ITU-T Focus Group Next Generation Network

Slides:



Advertisements
Similar presentations
GSC: Standardization Advancing Global Communications Update on ITU-T NGN activities since GSC10 Brian Moore Lucent Technologies Chairman of ITU-T Study.
Advertisements

GSC: Standardization Advancing Global Communications NGN-GSI TSR (Technical and Strategic Review) Chae Sub Lee, Dick Knight NGN-GSI TSR Coordinators SOURCE:ITU-T.
INTERNATIONAL TELECOMMUNICATION UNION Document 27 – E TELECOMMUNICATION STANDARDIZATION SECTOR TSB Directors Consultation Meeting on IPTV standardization.
Summary of Results Study Period ITU-T Study Group 11 Signalling Requirements and Protocols Yukio Hiramatsu.
Vientiane, Lao Peoples Democratic Republic, July 2012 Standardization for disasters Takashi Egawa, Vice chair of FG-disaster NEC Corporation
The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN WG (IP-TV Ad-Hoc Group) Chae Sub Lee
Summary of Results Study Period ITU-T Study Group 11 Signalling requirements, protocols and Test specifications Wei Feng.
NGN Architecture Overview Speaker: Chen-Nien Tsai Adviser: Kai-Wei Ke.
ITU-T Study Group 13 Communications to IETF CCAMP Working Group Marco Carugi ITU-T SG13 Liaison Officer to IETF CCAMP
NGN Management Focus Group 2 November 2004 Dave Sidor Interim Chairman Nortel Networks Tel Fax
1 CJK9, Zhangjiajie, China NID-related activities in ITU-T Document number Zhangjiajia, China 8-10 April 2009 Hyoung Jun KIM, Jun Seob LEE
TSB 1 Review of ITU-T activities between ITU & GSC 7 and GSC 8 Ottawa, Canada, 27 April – 1 May 2003 by Houlin ZHAO Director, Telecommunication Standardization.
TTA-ARIB/TTC-CCSA Meeting June 2002 How to study NGN? June 2002 The Telecommunication Technology Committee.
Proposal for work procedure of CJK editing team 6 March 2006 TTC For information.
Overview of SG11 Yukio Hiramatsu Chairman of ITU-T SG11 NTT, Japan.
Committed to Connecting the World ITU-T Cloud Computing standardization activities Dr Chaesub Lee, SG13 Chairman ITU Workshop on "Cloud Computing Standards.
The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN WG (IP-TV Ad-Hoc Group) Chae Sub Lee
Colombo, Sri Lanka, 7-10 April 2009 FORUM ON NEXT GENERATION STANDARDIZATION (Colombo, Sri Lanka, 7-10 April 2009) Session Moderator Ghassem Koleyni An.
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
CJK Standards Collaboration - Brief overview of CJK NID WG HyoungJun Kim Telecommunications Technology Association.
International Telecommunication Union Results of the first FGFN meeting in Lulea Naotaka MORITA Chairman of FGFN 14 July 2009.
Working Structure and methods for CJK N-iDs Working Group Chae Sub TTA, Korea.
NGN Management Related to FCAPS Interfaces: 27 July 2004 Dave Sidor Chairman, ITU-T SG 4 Nortel Networks/USA Tel Fax
Report of CJK editing team activities for NGN-draft Recommendations
14th CJK NGN-WG (Status of New SG 13) Chae Sub Lee
Review of new Question descriptions under ITU-T SG11
ITU-T Focus Group on Cloud Computing
Chae-Sub LEE TTA Summary Report of 6th FG NGN Chae-Sub LEE TTA
Proposal for study scope of CJK IPTV-adhoc group
(Tokyo, Japan, 4-5 February 2013)
Status report on CJK NGN Working Group
IPv6 based NGN and after (Use of NGNv6) March 31 – April 2, 2008
20th CJK UNIOT-WG (Standardization of Mobile IPTV in ITU-T)
Kangchan lee 20th CJK UNIOT-WG (Current Status of Cloud Computing Standardization Acuities in ITU-T) - Update of CJK-UNIOT Kangchan.
ATIS Cybersecurity DOCUMENT #: GSC13-GTSC6-12 FOR: Presentation
Hans (Hyungsoo) Kim KT corp.
CJK 10th NGN-WG (Status of NGN/NID-WG Discussion) Chae Sub, Lee
Status report on CJK NGN Working Group
CJK 10th NGN-WG (Preparation for the next SG13) Chae Sub, Lee
CJK 10th NGN-WG (Follow up IPTV-GSI) Chae Sub, Lee
CJK NGN WG (Proposal for drafting group on IPTV Standards)
ITU-T Next Generation Networks
ITU-T Study Group 13 Multi-protocol and IP-based networks and their internetworking Brian Moore.
ITU-T Study Group 15 Optical and other Transport Networks
ITU-T Study Group 11 Signalling Requirements and Protocols
ITU-T Special Study Group IMT-2000 and Beyond
Chae-Sub, LEE Chairman of FG NGN
Global Collaboration on Future Network Standardization
ITU-T Study Group 17 Data Networks and Telecommunication Software
Good Morning 1/17/2019.
Global Collaboration on Future Network Standardization
Marco Carugi Senior Advisor – Nortel, Carrier Networks
ITU-T IPTV standards development
TGac Status and Timeline
NGN 2004 Project status on July 25
Charles KIM TTA Collaboration Plan for CJK NGN Charles KIM TTA
Standardization Activities in TTC
Roles and Functions of CJK NGN WG for NGN Standardization Chae-Sub LEE
Architecture and Protocols
ITU-T SG16 Liaison Officer to CITS
ITU-T Study Group 16 Multimedia Services, Systems and Terminals
The CJK IT Standards Meeting July 5~7, 2004, Seoul, Korea
Overview of the TSB Director’s Ad Hoc Group on IPR
ITU-T Study Group 4 Telecommunication Management, including TMN
ITU-T Study Group 9 Integrated broadband cable networks and television and sound transmission Richard Green.
ITU-T Study Group 16 Multimedia services, systems
Hans, KIM TTA Release approach and CJK requirements Hans, KIM TTA
Chae-Sub LEE TTA Future Collaboration of CJK NGN-WG Chae-Sub LEE TTA
Session 3 Conclusions & Recommendations
Hans, KIM TTA Future of NGN Standards - FG NGN and SGs - Hans, KIM TTA
Presentation transcript:

ITU-T Focus Group Next Generation Network Chae-Sub, LEE

Contents Terms of reference Management Team FGNGN Organization Statistics Highlights of achievements Future work

Terms of Reference Nomadicity Architecture (base on IMS and non-IMS) General Mandates Nomadicity Architecture (base on IMS and non-IMS) QoS in the xDSL Access Authentication and Security Signaling and Control aspects from SG 11 Remaining works from SG 13 include JRG-NGN NGN Functional Architecture Nomadicity and Mobility QoS NGN Control and Signaling Capability Security Capability (inc. Authentication) Evolution from CGN to NGN

Management Team and FG Structure Chairman : Chae-Sub, LEE (Korea) Vice-Chairmen : Ron Ryan (USA), Dick Knight (UK) WG Area Leader(s) WG 1 SR (Service Requirements) Marco Carugi (Nortel Networks) Brent Hirschman (Sprint) WG 2 FAM (Functional Architecture, and Mobility) Keith Knightson (Canada), Thomas Towle(Lucent), Naotaka Morita(NTT) WG 3 QoS Hui-Lan Lu(Lucent), Keith Mainwaring(Cisco), Hans Kim (KT) WG 4 CSC (Control and Signalling Capability) Mr. Rainer Muench (Alcatel), Mr. Wei Feng (Huawei) and Mr. Cagatay Buyukkoc (ZTE) WG 5 SeC (Security Capability) Igor Faynberg (Lucent) WG 6 Evol (Evolution) Ghassem Koleyni (Nortel Networks), Fan Dongyang (Siemens) WG7 FPBN (Future Packet-based Network) Jiang Lintao (China), David Mayer (Cisco), Keith Dickerson (BT) COUNTRY: should be the letter acronym, e.g. USA, I (for Italy), J (Japan), etc, as used in the ITU list of participants Delete UNUSED rows in the PowerPoint table

Statistics (I) Father of FG NGN : Director of ITU-T Creation of a new Focus Group on NGN and 1st meeting : TSB Circular 236 + Addendum1 Kick off Meeting : 23 ~ 25 June 2004 180 contributions received (out of 246 Input documents) 17 Liaison Statements 3 meetings held : 23~25 June (Geneva), 19~23 July (Geneva), 27 Sep. ~ 1 Oct. (Ottawa) 28 Drafts are developing now

Statistics (II) Analysis of Input Documents 1st 2nd 3rd Total Input Contribution LS Others 1st 39 14 5 20 2nd 66 40 21 3rd 141 122 7 12 Total 246 180 17 53

Statistics (III) Analysis of Input Documents 1st 1st 2nd 2nd 3rd 3rd ROA SIO Others 1st 2 12 25 2nd 3 34 29 3rd 45 87 9 Total 50 133 63 Asia North America Europe Others 1st 2 12 23 2nd 8 22 3 33 3rd 60 48 11 Total 70 82 16 78

Highlights of achievements (I) WG Title Current Draft Target Date Release Status 1 NGN Scope FGNGN-OD-00037 1Q05 D Services & Capabilities FGNGN-OD-00038 Mobility Services & Capabilities TBD P NGN Release 1 general requirements FGNGN-OD-00036 2Q05 NGN general requirements (release-independent requirements) RI NGN general services and capabilities (release independent) 2 Requirements & Architecture for NGN FGNGN-OD-00035 Functional Requirements for NGN Mobility FGNGN-OD-00042 Functional Requirement for Soft Router FGNGN-OD-00043 Customer Manageable IP Network FGNGN-OD-00044

Highlights of achievements (II) 3 A QoS control architecture for Ethernet-based IP access networks (TR-123.qos) FGNGN-OD-00010 Feb. ’05 1 D Multi Service Provider NNI for IP QoS (TR-msnniqos) FGNGN-OD-00027 Feb. ‘05 General aspects of QoS and network performance in NGN (TR-NGN.QoS) FGNGN-OD-00045 RI Network performance of non-homogeneous networks in NGN (TR-NGN.NHNperf.). FGNGN-OD-00025 Requirements and framework for end-to-end QoS in NGN (TR-e2eqos.1) FGNGN-OD-00032 July ‘05 A QoS architecture for Ethernet networks (TR-enet) FGNGN-OD-00026 A QoS control architecture for ATM-based IP access networks (TR-atmipa) TBD P Resource and admission control sub-system (TR-racs) FGNGN-OD-00031 A QoS Framework for IP-based access networks (TR-ipaqos) FGNGN-OD-00033 Performance measurement and management for NGN (TR-pmm) FGNGN-OD-00024 May ‘05

Highlights of achievements (III) 4 TRQ.IP QoS.SIG.CS1 FGNGN-OD-00030 TBD D 5 NGN Security Framework FGNGN-OD-00034 6 Evolution of Networks to NGN FGNGN-OD-00039 1Q05 1 PSTN Evolution to NGN FGNGN-OD-00040 7 Problem Statement FGNGN-OD-00028 4Q04 Requirements FGNGN-OD-00029 2Q05 High Level Architecture 3Q05 P Candidate Technologies

Future Work (I) Development of Releases to realize NGN, step by step Target dates : Realization of NGN Services and Capabilities (include Network and Control Capability) Architecture and their components Specifications for Interfaces, etc. (?) End of 2006 (TBD) I/F 2 End of 2005 (TBD) I/F 1 NGN Release 1 NGN Release 2 Services & Capabilities : S&C 1 Functional Arc. & Spec. : FA&S 1 IW and Interconnection : IAI 1 Migration : MIG 1 NGN Release 3 S&C 2 = S&C 1+ A2 FA&S 2 = FA&S 1 + B2 IAI 2 = IAI 1 + C2 MIG 2 = MIG 1 + D2 FPS Based (?)

Future Work (II) 4th FG NGN Meeting : 30 Nov. ~ 3 Dec. 2004 (Geneva, Switzerland) 2 more meetings are planned February or March 2005 April or May 2005 Joint Management Meeting among SG 11, SG13 and FG NGN : 8 Dec. 2004