Endstation Systems, Installation Costs and Schedule J. Hastings

Slides:



Advertisements
Similar presentations
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 7-1 Chapter 7 CHAPTER 7 THE EFFECT OF INFORMATION TECHNOLOGY ON THE AUDIT.
Advertisements

FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
LIGO-G M April 5, 2006 Interferometer Sensing and Control (ISC) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project Richard.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
SC Project Review of NCSX, April 8-10, 2008 Central Controls and Computing WBS51 & 52 P. Sichta WBS5 Work Package Manager.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
FACET User Support Carsten Hast Accelerator Research Division Test Facilities Department
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
Hall A Installation Review John J. LeRose 2/25/2009.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Lukens - 1 Contingency Reduction Review – 27 May 2005 The Run IIb CDF Detector Project Contingency Reduction Discussion Patrick T. Lukens Fermilab 27 May.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
WBS 1.03 Readout Systems Scope, Cost and Schedule
LUSI Coordination with LCLS
Experimental Facilities Planning
LCLS Ultrafast Science Instruments
End Station Test Beam (ESTB) at SLAC
Linac Coherent Light Source Procurement
WBS 5.0 LCLS Strategic Projects Division
John N. Galayda – Director of LCLS Construction March 30, 2009
J. Seeman Assistant Director for PPA/LCLS
Installation of Photon Beam Transport to FEH
Electron Beam Systems ETC and Methodology
X-Ray Endstation Design & Management/Commissioning
X-Ray Transport, Optics, and Diagnostics WBS Alan J
Diagnostics Richard M. Bionta, LLNL April 24, 2002
X-Ray Endstations Update
LUSI Controls and Data Systems W.B.S. 1.6
Tom Fornek Project Manager April 20-22, 2009
Conventional Facilities (WBS 1
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
(WBS ) Alan Wootton, LLNL April 24, 2002
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Project Management Issues John N. Galayda, SLAC April 24, 2002
EVMS Status and Overview
Optics John Arthur, SLAC & William W. Craig, LLNL April 24, 2002
Experimental Program and Endstations System (WBS ) J
NEH - Status Stefan Moeller.
PIXEL Project Status John Arthur Photon Instrumentation for
Coherent X-ray Imaging Instrument WBS 1.3
DOE Review 7-9 February, 2006 Steve Lewis
Control System Overview Hamid Shoaee LCLS Control System Manager
X-Ray Endstation Design & Management/Commissioning
Electron Beam Systems ETC and Methodology
Undulators Subgroup Summary April FAC Review K. Robinson, J
LCLS Undulator System Detailed Report
LCLS e- Beams System Overview
CF Scope, Management & Organization
X-Ray Endstation Systems (XES) 2006 Schedule
LCLS e- Beams Systems Manager
Control System Overview Hamid Shoaee LCLS Control System Manager
LCLS Instrument MIE Project: Staffing, Schedule
LUSI Controls and Data Systems W.B.S. 1.6
Presentation transcript:

Endstation Systems, Installation Costs and Schedule J. Hastings Endstation Systems, Installation Costs and Schedule J. Hastings. SLAC April 24, 2002 WBS Costing Methodology Detailed Costing Schedule LCLS DOE Review, April 24, 2002 J. Hastings SLAC

1.3.2 Endstation Systems 1.3.2.1 Endstation systems PED 1.3.2.2 Endstation mechanical 1.3.2.3 Endstation vacuum 1.3.2.4 Endstation Data Acquisition (DAQ) 1.3.2.5 Endstation laser 1.3.2.6 Endstation PPS LCLS DOE Review, April 24, 2002 J. Hastings SLAC

1.3.3 Installation and alignment 1.3.3.1 Overall survey 1.3.3.2 Component stands 1.3.3.3 Vacuum tanks 1.3.3.4 Optical element alignment 1.3.3.5 Precision alignment LCLS DOE Review, April 24, 2002 J. Hastings SLAC

Costing Methodology Costs estimated by cognizant engineers/scientists Ordinal List of components developed from CDR Costs based on experience with similar systems Contingency Assigned on the basis of the completeness of the design, comparison with recent comparable components, and knowledge of catalog prices where available LCLS DOE Review, April 24, 2002 J. Hastings SLAC

1.3.2.1 Endstation System PED Design and prototype systems Assembly and installation procedures Prepare bid packages In particular--- 1.3.2.1.3 vacuum Design laser-matter interaction chamber 1.3.2.1.4 DAQ Development of PAD prototypes Streak camera optimization LCLS DOE Review, April 24, 2002 J. Hastings SLAC

1.3.2.2 Mechanical 1.3.2.2.1 PPS Mechanical Beam absorbers Beam stoppers 1.3.2.2.2 Endstation mechanical Spectrometers Support tables Standard designs, catalog items LCLS DOE Review, April 24, 2002 J. Hastings SLAC

1.3.2.2 Mechanical (FY02 Dollars, Thousands) Name PED Construction Contingency Total 1.3.2.2 Mechanical - $ 938 $ 264 $ 1,202 1.3.2.2.1 PPS Mechanical $ 446 $ 115 $ 562 1.3.2.2.2 Endstation Mechanical $ 491 $ 149 $ 640 LCLS DOE Review, April 24, 2002 J. Hastings SLAC

1.3.2.3 Endstation Vacuum Vacuum chamber for laser-matter interactions Accommodate several sample types: gases, clusters, solids Accommodate variety of detectors Many standard components are catalog items LCLS DOE Review, April 24, 2002 J. Hastings SLAC

1.3.2.3 Vaccum (FY02 Dollars, Thousands) Name PED Construction Contingency Total 1.3.2.3 Vacuum - $ 558 $ 120 $ 678 1.3.2.3.1 Vacuum Components $ 304 $ 68 $ 372 1.3.2.3.2 Experimental Chambers $ 254 $ 52 $ 306 LCLS DOE Review, April 24, 2002 J. Hastings SLAC

1.3.2.4 Data Acquisition Infrastructure Network Beamline controls Existing systems form the basis of the design Detectors Beam imaging Streak camera: state of the art 2-D PAD; significant design and prototyping needed Computer costs tend to remain constant, but capability grows LCLS DOE Review, April 24, 2002 J. Hastings SLAC

1.3.2.4 Data Acquisition (FY02 Dollars, Thousands) Name PED Construction Contingency Total 1.3.2.4 DAQ - $ 4,276 $ 1,770 $ 6,045 1.3.2.4.1 Controls $ 1,278 $ 447 $ 1,726 1.3.2.4.2 Detectors $ 2,997 $ 1,322 $ 4,320 LCLS DOE Review, April 24, 2002 J. Hastings SLAC

1.3.2.5 Laser system Costed by P. Bolton, identical components to gun laser system LCLS DOE Review, April 24, 2002 J. Hastings SLAC

1.3.2.6 PPS Personnel protection based on existing systems at SSRL MPS systems based on existing systems at SSRL Standard designs, catalog items LCLS DOE Review, April 24, 2002 J. Hastings SLAC

1.3.2.6 PPS/MPS Systems (FY02 Dollars, Thousands) Name PED Construction Contingency Total 1.3.2.6 PPS/MPS Systems - $ 650 $ 107 $ 757 1.3.2.6.1 PPS System $ 360 $ 73 $ 433 1.3.2.6.2 MPS Systems $ 290 $ 33 $ 323 LCLS DOE Review, April 24, 2002 J. Hastings SLAC

1.3.2 X-Ray End Station Systems (FY02 Dollars, Thousands) Name PED Cost $K Construction Contingency Total % contingency 1.3.2 X-ray Endstation Systems $ 4,890 $ 8,405 $ 4,316 $ 17,612 32% 1.3.2.1 PED $ 1,658 $ 6,548 34% 1.3.2.2 Mechanical $ 938 $ 264 $ 1,202 28% 1.3.2.3 Vacuum $ 558 $ 120 $ 678 21% 1.3.2.4 Controls $ 4,276 $ 1,770 $ 6,045 41% 1.3.2.5 Laser Systems $ 1,984 $ 398 $ 2,382 20% 1.3.2.6 PPS/MPS $ 650 $ 107 $ 757 16% LCLS DOE Review, April 24, 2002 J. Hastings SLAC

Endstation System Schedule LCLS DOE Review, April 24, 2002 J. Hastings SLAC

1.3.3 Installation and Alignment Cost based on extensive SSRL experience for similar components Per unit costs developed, totals based on component count LCLS DOE Review, April 24, 2002 J. Hastings SLAC

1.3.3 Installation and Alignment (FY02 Dollars, Thousands) Name PED Cost Construction Contingency Total % Contingency 1.3.3 Install and Align $ 219 $ 76 $ 295 35% 1.3.3.1 Overall Survey $ 71 $ 25 $ 96 1.3.3.2 Component Stand $ 61 $ 21 $ 82 1.3.3.3 Vacuum Tanks $ 59 $ 20 $ 79 1.3.3.4 Optical Elements $ 18 $ 6 $ 24 1.3.3.5 Precision Alignment $ 10 $ 4 $ 14 LCLS DOE Review, April 24, 2002 J. Hastings SLAC