CONSTRUCTION DRILLING INC.
5. Shut Down Job and Clean Up 4. Perform Task 3. Prepare Site and Equipment 2. Select and Inspect Equipment 1. Plan Work QUIT EASY GUIDES AUSTRALIA PTY.
Step-by-step guide to prevent falls
© Easy Guides Australia The information in this show is for operating a Haul / Dump Truck A dump truck is a vehicle fitted with a tray that is designed.
Chapter 6 Cranes Crane Operation • Industrial Cranes • Mobile Cranes • Crane Inspections.
Coaster Car Challenge Slow Down…you are already moving at 18 km/hr.
Common workplace hazards
Step-by-step guide to prevent falls
© Easy Guides Australia The information in this show is for the following crane classes: Non-Slewing Mobile CranesDerrick CranesPortal Boom Cranes Tower.
The information in this show is for operating a Forklift Truck
Padstow Harbour Commissioner’s Workboat “MOWGLI”.
Loading and Hauling.
© Easy Guides Australia a work platform consisting of a work basket (platform), lifting mechanism and chassis that can raise and lower people and materials.
© Easy Guides AustraliaQLD Vet Edition New Queensland Licensing Pathway MAIN MENU Introduction SECTION 1 – Pre Operational checks SECTION 2 – Site / Job.
Powered Industrial Trucks - Operator Training (l) (a) (a)(2)(xiv) (b)(10) (d)
© Easy Guides Australia A scraper means a piece of earthmoving equipment with the ability to scrape and move a quantity of soil and to discharge it at.
© Easy Guides Australia An excavator means a self-propelled crawler or wheeled machine with an upper structure capable of up to a 360º rotation, which.
Lecture 4 Excavating and Lifting
© Easy Guides Australia A boom-type elevating work platform means; a powered telescoping device, hinged device or articulated device or any combination.
OSHAX.org - The Unofficial Guide to the OSHA
OSHA Office of Training and Education
Excavating and Lifting Hmwk Ch 2 # 1,2,5,8 Ch 3 #2,4,6,10.
OSHA Office of Training and Education1 Excavations – Subpart P.
Crane Modeling using Excel Please make sure your computer can play sounds. You should currently hear a sound instructing you what to do next.
CERTIFICATE 4 IN BUILDING BCGBC4004A. General Notes  Site clearing billed in m 2 & includes trees ≤0.5 m girth measured 0.5 m above ground  Tree removal.
Step-by-step guide to prevent falls Module E - Other Specifications Part C-1-Fall Protection Requirements for Construction.
Eng. Malek Abuwarda Lecture 5 P1P1 Construction Methods Lecture 5 Excavating and Lifting.
PROJECT 100. PROJECT 100 DESIGNED TO BE: Cost Effective Compact Strong Simple Light Reliable.
Safety : Cranes Introduction to Industrial Technology Spring 2014 Mr. Shubert 1.
5/20/2015Baltimore Polytechnic Institute Engineering Practicum – Dr. Smith.
Excavating and Lifting Part 3
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Safety : Excavations l Introduction to Industrial Technology l Spring 2014 l Mr. Shubert 1.
© Easy Guides Australia A Pallet Truck is: a truck designed to lift and transport goods on a standard pallet or platform. They can be manually or power.
Modeling and Simulation of a Mobile Robot for Polar Environments Thesis Presented by Eric Akers October 20, 2003 Committee Chair – Professor Agah Committee.
CONSTRUCTION TECHNOLOGY & maintenance
OSHA Crane Rule – Impact on other Machines Steve Neva AEM 25 th Joint Technical Liaison Meeting 16th-17th April, 2015 Tokyo, Japan.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
Construction Equipment Blind Spots
Excavations & Trenching 1 OSHA 1926 Subpart P Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) PPT
Conversion Tables.
L04: Understand the implications of the issues and constraints on building construction Lesson Objective To be able to explain the different plant required.
MNM Fatal Powered Haulage Powered Haulage September 13, 2005 (Pennsylvania) September 13, 2005 (Pennsylvania) Crushed Stone Operation Crushed Stone.
Excavation.
Bluestone Industry MSHA Inspection Violations. -Berms -Blasting -Electrical -Fire -Guards -HAZCOM Labeling -Health Violations.
OSHA Office of Training and Education
Bulb Piles –Franki Piles or pressure injected footings –Special form of cast in place pile with an enlarged base for increased load bearing F 10-4 Minipiles,
Excavation & Trench Safety
EQUIPMENTS FOR ERECTION AND COMPACTION. EQUIPMENTS FOR COMPACTION Compaction is the process where by material particles are constrained to pack more closely.
URW295C4URS (Tracked, Diesel)SPYDERCRANE Capabilities.
Excavation and lifting Excavator: Power driven digging machine Types 1. Hydraulic excavator 2. Cable operated excavator 3. Shovel 4. Draglines 5. Hoes.
Crane Hire and Rental Services 
Crane, Conveyor, and Rigging Part I - Crane OSHE 112, Spring 2016
SME 50/30 Meter Rule.
Visit us online at Crane Truck Sydney Services By DELTA TRANSPORT.
Your treestand is 10 yards from the ground
Protective Crane Design
Topic B.2: Sub-structure groundworks
3 Chapter Chapter 2 Fractions and Mixed Numbers.
ROUGH STONE TRANSPORTATION IN QUARRIES
Lifting Operations on Construction Sites
السلامة أولاً SAFETY FIRST.
Lecture 7 Excavators TSP-308 MPK Ferdinand Fassa.
Essential Question How do I add and subtract integers?
T-1280 VEHICLE LOADING CRANE
Understanding Variable-Geometry Outriggers
Be Safe كن في مأمن Partners in Safety Trench and Excavation Hazards
Do not use a calculator for the following!!.
CICA Lift of the Year ≤20 tonne load Entry Template
Presentation transcript:

The information in this presentation is for the operation of Non-slewing mobile cranes of: A non-slewing mobile crane means: a powered mobile crane which incorporates a boom or jib that is not capable of being slewed. It includes an articulated type mobile crane and a locomotive crane, but excludes a crane engaged in vehicle tow truck operation. Non-slewing mobile cranes may also be operated by persons holding a Slewing mobile crane operation certificate, or equivalent. A crane engaged in vehicle tow truck operation does not require a certificate to operate. A non-slewing mobile crane with a capacity of 3 tonnes does not require a certificate to operate.

An example of a Non-slewing Mobile Crane Slewing mobile crane (Rough terrain, hydraulic boom type)

Question 25. Should a crane be set up next to an open trench or excavation? (Explain you answer.) Answer: No. The crane should not be set up close to a trench or an excavation as the weight of the crane causes added pressure to the nearby soil. This can cause the trench or excavation to collapse and result in the crane overturning. WRONG

Question 25. (continued) What general rule would apply to setting up next to an open trench / excavation? Answer: As a general rule, the distance of the crane from the edge of the excavation/ trench should be at least the same as the depth of the hole. In other words, one meter of depth equals one meter from the edge (1.1). RIGHT

Answer: Close to the ground. Question 68. How close to the ground would you keep the load when mobiling? Answer: Close to the ground. WRONG RIGHT