Extraction kicker scan & feedback results

Slides:



Advertisements
Similar presentations
#3224 Sat 17 th November Restored an “AP” set-up with some measurement of Twiss. – The idea was to take some BPM data with a known twiss set-up to see.
Advertisements

 Will help you gain knowledge in: ◦ Improving performance characteristics ◦ Reducing costs ◦ Understand regression analysis ◦ Understand relationships.
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
N. BlaskovicFONT Meeting1 Preliminary resolution study results N. Blaskovic.
D. R. BettFONT Meeting 30 Jan Summary of FONT Studies Jan 2014 D. R. Bett.
D. R. BettFONT Meeting 10 Feb Summary of FONT Studies Jan 2014 D. R. Bett.
Tests of DFS and WFS at ATF2 Andrea Latina (CERN), Jochem Snuverink (RHUL), Nuria Fuster (IFIC) 18 th ATF2 Project Meeting – Feb – LAPP, Annecy.
FONT Meeting1 Calibrations over IP LO power scan N. Blaskovic.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
FONT Meeting1 Waveforms with and without BPFs N. Blaskovic.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
CERN, BE-ABP (Accelerators and Beam Physics group) J. Pfingstner Beam jitter studies at ATF and ATF2 Jürgen Pfingstner Hector Garcia Morales 25 th of January.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
ATF2 Tuning Updates Glen White, SLAC Sept
EBPM kw achievements Kirsten Hacker. Summary Trombone fiducialization and characterization of hyteresis and backlash Accurate measurements of ACC1.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
1Ben Constance7 th January 2010 FONT5 December 2009 feedback results During the final shift we ran K1-to-P2 position feedback 151.2ns bunch spacing, quadrupoles.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Philip Burrows ALCPG11, Eugene 21/03/111 Performance of FONT at ATF2 Philip Burrows John Adams Institute Oxford University.
FONT Meeting1 Charge normalisation and IP LO power scan N. Blaskovic.
N. BlaskovicFONT Meeting1 ATF October 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
FONT Meeting1 3-BPM resolution with digital filtering N. Blaskovic.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Jitter Monitor – Overview and Status Report Glenn Christian, Alexander Kalinin 30 May 2005.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
FJPPL-FKPPL ATF2 Workshop Jitter studies March 18, 2014 Beam jitter localization and identification at ATF2 Marcin Patecki Jürgen Pfingstner 18 th of March.
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
The reading is 7.38 mm. The reading is 7.72 mm.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
N. BlaskovicFONT Meeting1 Feedforward runs N. Blaskovic.
FONT Oxford FONT REPORT NOVEMBER Neven Blaskovic Kraljevic and Talitha Bromwich Friday, 27 November
D. BettATF Operations Meeting - 15 June IP C. Perry G. Christian Y. Kim D. Bett N. Blaskovic Kraljevic.
N. Blaskovic, T. Bromwich, R. Ramjiawan
Expected hardware status and Priority of the commissioning task
Further Tracking Studies and March Trip Plan
Feedforward runs N. Blaskovic N. Blaskovic FONT Meeting.
Monitoring glitches in the frequency divider
FONT Meeting 10th February 2011
Firmware Update 29/03/2017 Rebecca Ramjiawan.
ATF Shift Plans Rebecca, Talitha 08/09/2017 Friday, 08 September 2017
SD0/QD0 Cryomodule Jitter Tolerance
Sub title- Authors (font 50; black; bold)
Progress towards nanometre beam stabilisation at ATF2
عمل الطالبة : هايدى محمد عبد المنعم حسين
Sub title- Authors (font 50; black; bold)
Sub title- Authors (font 50; black; bold)
Progress towards nanometre level beam stabilisation
E-JADE and the ATF beam stability goal
e+/e- Vertical Beam Size during CESR-c Collisions
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Sub title- Authors (font 50; black; bold)
e+/e- Vertical Beam Size during CESR-c Collisions
Sub title- Authors (font 50; black; bold)
Sub title- Authors (font 50; black; bold)
First Look at Error Sensitivity in MEIC
Multipole Limit Survey of Large-beta Dipoles
Presentation transcript:

Extraction kicker scan & feedback results N. Blaskovic N. Blaskovic FONT Meeting

Contents Extraction kicker scan results Feedback results Extraction kicker timing scan plot Extraction bump scan plot QK & QS quads on/off scan plot Feedback results Jitter for feedback on vs. feedback off N. Blaskovic FONT Meeting

N. Blaskovic FONT Meeting

N. Blaskovic FONT Meeting

N. Blaskovic FONT Meeting

N. Blaskovic FONT Meeting

N. Blaskovic FONT Meeting

Summary Optimum settings Feedback results Extraction kicker timing: 4.983 us Extraction bump: 0.15 mm Quads: QK off & QS on Feedback results Sub-micron jitter at P2 Micron jitter at P3, MQD14X & MQF15X N. Blaskovic FONT Meeting

Back-up Weighted average of k1GainScan_-3478, k2GainScan_-2341 & fbRun6-8 ± Standard Deviation of fbRun6-8   Jitter bunch 2 (fOFF) (um) Jitter bunch 2 (fON) (um) B-to-b correl. (fOFF) B-to-b correl. (fON) P1 3.40 ± 0.30 3.68 ± 0.53 0.81 ± 0.04 0.79 ± 0.05 P2 3.89 ± 0.30 0.65 ± 0.06 0.96 ± 0.05 -0.29 ± 0.16 P3 3.84 ± 0.16 1.07 ± 0.11 0.95 ± 0.05 0.48 ± 0.12 MFB1FF 28.29 ± 14.74 28.23 ± 11.49 0.59 ± 0.31 0.55 ± 0.32 MQD14X 1.89 ± 0.10 1.04 ± 0.12 0.88 ± 0.05 0.49 ± 0.14 MQF15X 4.67 ± 0.39 1.38 ± 0.17 0.93 ± 0.04 0.44 ± 0.13 N. Blaskovic FONT Meeting