Break Out 3: CM and License Renewal

Slides:



Advertisements
Similar presentations
ATLAS Utility Management Software BobComm 2004 January
Advertisements

November, 2010 RAM &ITS Telco with NRC to determine project plan & requirements for implementation of LTS May, 2011 Received LTS Lite & installation documents.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
Application of Asset Management Principles During Asset Creation and Design Presented By Pervaiz Anwar at: CWEA, San Francisco Bay Section Asset Management.
SE 555 Software Requirements & Specification Requirements Management.
Planning. SDLC Planning Analysis Design Implementation.
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
1 NRC Follow-up Actions on NESCC Task Group Reports (Concrete Repair, Cabling and Welding) NESCC Meeting November 7, 2013 Richard Jervey USNRC Office of.
INFO 637Lecture #31 Software Engineering Process II Launching & Strategy INFO 637 Glenn Booker.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Managing Projects using Oracle Project Management (PJT) & SPREADSHEETS Neeraj Garg Vice President, Client Services.
ICAO Aerodrome Safety Workshop Almaty, Kazakhstan – 18 to 22 November 2002  AERODROME MANUAL.
Field Questions. –Asked by sub or GC when discrepancy in construction docs or existing site conditions Design change verification request Field information.
Software Quality Assurance Activities
University Technology Fee Presentation to: Student Fee Review Board November 30, 2004.
State of Maine NASACT Presentation “Using the Business Case to Guide a Transformation Procurement” 1 Using the Business Case to Guide a Transformation.
Investment Model for Moving to a Data– Centric Configuration and Asset Information Management System Breakout Session June 9, 2015 Bob Renuart – Renuart.
2007 CMBG Conference David Hembree Institute of Nuclear Power Operations June 20, 2007 Charleston, SC INPO Perspective on Configuration Management.
Re-Implementing ERM MENA-IUG 5 th Annual Conference 1-2 November 2010.
Using error reports in SPI Tor Stålhane IDI / NTNU.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Danger, Danger! High Voltage How the Coast Guard Reshaped C4IT System Accounting and Management.
BEST GROUP CONSULTANTS Lesson Department Information System.
Formal Methods in Software Engineering
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
Systems Development Life Cycle
Configuration Management Fundamentals including Margin Management Bill Kline FirstEnergy Nuclear Operating Company (FENOC) June 2, 2008 Shell Beach, CA.
Electronic Design Change Process Paul Tobin Jr.- PKMJ Technical Services.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
2006 CMBG Conference Mike Stout Spescom Software, Inc. Configuration Management For The Next Generation.
Guide to transparency in budget formulation Session 6: Ensuring transparency in budget planning and formulation.
Federal Regulations Federal regulations are the third primary source of American law discussed. Proposed regulations and final regulations are published.
Welcome to the Permit Implementation Regulations (AB 1497) Workshop.
Asset Degradation Modelling at Townsville Water
JMFIP Financial Management Conference
Chapter 7 Schedule Control
Strategic Planning – How it All Comes Together
Managing the Information Systems Project
Committee on Information Technology Planning and Budget Sub-Committee
Project Management Chapter 3.
Accredited Standards Committee C63® - EMC
Chapter 18 Maintaining Information Systems
AERODROME MANUAL.
South Carolina Perspective on Part 61 Proposed Revisions
Ex Ante Review Overview
Development Projects / Analysis Projects / On-site Service Projects
Change Control Module P5 LEARNING OBJECTIVES: LEARNING OUTCOMES
Project Roles and Responsibilities
NRC CM Pilot Inspections Methodology and Results
Engineering Processes
Electronic Systems (eGIF)
Drainage Management In Calcasieu parish 2.0
CMAST Update March 25, 2014.
Data Quality By Suparna Kansakar.
Managing Design and License Basis Info
Reducing Managed Facility Configuration Information
Chapter 9 – Software Evolution and Maintenance
Results of Design Reviews
Models in Engineering Action Plan Name.
Doing the Best We Can With What We Have
Connecting pre and post award Title III: Technical assistance workshop
Chapter 7 Schedule Control
Vendor Technical Information
VERITE – Dissemination plan
The Imaginist Framework for Benefits Realisation
Basic Principles of Estimating
Break Out 5: AP-929 Revision
Break Out 1: CM of Digital Equipment
Code of Ethics for CDM Professionals
Code of Ethics for CDM Professionals
Presentation transcript:

Break Out 3: CM and License Renewal Facilitator: Bill Kline - FENOC May 10, 2019 Cleveland 2005

Aging Management Programs What New Areas Were Identified? Cable inspections, medium voltage cables New programs represent 5% of total site programs (50) 75% ASME Mech - existing program 20% Civil - existing program Broader program approach, encompassing materials at plant Current CM Deficiencies Identified? Identified Pipe class inconsistent May 10, 2019 Cleveland 2005

Effects on CM Budget Proposed Changes in $ and Resources Estimates of $20 million (high end) / full time staff supplemented w/contract support Identifying Cost/Benefit The opportunity to operate 20 more years is not a guarantee that economics will make worthwhile Accessibility Issues w/ Existing CM Data May require reconstruction w/ poor info trail Electronic linking of various databases May 10, 2019 Cleveland 2005

Reference Documentation Use of Databases to Track Project Creation of a table of all systems / programs used as a guide and being maintained current Controlling Basis Document Revisions Critical to keep track of revisions / provide updates May 10, 2019 Cleveland 2005

Effect on CAP Types of Errors Identified Criticality of Errors The need to recreate document, perform analysis Old data in equipment database out of date Criticality of Errors Level of rigor put forth with issues identified in CAP may be viewed favorably by regulator Need for Operability Determinations None noted May 10, 2019 Cleveland 2005

Take Away Points Group Insights Look ahead to what programs will require Broaden scope where possible Understand costs to maintain configuration integrity Don’t build a bow wave at end of current license Easy to commit now, difficult to deliver later Track the basis for the LR connection Control subsequent revisions for negative impact May 10, 2019 Cleveland 2005