Intensity Stabilization Servo Plan

Slides:



Advertisements
Similar presentations
KAGRA ISC Electrical Components Layout Yuta Michimura Ando Group Department of Physics, University of Tokyo April 17, 2015.
Advertisements

Enhanced LIGO Laser System S. Wagner, B. Schulz, R. Wachter, C. Veltkamp, M. Janssen, P. Weßels, M. Frede, D. Kracht.
Present status of the laser system for KAGRA Univ. of Tokyo Mio Lab. Photon Science Center SUZUKI, Ken-ichiro.
LIGO-G W Performance of the LIGO I PSL at the LIGO Hanford Observatory Rick Savage LIGO Hanford Observatory Laser Zentrum Hannover November 15,2000.
LIGO-G W LIGO II Pre-stabilized Laser System Design Requirements and Conceptual Design David Ottaway, Todd Rutherford, Rick Savage, Peter Veitch,
LIGO-G W LIGO II IO/PSL Optical Table Layouts Rick Savage and David Ottaway LIGO Science Collaboration Meeting Hanford, August 15-17, 2000.
Performance of the LIGO Pre-stabilized Laser System Rick Savage LIGO Hanford Observatory Ninth Marcel Grossmann Meeting on General Relativity Rome 2000.
Electronics and Cables around IMC Common Mode Servo Board Yuta Michimura Ando Group Department of Physics, University of Tokyo August 10, 2015.
Servos Servos are everywhere. Elements of servo System -- to be controlled Sensor or detector -- measure quantity to be controlled Reference -- desired.
LIGO-G v5 1 Pre-stabilized Laser System (PSL) Technical Status NSF Review of Advanced LIGO Project Benno Willke, AEI Hannover and the AdvLIGO PSL.
Summary of Suspension Configurations Yuta Michimura Department of Physics, University of Tokyo March 18, 2015.
Optical Gyroscopes for Ground Tilt Sensing in Advanced LIGO The need for low frequency tilt sensing The optics in Advanced LIGO’s suspensions must be very.
Current status of Laser development 2nd Korea - Japan Workshop on KAGRA 2012/5/28(Mon)
Intensity Stabilization Servo Plan Yuta Michimura Department of Physics, University of Tokyo November 23, 2015.
Pre-stabilized laser (PSL) for AdV Scope of the system Main tasks Requirements Reference solution and status of the design Plans towards completion Technical.
Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008 LIGO G Z Benno Willke for the PSL team.
New iKAGRA Configuration Yuta Michimura Department of Physics, University of Tokyo 11th KAGRA F2F (University of Tokyo) Feb 6, 2015.
1 Intensity Stabilization in Advanced LIGO David Ottaway (Jamie Rollins Viewgraphs) Massachusetts Institute of Technology March, 2004 LSC Livingston Meeting.
Dual PD Amp Circuit Board Test Results By Alexa Staley LIGO G v1 1.
Status of the Advanced LIGO PSL development LSC meeting, Baton Rouge March 2007 G Z Benno Willke for the PSL team.
Laser system for LCGT Norikatsu MIO.
Ultra-stable, high-power laser systems Patrick Kwee on behalf of AEI Hannover and LZH Advanced detectors session, 26. March 2011 Albert-Einstein-Institut.
Summary of iKAGRA Test Run Mar 25-31, 2016 Yuta Michimura Department of Physics, University of Tokyo April 12, 2016JGW-T
LIGO-G W Status of the LHO PSLs Rick Savage LIGO Hanford Observatory LIGO Scientific Collaboration Meeting August 13-16, 2001.
Local control sensors for iKAGRA payloads and perspective (Optical lever) Kazuhiro Agatsuma 2013/Dec./5 ELiTES meeting at Tokyo1.
Arm Length Stabilization Conceptual Configuration Yuta Michimura Department of Physics, University of Tokyo JGW-T November 14, 2016.
bKAGRA PSL Design Study
Main Interferometer Subsystem
Summary of iKAGRA Test Run Mar 25-31, 2016
Summary of iKAGRA Test Run Apr 11-25, 2016
Status of PLL system of ALS
A study of Arm Length Stabilization in KAGRA
Yuta Michimura Department of Physics, University of Tokyo
Electronics and Cables around IMC Common Mode Servo Board
J. Kovalik, LIGO Livingston Observatory
Lasers for Advanced Interferometers
Interferometer Design for bKAGRA Phase 1 and Beyond
Present status of the laser system for KAGRA
Arm Length Stabilization Conceptual Configuration
Arm Length Stabilization Conceptual Configuration
KAGRA+ Upgrade Plans Yuta Michimura1, Kentaro Komori1
Cartoon of the optical layout around IMC, IFI and IMM
RF and DC Cabling Policy for KAGRA ISC
Interferometer Design for bKAGRA Phase 1 and Beyond
Summary of iKAGRA Test Run Mar 25-31, 2016
Summary of iKAGRA Test Run Mar 25-31, 2016
Interferometer Design for bKAGRA Phase 1 and Beyond
R&D of Freedback-Free Optical Resonant Cavity
Interferometer Design for bKAGRA Phase 1 and Beyond
bKAGRA PSL EOM Layout ~180W ? to IMC Laser EOM (fPMC, PM) PMC EOM
Summary of Issues for KAGRA+
Interferometer Design for bKAGRA Phase 1 and Beyond
Commissioning Procedure for bKAGRA Phase 1 ( )
Commissioning Procedure for bKAGRA Phase 1
Yuta Michimura Department of Physics, University of Tokyo
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Interferometer Design for bKAGRA Phase 1 and Beyond
Beam Propagation for bKAGRA Phase 1 with flat ETMs
Summary of iKAGRA Test Run Mar 25-31, 2016
Intensity Stabilization Servo Plan
RF and DC Cabling Policy for KAGRA ISC
Interferometer Design for bKAGRA Phase 1
Yuta Michimura Department of Physics, University of Tokyo
Yuta Michimura Department of Physics, University of Tokyo
Arm Length Stabilization Conceptual Configuration
KAGRA ISC Electrical Components Layout
Yuta Michimura Department of Physics, University of Tokyo
Measurement of radiation pressure induced dynamics
KAGRA ISC Electrical Components Layout
Presentation transcript:

Intensity Stabilization Servo Plan May 10, 2019 Intensity Stabilization Servo Plan Yuta Michimura Department of Physics, University of Tokyo

Scope Start discussion on the sevo topology of the bKAGRA intensity stabilization servo (ISS) Start from following the aLIGO design Related documents: - Optics Express 20, 10617 (2012) (aLIGO ISS/FSS paper) - Optics Letters 34, 2912 (2009) (aLIGO ISS paper) - LIGO-T0900649 (aLIGO PSL Final Design) - JGW-G1503293 (bKAGRA laser development status) - JGW-T1200913 (requirement from MIF)

Requirement see related documents for the real spectra

aLIGO Topology medium power amplifier high power oscillator PMC NPRO FI FI AOM medium power amplifier high power oscillator PMC Finesse: 130 Round trip length: 2.02 m IMC Finesse: 475 Round trip length: 32.9 m

bKAGRA Topology Plan PMC design not fixed yet What do we do for the noise eater servo? Any feedback to fiber amps and/or solid state amps? NPRO FI AOM PMC Finesse: 155 ? Round trip length: 1.95 m ? FI IMC Finesse: 500 Round trip length: 53.3 m fiber amplifier solid state amplifier