Team P09007 Derek Horton Matthew Sennett Lucas Sienk Matt Sones

Slides:



Advertisements
Similar presentations
Peter Davis Builders, Inc. Building with Care, Integrity & Expertise since 1981.
Advertisements

Lab 09: Performance Test 1 Advanced Energy Vehicle.
Artificial Limb Project By Casey Dill. Mission Statement This project will improve upon existing plans for an artificial arm with the same capabilities.
1 Status presentation in 2 weeks Give an updated elevator speech for your project Cover status of schedule, scope & budget Are you meeting with your team.
P11228 Week 2 Japh Learn Joseph Corea Tim Monahan Bryan Reinheimer Ed Gliss.
MSD 11209: WOCCS: Long-Range RF Module Meet the Team Danelle Grabski- Electrical Engineering Jacky Ng- Electrical Engineering Josh Doolin- Electrical.
System Level Design Review P10054 October 9, 2009 Monitoring Device for Human Smoking Behavior.
Project Review. Current State Currently on track to meet our mission objectives and cover all customer needs – Unpredictable to know whether or not sensors.
Status Update for P09321 Automatic Medicine Dispenser.
Preliminary Design Review HMS ‘Hound Dog’ Matt Prygoski Matt Morris Dan Zibton Fred Thwaites Jay Slaggert Thursday February 7, 2008.
Pratham Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CADCAM: Fraterno Vila Electronics/Control Engineer: Nick Martin.
EDGE™ A P D C Copyright © 2004 Dr. Edward Hensel P.E. and P.H. Stiebitz. All rights reserved. Technical Data Package & Team Notebook …what is it anyway?
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 2 – End Of Day:  Progress Update  Concept.
Ground Scouts P09207 Team: Stewart Wadsworth (ME) Alex Sojda (EE) Josh Watts (CS) Matt DiMicco (EE) Tae Cooke (EE) Faculty Guide: Dr. Sahin (EE) Primary.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Design Project Management
Low Cost Fundus Camera P15590 December 11th, 2014
Project planning. Software project management Informal definition of management – The art of getting work done through other people Software project management.
Project Lifecycle Section 6 - Closeout. Project Manager’s Role During Project Close-Out  Ensure that all project deliverables have been completed and.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
Travel Website Enhancement Project Project Update First Name Last Name.
Design Project Management Design Project Managers Identify tasks Make and update plans Sequence tasks Allocate time Allocate People and Resources Monitor.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
Project Status Report Presenter Name Presentation Date.
Wegmans Bread Tray Lift Assist By Brendan Moran,Greg Feather Alex Phillips and Andrew Beasten.
What is it? A risk is a potential problem — it might happen, it might not. But, regardless of the outcome, it’s a really good idea to identify it. Assess.
Project Active Vibration Cancellation. The Team NameDisciplineRole Kaitlin PeranskiIndustrial and SystemsProject Leader/ Edge Updating Jeremy BerkeElectricalScribe.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number: P
CS-EE 481 Spring February, 2006 University of Portland School of Engineering Project Molalla Microprocessor-based Charge Controller Team Andrew Melton.
WEEK 1 You have 10 seconds to name…
XLIX Engineering Design Firm © 2010 ENGR/ETGR Definition of Project 1 A project is “…a combination of human and non-human resources pulled together.
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
Project Closeout Report. Closeout Components Project Objective Results Deliverable Results Lessons Learned Summary and Team Feedback Final Project Organization.
MSD 1 WEEK 6 SYSTEM DESIGN REVIEW Team Rochester Institute of Technology College of Engineering P /2/
Seminar 1 IT511: Information Systems Project Management Seminar 1 IT511: Information Systems Project Management Instructor Chad McAllister, PhD.
Complete Design & Gate Review. Complete Design Detailed Design Review (DDR) 1.“High and medium technical risk” areas –Design Review (Prelim-DDR): standard.
CIT 341: IT Project Management. Objectives Understand the main concepts of project management Understand how Projects are Delivered within Budget Learn.
ACPS Middle School Guide Process Dr. Haas met with the team to review the task and assign roles MS Guide and exploratory document.
Fall CS-EE 480 Lillevik 480f06-l4 University of Portland School of Engineering Senior Design Lecture 4 Definition phase Design phase.
Successfully Managing Customer Expectations Change is expected to occur during the life of any project, but this change must be controlled and managed.
MGT 437 OUTLET Become Exceptional/mgt437outlet.com FOR MORE CLASSES VISIT
DEVRY SBE 440 E NTIRE C LASS Check this A+ tutorial guideline at For more classes visit
ASH BUS 435 Entire Course Check this A+ tutorial guideline at BUS 435 Week 1 DQ 1 New or.
MGT 437 Week 3 Learning Team Project Planning Technical Paper To purchase this material click below link
MGT 437 Week 4 Learning Team Project Planning Human Capital Paper To purchase this material click below link
WEB 237 Week 2 Learning Team Planning, Brainstorming and Outlining Identify the competition, challenges and recommended process to create an eCommerce.
BUS 475 Week 4 Learning Team Communication Plan Outline Develop a generic communications plan and template. This template will be used to develop a communication.
Risk Assessments: Guidelines for Completing
P07203 Dynamometry Laboratory Infrastructure
Baja Hybrid Drivetrain Design P14224
Project Plan Checklist Bus ESMBA Rich Okumoto
P17082 Biomechanical Elbow Model Final Presentation
مفهوم الموازنة العامة المقدمة
Project Review P07442: Thermoelectric Demonstration Test Bed
Sample Engineering Design Models
Grading Components Component Percentage Exam 1 20% Exam 2 Exam 3
Xoserve IX Refresh Customer Update 03/01/2019.
Lancaster ISD 2015 Bond Program Update
P09701: Corning Tropel LightGage Metrology System
Kate Gleason College of Engineering Multidisciplinary Senior Design
Final Status Update P09006 – Upper Extremity Exerciser
Project status update template

Advanced Energy Vehicle
Preliminary Detailed Design Review: P18001
University of Idaho – Interdisciplinary Engineering Capstone Design
Project Update.
NOTICE! These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.
Presentation transcript:

Team P09007 Derek Horton Matthew Sennett Lucas Sienk Matt Sones Jeremy Tosh Barrett Zeinfeld

What we wanted to accomplish this week… Specifications (finalize) Final Project Plan Concept selection review Create concepts and Select a concept Action items and schedule for wk 4 Sales Pitch Increase Budget

What we did accomplish this week… Fine tuned more specifications Came up with concept review process Generated concepts to be discussed Selected a concept Brainstormed Action Items for next week Finalized project plan  Updated risks & action items Met with customer to update them

Action Items for next week  Meet with Dr. Hensel to finalize budget Update EDGE More Testing System level design progress report System level design Engineering analysis Risk assessment and proof concept