Review: Entry Capacity Transfer and Trade Methodology Statement

Slides:



Advertisements
Similar presentations
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
Advertisements

Project Nexus Workgroup Unique Sites 4 th November 2014.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission Workstream, 2 April 2009.
Incremental Entry Capacity Release Methodology Statement Review 2005 Transmission Workstream - 15th June 2005.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
LTSEC summer auction Transmission Workstream 6 th April 2006 Dave Adlam, National Grid NTS.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Assignment of NTS Entry Capacity Transmission Workstream 02 July 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Assignment of NTS Entry Capacity – Questions relating to High level Business Rules Assignment Workstream, 7th April 2009.
Transmission arrangements for distributed generation DCMF 9 April 2008 Pre consultation document.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Initial Thoughts on Timeline for Entry Capacity Substitution Draft for discussion purposes only.
European Developments Transmission Workgroup 3 rd May 2012.
Distribution workstream 29th January 2009
Transmission Workstream February 2009
Exit Capacity Release Methodology Statement
Grid Code What is the Standard Modification Process? Panel
Transmission Planning Code – Draft Document
Manifest Errors for Entry Capacity Overruns Workgroup 364
Transmission Workgroup 7th July 2011
Grid Code Development Forum – 6 September 2017
Grid Code Review Panel 16th August 2017
Transmission Planning Code
Transmission Workgroup 4th October 2012
Introduction of Code Contingency Guidelines Document
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
UNC Modification Proposal 0373
Transmission Workgroup – 1st December 2011
Gas SO Incentives from April 2010
Proposer: National Grid NTS Panel Date: 17th April 2014
Review of System Alerts
Capacity Methodology Statements: Impact of Mod 452
Capacity Methodology Statements
Assignment Workshop 2 16th September 09, Solihull.
Background Exit Reform Modification expected to be implemented 01 April 2009 But, decision has not yet been received Number of procedures/documents need.
Annual Review - Methodology Statements
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
Assignment of NTS Entry Capacity – Background and UNC Obligations
Exit Capacity Substitution and Revision
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Draft Capacity & Connection Plan
Transmission Planning Code Review
QSEC auction timetable
Long Term Non Firm Capacity Update
Introduction of Code Contingency Guidelines Document
Proposed Environmental Incentive
Review of Trade and Transfer Winter 09/10
Transmission Workstream – 6th July 2005
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Generic Revenue Driver Methodology
Additional Gemini API’s UK Link - Class 3 Modification
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Transmission Workstream 1st February 2007
Transmission Workgroup July 2012
IECR Incremental Step Size
Review Group 221: Review of Questions from Session 2
Incremental Entry Capacity Release Methodology Statement
Transmission Workstream 05 November 2009
Gas Customer Forum 28 July 2008
Presentation transcript:

Review: Entry Capacity Transfer and Trade Methodology Statement Transmission Workgroup: 03 April 2014

Entry Capacity Transfer & Trade Methodology (ECTT) National Grid will commence its Bi-annual review of the ECTT in 2014 National Grid requests that any issues with the methodology which may require review and revision to the statement are notified to National Grid via email by 30th April 2014 Issues to be sent via email to box.transmissioncapacityandcharging@nationalgrid.com Subject to Industry responses the formal consultation on any proposed changes to the ECTT Methodology Statement is expected to begin in summer 2014