Harmonisation and standardisation – Status and way forward

Slides:



Advertisements
Similar presentations
European Commission - DG Environment Unit D.2: Water & Marine 1 Pau-Plenary Session 14 may 2008 Pau-Plenary Session 14 may 2008 CMA developments and state.
Advertisements

CMA-3 Support to Standardisation 8 th CMA Plenary Meeting in conjunction with NORMAN and EAQC-WISE final meetings Paris, France, 21 st October 08 Ulrich.
WG 2A ECOSTAT 7-8 July 2004 Task on Harmonisation of Freshwater Biological Methods Status Report AC Cardoso and A Solimini Harmonisation Task Team: JRC.
WG 2A ECOSTAT Meeting 4-5 March 2004 Meeting of the WFD CIS Working Group 2A ECOSTAT summary Presented by Anna-Stiina Heiskanen Joint Research Centre The.
European Commission - DG Environment Unit D.2: Water & Marine 1 Need for continuous exchanges on chemical monitoring issues, in the light of the on-going.
Water.europa.eu Draft mandate WGE Chemical Status WG E Priority Substances 8-9 October 2009 Jorge Rodriguez Romero Madalina David DG Environment, European.
Updating the intercalibration process guidance Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Task on Harmonisation of Freshwater Biological Methods
Common Implementation Strategy for the Water Framework Directive Working Group A ECOSTAT Ecological Status 7th Meeting Stresa, Lago Maggiore, Italy
IC network selection process
New Work Programme and mandates 2005/2006
Synthesis of the intercalibration process Working group 2.5.
Working Group 2A ECOSTAT Objectives & Agenda of the meeting March 2005
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Strategic Coordination Group Eutrophication Guidance
Task 1 - Intercalibration WG 2A ECOSTAT - Intercalibration
Progress report Working Group D - Reporting SCG meeting May 2008 Unit D.2 Water and the Marine - WFD Team.
Bruxelles 17 october-2007 WG E Meeting
Chemical Monitoring Activity (CMA)
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, October 2005 Progress in the intercalibration exercise.
Task on harmonization WFD Annex V 1.3.6
Progress report ATG Hymo 1 May – 20 October 2016
19th meeting of the WG GES 22/03/2018
Philippe QUEVAUVILLER
Harmonisation Activity Progress report
Progress report Working Group D - Reporting SCG meeting May 2008 Unit D.2 Water and the Marine - WFD Team.
Common Implementation Strategy for the
Philippe Quevauviller
Chemical Monitoring Activity (CMA) ( )
Update on progress since last WG meeting (13-14 June 2002)
Meeting of the WFD CIS Working Group 2A ECOSTAT Introduction & objectives Presented by Anna-Stiina Heiskanen Joint Research Centre The Institute.
Meeting of Water Directors Eutrophication Guidance
New mandates for Working Groups A, C and D including GIS
Meeting of Water Directors Future Work Programme of the CIS
Progress Report Working Group A Ecological Status Intercalibration (1) & Harmonisation (3) Activities Presented by Anna-Stiina Heiskanen EC Joint Research.
WG GES: Decision review progress
of the Work Programme 17. March 2003
WFD – CIS Working group A ECOSTAT
Activities of WG A Ecological Status
Water Framework Directive 2000/60/EC
WG A Ecological Status Progress report April-October 2009
EU Water Framework Directive
Water Directors meeting Mondorf-les-bains, June 2005
Working Group A ECOSTAT progress report on Intercalibration Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
ECOSTAT 2013 – 2015 Tasks and Deliverables
Brussels 7 November 2007 SCG Meeting
WG A ECOSTAT Intercalibration guidance : Annexes III, V, VI
WFD CIS 4th Intercalibration Workshop
WG C-1 activity Berlin – 3 May 2007
Status of the Nutrient Best Practice Guide
Standardisation/Harmonisation
Strategic Co-ordination Group May 2009
Activity on Eutrophication
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, 22 Febraury 2006 Progress Report.
Common Implementation Strategy for the
WG A Ecological Status Progress report April-October 2010
EU Water Framework Directive
Reporting template for milestone reports
Common Implementation Strategy for the
EU Water Framework Directive
WFD CIS WG ECOSTAT meeting on 8-9 October 2007 Objectives What do we need to achieve during this meeting?
WG A ECOSTAT Draft Mandate
Harmonisation Activity Progress report
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Brussels – 20 April 2007 European Commission - DG Environment
EU Water Framework Directive
EU Water Framework Directive
WG A Ecological Status Progress report October 2010 – May 2011
CMA-1 activity Berlin – 2 May 2007
Presentation transcript:

Harmonisation and standardisation – Status and way forward ECOSTAT meeting, Ispra, 3-4 July 2007

Since the last ECOSTAT meeting there has been a number of actions concerning the Harmonisation/ Standardisation of biological methods: JRC call to ECOSTAT for nomination of experts for the Harmonisation drafting group Initiative for a mandate from DG Environment to CEN to develop standards relevant for the WFD, including biological methods CEN meeting in Vienna Meeting DGEnv, CEN ,JRC

Contents Update on Harmonisation activity (AC Cardoso): state of nominations agreements with CEN to improve communication Introduction of the discussion document for the Identification of standardisation needs (JR Romero): prospects for mandate, context and discussion Update on CEN TC230 WG2 work (R Sweeting): special focus on proposal to QA/QC existing standards

Harmonisation drafting group Aim is to develop guidance including an understanding of the requirement in WFD Annex V 1.3.6 and an analysis of the long-term standardisation needs for WFD implementation, building on experience from the IC exercise It will start later this year and the guidance document is expected to be to be finalised by the end of 2008 As announced in the ECOSTAT of April, JRC sent out a request for nominations of experts for a drafting group on Harmonisation. So far only two nominations: Maria Belli, Italy Andrea Zagyva, Hungary

Agreement with CEN to improve communication ECOSTAT representative for CEN TC230 WG2 matters - AC Cardoso Proposed the nomination of one ECOSTAT expert for each Task Group in CEN TC230 WG 2 All ECOSTAT members are encouraged to establish proper links with their national standards organisations. Standards experts should do the same. Confirmation that this has been completed can then be made in writing by individuals. Further confirmation is then required by relevant standards experts that this dialogue is open CEN TC230 WG 2 and TG Leaders/, ECOSTAT representatives, JRC and DG Environment need to meet at regular intervals In order to meet the timescale and quality of outputs it was agreed that consideration should be given to the secondment of a coordinator to ensure that both CEN and ECOSTAT groups work smoothly. This secondment will be for someone who is familiar with the WFD process, ECOSTAT and CEN