Seek assistance of Banksman while reversing the vehicle

Slides:



Advertisements
Similar presentations
Always start a vehicle correctly
Advertisements

Always use the correct lifting equipment
PDO Second Alert What happened? Your learning from this incident..
Always use mechanical handling aids when carrying out a heavy lift
Always use mechanical handling aids when carrying out a heavy lift
Keep a safe distance between the vehicle in front
Always stay alert while driving, and observe other drivers behaviour
Always use 3 points of contact when using ladders
PDO Second Alert Date: Incident : LTI What happened?
Comply with Safe Operating Procedures
Always stay out of the line of fire
Never place yourself in line of fire
PDO Second Alert Date: Incident title: Fall from Height
Drive with appropriate speed to road conditions
Use right tools for the job and use them correctly
Avoid taking shortcuts
Ensure a working platform is adjusted and used
Always Drive to road conditions
PDO Second Alert What happened?
PDO Second Alert What happened? Your learning from this incident..
Keep away form ‘line of fire’
Keep away from “Line of Fire”
Always use the right equipment for the task !!!!
Always follow Night driving rules
Ensure 3 point contact maintained whilst using ladder
Follow the rules to save a life
Ensure OHL Clearance required for your lifting activity
No hands on elevator while delivering pipe
Never put your Hands in line of fire
PDO Second Alert What happened? Your learning from this incident..
Ensure cat line are under tension before removing elevator bolts
Beware of Fall hazards while working at edge of trailer
Adequate tethered tools
Pay attention to your footing
PDO Second Alert Date: Incident title: HiPo MVI
Crane operating with boom lowered and under Supervision
PDO Second Alert Date: Incident: LTI What happened?
Always report Near Misses
Always use the right equipment for the task
PDO Second Alert Date: Incident title: HiPo Asset Damage
Tiredness and Speed Can Kill!
Always use your hands to set the slips
Ensure that all Rig moves are carried out by competent personnel
Always stay away from line of fire
PDO Second Alert What happened? Your learning from this incident..
PDO Second Alert What happened? Your learning from this incident..
PDO Second Alert Date: Incident title: HiPo What happened?
Always ensure “no go” zone are in place
PDO Second Alert Date: Incident title: MVI Rollover
PDO Second Alert Photo explaining what was done wrong
Always ensure your journey is authorised
Use only certified lifting equipment in good condition
Safe distance from the edge Maintain a safe distance while driving
Always keep your equipment maintained
PDO Second Alert What happened? Your learning from this incident..
Check Level Setup prior Lifting & Lowering Operation
Always adhere to Red/No Go zones
Always drive to the road conditions!
SHORTCUT ROAD DRIVING IS DANGEROUS
Keep away from “Line of Fire”
Your safety should always be built on SOLID ground
Vehicles to Keep Safe Distance at all times
Drive as per the road condition
Confidential - Not to be shared outside of PDO/PDO contractors
Always position the crane boom correctly before slinging the casing
Keep away from the line of fire
Only overtake when safe to do so
Beware of raised edges of walk ways.
Keep hands out of the line of fire
Maintain Healthy Diet Along With Good Physical Exercise
Presentation transcript:

Seek assistance of Banksman while reversing the vehicle PDO Second Alert Date: 28.04.2018 Incident title: HiPo What happened? While the tipper driver was offloading the soil in the work location for road resetting work, due to the uneven surface the tipper fall to the side. Your learning from this incident.. Ensure the surface condition before parking Always ensure banksman is used for vehicle movement, reversing and offloading materials. Ensure TRIC been used effectively. Ensure proper planning and adequate resources available for the activity Adequate supervision You are Empowered to STOP if not Safe Seek assistance of Banksman while reversing the vehicle

Management self audit Date: 28.04.2018 Incident title: HiPo As a learning from this incident and to ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: Do you ensure adequate manpower resources available to perform the activity? Do you ensure your HEMP covers all the hazards involved in each task and is communicated to your workforce? Do you ensure your TBT covers all associated hazards for the activity? Do you empower your team to stop unsafe act/condition? Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask other contractors if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Pretend you have to audit other companies to see if they could have the same issues.