DN Interruption Phase II

Slides:



Advertisements
Similar presentations
Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
Advertisements

Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
UNC Urgent Modification Proposal 0275 Timeline.  Day 1  User raises APP Conquest Query with requested loads (BSSOQ, SOQ, SHQ) and provides warrant from.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup Unique Sites 4 th November 2014.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
AQ Overview.  Annual Quantity (AQ) is a value held for each meter point that reflects the expectation as to the volume of gas that a meter point will.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
Joel Martin 23 rd November 2010 MOD 329 – UNC Rules on setting SHQs / SOQs & the Network Referral Process.
Nexus Workgroup CSEP Transition Topic June
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
Distribution Network Interruption - Initialisation 28 September 2010.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
1 MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime UK Link Implementation Summary & Overview of Solution Options 9 th.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
Impacts of Mod 244 Steve Nunnington xoserve. Background  96.5% of transportation charges based on capacity.  These are dependent on historical throughput.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
13 th July 2009 Meeting of Theft of Gas Review Group (UNC245)
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
IGT and Shipper Workgroup meeting 28 th February 2011.
Consideration of issues raised by UNC Modification Proposal 0244
Review of Demand Estimation Times for Modification Proposal 461
Project Nexus Workgroup (Settlement)
Xoserve provide meter and access instruction
Confirmation Notice Period for Certain ‘Unique’ Sites
Reduction of Exit Capacity at DM Supply Points
Project Nexus Workgroup
Project Nexus Workgroup
Consideration of issues raised by UNC Modification Proposal 0244
Impacts of Project Nexus Implementation Date to AQ17
0630R Review Group meeting 21 February 2018 Settlement Data topic
Release 2 Scope Business Benefit Review
CSS Consequential Change CoS Shell Record Submission for Discussion at 630R 27th April 2018.
Project Nexus Workgroup
AQ Review and Revision Processes & Development of the Current Regime
Interruptible to Firm – NTS Supply Point Transition
Release 3 Scope Selection and Plans
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
Consideration of issues raised by UNC Modification Proposal 0244
SHQ Review Process Update
UK Link Replacement Programme additional supporting UNC modifications
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Deferral of Retrospective Updates Functionality
Project Nexus Workgroup
COR1000 Telecoms Project UK Link Committee
Development Work Group 0209 Straw Man Update
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime Distribution Workstream Update Following Completion of Analysis 23rd.
Implementation Approach Distribution Workgroup – June 2014
Project Nexus Workgroup
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
PN UNC Workgroup (AQ topic)
Customer Issue Management CoMC Update
Transmission Workstream 05 November 2009
Annual Quantity (AQ) 45.
Customer Issue Management CoMC Update for April & May 2019
0688 Workgroup Xoserve Actions
Enabling Large Scale Utilisation of Class 3
XRN Enabling large scale utilisation of Class 3 – MOD0700
Customer Issue Management Dashboard CoMC
Presentation transcript:

DN Interruption Phase II 27 January 2011

Supply Type Initialisation Proposed Solution Shippers to re-confirm all on demand LDZ interruptible supply points using current processes with an effective date of 01 October 2011 to: Change the supply type status to firm Set the NDM SOQ or DMSOQ & DMSHQ parameters Correct transportation invoicing Ensure compliance with UNC MOD090 For any sites remaining unconfirmed by a back-stop date, it is proposed that they will be reconfirmed by the Transporter on the current Registered User’s behalf

Benefits Shippers will nominate the correct Supply Type and receive an appropriate Supply Point Offer for the nominated values. Shippers will be able to confirm supply points with GNT permitted by code NDM or DM (DMM, DMV or DME) Updates both Transporter and Shipper systems. Provides an opportunity to review and set the DM SOQ & DM SHQ: DMSOQ for Interruptible Supply Point will not have increased in line with daily consumption (although BSSOQ will have been reset once per year). Supply Points confirmed as Firm DM will be subject to the LDZ capacity ratchet regime.

Supply Type Initialisation Shipper / xoserve indicative milestones April ’11 July ‘11 April - xoserve will issue to Shippers interruptible portfolios to current Registered System Users together with Appeals to change the supply type through the usual process April – May – Shippers to review portfolio and SOQ/SHQ Shippers nominate using appropriate appeal reference Networks process appeals in the normal way – allow time for referrals May – Shippers advise of any amendments to Registered System User, DMSOQ, DMSHQ, GNT Change May onwards – xoserve issue revised appeals as required The above dates will be subject to change and are dependent on the commencement of technical evaluation.

Restricted transfer dates Re-confirmation of LDZ Interruptible supply points with requested effective dates between 08/09/11 - 19/10/11 will be rejected These confirmations would prevent a correct transfer for 1st October Where a Shipper has a supply contract (incoming Shipper) due to commence between these dates where effective date is other than 01/10/11, incoming Shipper will need to notify xoserve. Transportation adjustments can be processed for the period where the RSU doesn’t align with the customer contract.

Supply Type Initialisation Proposed Solution - Timeline The above dates will be subject to change and are dependent on the commencement of technical evaluation.

Backstop process Any sites remaining unconfirmed by the ‘back-stop date’ would be re-confirmed by the Transporter on the current Registered System User’s behalf xoserve will advise the Registered System User of any sites that remain unconfirmed to ‘firm’ by the ‘back-stop date’ xoserve will create .NOM and .CNF files for each Shipper If required, copies of files can be issued to Shippers File names will be previously unused references SOQ/SHQ values used in that confirmation will be exactly as held in Sites and Meters at that time, regardless of any appeal raised by Shippers earlier in the year Current Shipper and Supplier and current emergency contacts will also be utilised Files would be processed through UK Link and normal response files generated Files may be issued to Shippers TRF files would be issued to Shippers at D-7 Same process would be operated for Unique Sites but carried out off-line