ESSI CHANGE AND nonconformity control SYSTEM

Slides:



Advertisements
Similar presentations
Configuration Management
Advertisements

Understanding the Requirements Qimpro Standards Organization
ICAO Aerodrome Safety Workshop Almaty, Kazakhstan – 18 to 22 November 2002 NON-CONFORMITIES AND EXEMPTIONS AERONAUTICAL STUDIES.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Supplier Responsibilities for Failure Investigations.
ISO 9000 Certification ISO 9001 and ISO
Project Execution.
Five Star Quality Consultants Implementing ISO 9001 Corrective and Preventive Action.
© 2009 Michigan State University licensed under CC-BY-SA, original at Corrective Action.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Framework for Compliance, Verification, and Non-Conformance George Angeli LSST All-Hands Meeting Bremerton August 17, 2015.
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
From Research Prototype to Production
ISO 14001:2004, Environmental Management System
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
4.3 Document control 4.4 Review of requests, tenders and contracts
S15: Supervision and review. Objective of supervision and review  To ensure that the audit is done efficiently and effectively so that the audit opinion.
INSPECTION AND ACCEPTANCE CRITERIA. PRODUCT CONFORMANCE Dimensional conformance - within tolerances as defined on product drawing Dimensional conformance.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
Integrated Change Control 1 MEC-8. Processing of a Change Processing of a Change 2 Assess Impact within KA Change Request Implemented Change Create a.
Failure Modes and Effects Analysis (FMEA)
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Failure Modes, Effects and Criticality Analysis
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
Chapter 25 – Configuration Management 1Chapter 25 Configuration management.
WP3 Quality Assurance Rosario Principe Richard Berthet, Olivier Housiaux, Sabine Menu, Paula Alvarez Lopez International Review of the Inner Triplet Quadrupoles.
Quality Management: Mutually beneficial supplier relationships.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Accelerator Readiness Review October 31, 2006
Configuration Management
Software Configuration Management
Software Project Configuration Management
Project Quality Management
Software Quality Control and Quality Assurance: Introduction
NON-CONFORMITIES AND EXEMPTIONS AERONAUTICAL STUDIES
Chapter 18 Maintaining Information Systems
Configuration Management
Software Configuration Management
(Additional materials)
Software Requirements
4.5 Checking and Corrective Action Monitoring and Measurement
Quality Management Systems – Requirements
ISO 9001 Awareness Training.
Project quality management (PMI body of knowledge)
Engineering Processes
Agenda Who are we? 1 Introductions Journey so far 2
Nonconformance Tracking
Lockheed Martin Canada’s SMB Mentoring Program
EMS Checklist (ISO model)
Steps for product/material nonconformance:
ارائه كننده : مهدي كريمي
Software Quality Assurance
First Article Inspection
HART Technologies Process Overview
AS 9100 Awareness Training.
Chapter # 6 Software Configuration Management
Engineering Processes
Identification and marking of ESSI deliverables
Configuration Management
Quality assurance and Quality control organisation
How Do We Define Acceptance of a Cryomodule? - A Discussion
DOE Review of the LCLS Project October 2006
DOE Review of the LCLS Project 7-9 February 2006
Nonconformity Writing
Supplier Corrective ACTION RESPONSE REVIEW TRAINING
Presentation transcript:

ESSI CHANGE AND nonconformity control SYSTEM Quality Assurance and Quality Control – Learning and Planning Workshop - 30 June 2016 Christelle Cloué

DEVIATION CONTROL SYSTEM The procedure CEA-ESS-PJT-AQ-0004 (Procédure de traitement des non-conformités et des demandes de modification du projet ESSI) covers nonconformity and change request. It describes the process for the control of nonconformities and for the configuration baseline changes. As design configuration (baseline configuration) As built configuration Product life cycle Change and nonconformity control For the ESSI project, the reference configuration for an item is the configuration defined at the kick off meeting (extract from ESSI Quality Plan). Quality Assurance and Quality Control – Learning and Planning Workshop - 30 June 2016

OBjectives Ensure the traceability of all the nonconformities and change requests. All the discrepancies should be fully documented and processed. Ensure that nonconform items are identified and segregated from all other material in a quarantine area under QA supervision. Implement corrective actions to cure nonconformity. Implement preventive actions to eliminate the cause(s) of a nonconformity and prevent any recurrence. Quality Assurance and Quality Control – Learning and Planning Workshop - 30 June 2016

PROCESS flowchart Step 1: Detect and record the deviation Procédure de traitement des non-conformités et des demandes de modification du projet ESSI (Référence CEA-ESS-PJT-AQ-0004) Step 1: Detect and record the deviation Step 2: Analyse the root causes and the consequences Validate the corrective and preventive actions Step 3: Implement the actions Step 4: Check the actions and close the report Quality Assurance and Quality Control – Learning and Planning Workshop - 30 June 2016

Disposition on the product Use as is The item is found to be usable without eliminating the nonconformity. Rework The component is recoverable to conform completely to all specified requirements. It is possible that preliminary work is needed before the recovery, this work should not have any impact on the operations performed before and those that will be made later. A control recovery is required before further operations. Repair The component is recoverable such that it fulfils the intended usage requirements however it will not comply with the initial requirements. A control repair is required before further operations. Return to supplier A nonconform product may be returned to the supplier for repair or rework by it when they can not be performed in house. Scrap The component is affected by major nonconformities, it is not recoverable by rework or by repair for technical or economical reasons. Quality Assurance and Quality Control – Learning and Planning Workshop - 30 June 2016

Classification of the deviations 3 LEVELS MINOR CEA WP responsibility INTERMEDIATE MAJOR CEA PMO/WP responsibility MAJOR ESS L1 L2 L3 Safety of people and equipment X DEVIATION WITH « USE AS IS », « REPAIR » AND « SCRAP » DISPOSITIONS TRANSMITTED TO ESS ------------------ ALL MAJOR NONCONFORMITIES RELATIVE TO CAVITIES Operational, fucntional and technical requirements Interfaces with subsystems of the accelerator Reliability, maintenability and availability Lifetime Changes or nonconformance from approved qualification or established procedure Internal interfaces Deviations occurred during assembly and test   Minor deviation:  Deviation which cannot be classified major. In case of several minor deviations on the same component, the classification shall be reevaluated (remain minor or reclassified major). Quality Assurance and Quality Control – Learning and Planning Workshop - 30 June 2016

Corrective and preventive actions Corrective actions Actions to eliminate the deviation and/or the causes of the conformity. Preventives actions Actions to eliminate the cause of a potential nonconformity or other undesirable potential situation. It aims to prevent the occurrence of nonconformities on similar components. The boards shall establish criteria for checking that all the actions are performed and efficient. Responsible (s) for the actions are named during the boards. They will be consulted before the close-out of the nonconformity report. Quality Assurance and Quality Control – Learning and Planning Workshop - 30 June 2016

CEA deviation management BOards Deviation management board @ WP level  (CTE WP) include the following people: WP leader, System engineer WP, AQ engineer, Products responsible (depending on the subjects), Experts (depending on the subjects). Meeting every 2 weeks, the frequency will be adjusted in function of the project phase. Deviation management board @ PMO-WP level  (CTE PMO- WP) include the following people: Project leader, Instrument scientist, System engineering and configuration management officer, PMO AQ Engineer, WP leaders (depending on the subjects), AQ engineers (depending on the subjects), Quality Assurance and Quality Control – Learning and Planning Workshop - 30 June 2016

Step 1: Detect and record the deviation   DETECT and RECORD THE DEVIATION Member of the team Detect the deviation (NCR : nonconformity/ change request) and open a report for recording the event. (2 types of templates). AQ WP Record the deviation in the database (Excel file). AQ WP et member who initiates the report Classify the deviation in accordance with severity of their consequences and the importance of the affected function for the global performance of the system (experts consulted if necessary). Quality Assurance and Quality Control – Learning and Planning Workshop - 30 June 2016

STEP 2- Analyse the root causes and the consequences / Validate the corrective and preventive actions AQ WP Communicate the report to team members. WP leader + member who iniates the report Analyse the root causes and the consequences. Propose corrective and preventive actions. MINOR DEVIATION Board for deviation management @ WP level Decide the correctives and preventives actions after identifying all the causes and consequences. MAJOR DEVIATION Board for deviation management @ PMO-WP level Analyse the impact for the higher level (ESS). Propose corrective and preventive actions. Board for deviation management @ ESS-CEA level If the deviation has an impact at higher level, the corrective and preventive actions will be take by the ESS-CEA board (process to be defined). If the deviation has no impact at higher level, the dispositions for the corrective and preventives actions are taken by the CTE WP. Quality Assurance and Quality Control – Learning and Planning Workshop - 30 June 2016

WP leader + Design Office + responsible (s) of the actions STEP 3: Implement the actions Step 4: Check the actions and close the report   IMPLEMENT THE ACTIONS WP leader + Design Office + responsible (s) of the actions Implement the corrective and preventive actions AQ WP AQ PMO Check that all related actions have been performed, and verify the results of the tests/inspections.   CLOSE-OUT AQ WP AQ PMO Communicate the report after the close-out Quality Assurance and Quality Control – Learning and Planning Workshop - 30 June 2016

CONCLUSIONS Define an efficient process to manage deviations between CEA and ESS. Define all acceptance criteria (supplies, tests) to avoid generating many nonconformities. Each cavity shall be delivered with the major nonconformities reports. A list of all the nonconformities and changes will be adressed regularly to ESS. Quality Assurance and Quality Control – Learning and Planning Workshop - 30 June 2016