Motion – ae UnConditional Approval to RevCom

Slides:



Advertisements
Similar presentations
IEEE mc Closing Report for March 2015
Advertisements

EC Closing Slides and Motions November 2009 Atlanta, GA.
Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb Date: Authors:
Doc.: IEEE /0144r01 Submission February 2015 Apurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the February EC Telecon IEEE P Wireless.
Doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 1 July 2009 Plenary Presentation from WG11 to 802 EC Date: Authors:
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Month Year IEEE Motions in July, 2017 Plenary
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
802.11e Portland Report July 16, 2004 July 16, 2004
November 2010 doc.: IEEE /0872r3 November 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
Motion IEEE Standards withdrawals to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE TGai Closing Report
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
Changes From D8.00 to D9.00 Date: Authors: January 2008
Task Group G Report March 10, 2003
– Proposed change to Operations Manual – access to members area
November 2011 WG11 Motions for the EC
IEEE Motions in July Plenary DCN:
P802.11w report to EC on request for approval to proceed to RevCom
IEEE Motion at the February EC Telecon
November 2010 doc.: IEEE /0872r4 November 2010
Motion – P Rev/D3 to RevCom
Motion – P Rev/D2 to Sponsor Ballot
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE Motion at the February EC Telecon
TGn Closing Report Los Angeles, CA, US 802 Interim
November 2008 doc.: IEEE /1437r1 August 2010
TGu Motions Authors: March 2010 Date: March 2010
TGu Teleconference Motions
TGn Closing Report Vancouver, BC, Canada 802 Plenary
TGn Closing Report Denver, CO, US 802 Plenary – July ‘08
Motion – P Rev/D3 to RevCom
March x D2 to RevCom Bob Heile, Decawave.
Motion – P Rev/D2 to Sponsor Ballot
July 2011 EC Motions Date: Authors: July 2011
November 2010 doc.: IEEE /0800r9 November 2011
TGae Closing Report – January 2011
P b to RevCom: Conditional Approval Request
TGu Motions Authors: March 2010 Date: March 2010
IEEE ac – May 2013 First Sponsor ballot closed on May 5, 2013.
IEEE mc Closing Report for September 2016
January 2012 doc.: IEEE /0179r1 Jan 2012
Jan 2012 doc.: IEEE Jan aa –Robust Audio Video Transport Streaming Jacksonville Closing Report Date: Authors: Graham Smith,
Motion IEEE Standards withdrawals to RevCom
Presentation transcript:

Motion – 802.11ae UnConditional Approval to RevCom January 2012 doc.:EC Motion Feb 7, 2012 Janaury 2012 Motion – 802.11ae UnConditional Approval to RevCom Grant Unconditional approval to forward P802.11ae to RevCom. Moved: Bruce Kraemer Seconded: Jon Rosdahl This project completed Sponsor ballot on Jan 04, 2012 with zero comments and 100% approval Document 11-12-0030r1 is the report the requirements for unconditional approval to forward P802.11ae to RevCom was approved in the WG: 61/0/0 URL: https://mentor.ieee.org/802.11/dcn/12/11-12-0030-01-00ae-excom-request-to-proceed-to-revcom.ppt Bruce Kraemer, Marvell Bruce Kraemer, Marvell

IEEE 802 Sponsor Ballot Results – P802.11ae January 2012 doc.:EC Motion Feb 7, 2012 Janaury 2012 IEEE 802 Sponsor Ballot Results – P802.11ae Draft Opened Closed Days Pool For Against Abstain Return #Cmnts % 5.00 2011-08-10 2011-09-09 30 145 110 94.8 6 5.2 7 123 84.8 212 6.00 2011-10-14 2011-10-29 15 115 95.8 5 4.2 5.5 127 87.6 17 7.00 2011-11-28 2011-12-13 124 100 8 6.1 132 91.0 11 8.00 2011-12-15 2012-01-04 126 9 6.7 135 93.1 Bruce Kraemer, Marvell Bruce Kraemer, Marvell