October 2013. An educational facility will feature: child-sized miniature buildings, streets, crosswalks, traffic lights, a railroad crossing, Bicycle.

Slides:



Advertisements
Similar presentations
Números.
Advertisements

Un percorso realizzato da Mario Malizia
Safe Routes to Schools in Alameda County Workshop Tuesday, May 4, :30 - 5:00 pm.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Chapter 4 Sampling Distributions and Data Descriptions.
West County Transit Enhancement Plan Tuesday, May 24, 2011 El Cerrito City Hall WCCTAC member agencies City of El Cerrito City of Hercules City of Pinole.
Fill in missing numbers or operations
1
& dding ubtracting ractions.
Brain Buster Math What fraction tells how many crayons are out of
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Objectives: Generate and describe sequences. Vocabulary:
David Burdett May 11, 2004 Package Binding for WS CDL.
Continuous Numerical Data
CALENDAR.
Signing Plan Design - At Grade Intersections Sample Plan Set
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Office of Traffic, Safety, and Operations Sample Plan Set Signing Plan Design (At-Grade) June 20, 2012.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
US101: SE 16 th – SE 36 th Street (Lincoln City) )Project Community Advisory Committee July 11, 2007 Meeting.
1 1  1 =.
1  1 =.
Year 6 mental test 15 second questions Calculation Addition.
7 | Means of Egress (Life Safety Code)
Traffic Impact Study “Study to evaluate the impact on a roadway network due to a proposed development”
Break Time Remaining 10:00.
The basics for simulations
Washington Street Redesign Andrew Brunn, Kamila Misiak, Sarah Thomas The Long Term Solution.
Red Tag Date 13/12/11 5S.
Fine Tuning Boulders transportation system Presented by: Marni Ratzel GO Boulder/ city of boulder making infrastructure work for biking and Walking.
PP Test Review Sections 6-1 to 6-6
Mental Math Math Team Skills Test 20-Question Sample.
Look at This PowerPoint for help on you times tables
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
1 Complete Streets: Guide to Answering the Costs Question Companion Presentation, Part 4.
Visual Highway Data Select a highway below... NORTH SOUTH Salisbury Southern Maryland Eastern Shore.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Least Common Multiples and Greatest Common Factors
Before Between After.
Subtraction: Adding UP
: 3 00.
5 minutes.
Signs, Signals, and Pavement Markings
Static Equilibrium; Elasticity and Fracture
Essential Cell Biology
Book 12 Bicycle Signals IMSA Ontario Expo October 1, 2014 Markham, ON.
Converting a Fraction to %
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
Drivers Education Journal # Please pick up all the handouts Get out a sheet of loose leaf paper and something to write with Write the.
& dding ubtracting ractions.
Select a time to count down from the clock above
Louisiana Safe Routes To School Program
1 There are some pictures of Jinan Maybe you can imagine what is going on there Here we go…… most form Yang.
UNDERSTANDING THE ISSUES. 22 HILLSBOROUGH IS A REALLY BIG COUNTY.
Multiplication Facts Practice
Graeme Henchel Multiples Graeme Henchel
0 x x2 0 0 x1 0 0 x3 0 1 x7 7 2 x0 0 9 x0 0.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
School-based projects from a Transportation Act program.
The Green Communities Association Safe Routes to School (SRTS)- Towards Sustainability How do we move SRTS, and other similar ‘soft’ initiatives, to the.
Safe Routes to School  First word is “Safe”  Physical fitness.  Reduced congestion.  Clean air.  A fun way to get to school.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
West County Transit Enhancement Plan Monday, May 23, 2011 Richmond City Hall WCCTAC member agencies City of El Cerrito City of Hercules City of Pinole.
Lompoc Walkability Assessment September 24, 2009.
Presentation transcript:

October 2013

An educational facility will feature: child-sized miniature buildings, streets, crosswalks, traffic lights, a railroad crossing, Bicycle paths Volusia County Schools current curriculum will be used and is designed to teach our young people to recognize safety hazards found in everyday life and learn to make The best choices when faced with potential hazardous situations.

Mobile Safety City will enhance the existing and proposed bike education elements of the Volusia County Public Schools Physical Education Program. It will be available for use throughout the school year to elementary aged students K-5. (Reg Ed & ESE)

Programs include: Bicycle safety, Bus Safety, Pedestrian safety, Stranger awareness, Traffic Safety, Traffic Signs and Traffic Lights. Occupies a section of parking lot with a minimum of 70 X 80 for 4 stations.

Kids are encouraged to bike (or walk) to school for Three main reasons: To enhance the health of kids - Increased physical activity can combat a host of health problems facing kids today. To enhance the health of kids - To improve air quality and the environment - Replacing car trips to school with walking or bicycling can help reduce air pollution and traffic. To improve air quality and the environment To create safer routes for walking and bicycling - Sidewalks, education programs and traffic calming measures are some of the ways to improve conditions. To create safer routes for walking and bicycling

Cookie Grafton, Instructional Materials, Health & Physical Education Specialist for Volusia County Schools will oversee the project and provide updated progress reports for two years.

(5) Portable Stop Sign – 24 - $41.99 each (2) Railroad Crossing Sign – 18x18 - $42.00 each (3) School Bus Stop Sign – 18x24 - $32.25 each (5) School Crossing Signs - $62 each (20) Sign Base and Pole – 4 ft Predrilled – 37 lb. - $ each (4) Portable (Functional) Remote Control Traffic Lights (w/ auto cycle) - $495 each (Any 2 pole can be used to mount – brackets included) (5) Street Name Signs – 6x24 - $45.95 each (5) Post Brackets for Street Name Signs - $11.50 each (5) Post for Street Name Signs - $48.95 each (3) Traffic Cones – 42 High - $70.10 each (1) Begin and End Sign - 24 x 12 - $35 each (7) Artificial Trees - $59.97 each Green Outside Carpet (Total coverage of 5x75 - $1.10/sq. ft.) (10 Rolls) 2 wide white and yellow tape for outlining: 1.88x20 yards - $3.37 Streets Bicycle Lanes Sidewalks Crosswalks Railroad Crossing (20) Plywood Sheets – (5) 8X8 Sheets per bldg.-4 Buildings X 5 Sheets – 20 Sheets x $25 each (4) 8x8 (drawings of bldgs.) for the facing of each building (By Students) Miscellaneous Hardware – Hinges, screws, etc. (10) Storage Bins – $39.99 each 2013 Trailer w/ Ramp (for transporting materials) – 7 X 16