STEERS accounts are opened for individuals, not companies. You must have one “signature” STEERS account per company.

Clarification to Existing Requirements Revised the definition of Construction Activity to include demolition, material stock piles, and construction support activities Revised requirements for shared SWP3 development: The SWP3 must clearly indicate which operator is responsible for satisfying each shared requirement of the SWP3. If the responsibility for satisfying a requirement is not described in the plan, then each permittee is entirely responsible for meeting the requirement within the boundaries of the construction site where they perform construction activities.

Clarification to Existing Requirements NOT requirements: (a) final stabilization has been achieved on all portions of the site that are the responsibility of the operator; (b) a transfer of operational control has occurred (See Section II.F.4 next slide); or (c) the operator has obtained alternative authorization under an individual TPDES permit or alternative TPDES general permit.

Clarification to Existing Requirements Section II.F.4 - Transfer of Day-to-Day Operational Control For NOI permittees, the original operator must do the following: submit an NOT within ten (10) days prior to the date that responsibility for operations terminates, and the new operator must submit an NOI at least ten (10) days prior to the transfer of operational control, in accordance with condition (c) below; and submit a copy of the NOT from the primary operator terminating its coverage under the permit and its operational control of the construction site and submit a copy of the NOI from the new primary operator to the operator of any MS4 receiving the discharge.

Clarification to Existing Requirements Section II.F.4 - Transfer of Day-to-Day Operational Control (continued) A transfer of operational control can also occur when of the following criteria is met, as applicable: Another operator has assumed control over all areas of the site that do not meet the definition for final stabilization; All silt fences and other temporary erosion controls have either been removed, scheduled for removal as defined in the SWP3, or transferred to a new operator, provided that the original permitted operator has attempted to notify the new operator in writing of the requirement to obtain permit coverage. Records of this notification (or attempt at notification) shall be retained by the operator transferring operational control to another operator in accordance with Part VI of this permit. Erosion controls that are designed to remain in place for an indefinite period, such as mulches and fiber mats, are not required to be removed or scheduled for removal.

Clarification to Existing Requirements Revised language of erosion and sediment controls to include a requirement for lids on waste containers. Minimize the exposure of waste materials by closing waste container lids at the end of the work day. For waste containers that do not have lids, where the container itself is not sufficiently secure enough to prevent the discharge of pollutants absent a cover and could leak, the permittee must provide either a cover (e.g., a tarp, plastic sheeting, temporary roof) to minimize exposure of wastes to precipitation, or a similarly effective means designed to minimize the discharge of pollutants (e.g., secondary containment);

Concrete Wash Out General permit authorizes the land disposal of wash out from concrete trucks at construction sites regulated under this general permit, provided the following requirements are met. Any discharge of concrete production waste water to surface water in the state must be authorized under a separate TCEQ general permit or individual permit. A. Discharge of concrete truck wash out water to surface water in the state, including discharge to storm sewers, is prohibited by this general permit…..removed “direct discharge” NOTE: As of 3/5/18 the STEERS NOI / renewals specifically ask “Will concrete truck wash out be performed at the site?” yes / no

Summary 2018 Permit is effective March 5, 2018 with a 90 day grace period. STEERS NOI / NOC / NOT MS4 two day notifications Edwards Aquifer Regional Office notifications Transfer of operational control notification requirements to MS4. Waste Container lids Concrete Wash Out requirements