MET Session workshop Job description Integration Engineer

Slides:



Advertisements
Similar presentations
Program Management Office (PMO) Design
Advertisements

Managing the Information Technology Resource Jerry N. Luftman
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
Development plan and quality plan for your Project
UN/CS/RAI/USAA/DB01/ Development of a Strategic Plan for a Digital Archives Programme Common Services Working Group on Archives and Records.
Progress on Planning for Deployment Geneva, 16 April 2015 Advisory Group Meeting.
Configuration Management Romuald Duperrier Head of Systems Engineering Division April 22, 2015.
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
Neutron Chopper Technologies Work Package
Monolith design update – Emphasis on Neutron beam extraction design
ESS Annual Review Science Directorate - Dimitri Argyriou The challenge for 2016: Matching instrument scope with budget Andreas Schreyer European Spallation.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Overview of the Neutron Instrument Construction Project Shane Kennedy NSS Project Leader, ESS IKON 10, Düsseldorf, 16 February.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Interfacing instrument teams with ESS and STAPs Ken Andersen ICB5, Copenhagen 7 th March 2016.
ESS Update TAC Meeting October 2015 James Yeck Director General
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
ESS Annual Review Science Directorate - Dimitri Argyriou ESS update Andreas Schreyer Director for Science European Spallation Source ERIC Engineering STAP.
1 Interfaces, Engineering and Standards. 2 Interfaces LoKI Interface document description for deliverables Elements: PBS number, Deliverable description,
ESS Annual Review Science Directorate - Dimitri Argyriou Science Directorate Update Andreas Schreyer European Spallation Source ERIC Instrument Collaboaration.
Rob Connatser NSS Instrument Work Packages and XLPM.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Program Management Office (PMO) Design
Program Management Office (PMO) Design
Making Difficult Decisions in a Transparent Way –
Program Management Office (PMO)
Overview – Processes Overview Purpose Roles & Responsibilities
Program Management Office (PMO)
Program Management Office (PMO)
The European Spallation Source
Welcome & Charge for the Meeting
The European Spallation Source
Mikael Jakobsson ESS Installation Manager
Sample environment for Spectroscopy (TEFI, PREMP)
Installation Binder / IRR – an example
Instrument labs, ventilation and sample handling
NSS Instrument Project Tollgate Coordinator
Action List.
STAP meeting for Imaging & Engineering October CHARGE & Organization
Remote Handling Workshop Introduction
The Common Shielding Project
Basics for Bunker Installation Schedule Bunker CDR 2.0
Mechanical Engineering & Technology (MET)
Bunker Internal Review Welcome & Charge
Instruments Shielding Project Installation
Science Support Systems at ESS
Imaging & Engineering STAP Meeting 12th-13th of April 2018
IKON 15 Talal Osman & Iain Sutton
BEER – General Update Nuclear Physics Institute CAS Přemysl Beran
Large Scale Structures
Bunker -Target interfaces
Instruments – Bunker Wall interfaces
Welcome Update on ESS Construction Project
Rack Placement Chopper Workshop
TG3 Process /Part 2 Gábor László NSS Lead Instrument Engineer
Technical Updates Gábor László NSS Lead Instrument Engineer
NSS integrated installation plan workshop Introduction
Bunker Project Schedule/Budget
Spectroscopy STAP Meeting ESS, 8th of April 2019
Imaging & Engineering Diffraction STAP Meeting ESS, 21th of March 2019
Update on ESS Construction Project Charge to the SANS STAP
Feedback from IKON 14 Spectroscopy.
Accelerator NCFE Liaison Officer
Introduction, Overview, Charge, Project Plan, Requirements
Bunker Critical Design Review Welcome & Charge
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Reflectometry STAP Meeting ESS, 29th of April 2019
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

MET Session workshop Job description Integration Engineer Clara Lopez Senior Mechanical Engineer www.europeanspallationsource.se 29 April, 2019

Instruments overview 4. C-SPEC (cold chopper spectrometer) TUM (Munich and LLB Paris) 7. Partial work: Odin Magic 6. MIRACLES backscattering spectrometer- ESS Bilbao 3. VESPA -vibrational spectroscopy (CNR Italy-ISIS UK) 5. Heimdal Hybrid diffractometer-Denmark Aarhus university Scope of deliverables: 15 instruments and 1 TBL Distribution in the different halls, North, East, South and West Different challenges in each of the areas 1. LoKI Broad band SANS (ISIS -UK) 2. FREIA Liquids Reflectometer (ISIS -UK)

ESS Interfaces Instruments EU/SE Regulations NSS Project Office Bunker LoKI FREIA VESPA MIRACLES HEIMDAL C-SPEC MAGIC ODIN BIFROST BEER T-REX SKADI ESTIA NMX TEST BEAM DREAM Design Procurement Installation Commissioning Operations Bunker Tech groups NSS Project Office Instruments EU/SE Regulations ESS

Main activities for Integration Single point of contact for Technical information Follow logs, agreements, schedule, action plans, risks assessments, design solutions, procurement process, etc. Monitoring and chasing on going process: CAD models, documents, change request, design progress, development plans, critical constrains, technical reviews, etc. Highlighting areas of concern between ESS/NSS and instruments partners Knowledge of the work process in both parties- applied design Facilitate communication and ensure the proper flow within ESS/IKP/suppliers Help to identify interface responsible, lead to solutions, etc. Supporting simultaneous projects with different phases, align gaps Support NSS Technical activities. Coordination of installation for ISIS instruments: LoKI, Freia and Vespa (UK-Italy)

Expectations and needs from MET CAD Translation P&ID Piping/cabling for instruments As built drawings Installation drawings Review drawings for procurement and TG3 Specific work design: NSS and Instruments Integration envelops CE Support for instruments Personnel for installation Identification of suppliers/ materials – special cases Standards: models in 3D and drawings Quality Project understanding Cost/duration Quick response

Questions and comments