1 Storm Center ® Online Outage Map Tim Prince, Emergency Operations Bob Williamson, GIS Support

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

1 IDX. 2 What you will learn: What IDX is Why its important How to use it Tips and tricks Introduction Q & A.
Advanced Piloting Cruise Plot.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Page 1 Outage Management Roy Hoffman 29 Jan 2001.
Slide 1 FastFacts Feature Presentation March 11th, 2008 We are using audio during this session, so please dial in to our conference line… Phone number:
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
17 Copyright © 2005, Oracle. All rights reserved. Deploying Applications by Using Java Web Start.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
ZMQS ZMQS
Proud Members of the Consulting Group, LLC
Richmond House, Liverpool (1) 26 th January 2004.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Using Family Connection Online Resource for Planning & Advising.
Suite Suite 2 TPF Software – Overview Binary Editor Remote Scripts zTREX Add-Ins & Project Integration with Source Control Manager.
ABC Technology Project
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
©2013 PROS, Inc. All rights reserved. Confidential and Proprietary. PROS Connect User Community Website and Support Portal Prepared by Christine Lambden.
1 ITSS This overview deck contains two sections. Please use the links below to navigate –How to Register for ITSS Application AccessHow to Register for.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
IP Multicast Information management 2 Groep T Leuven – Information department 2/14 Agenda •Why IP Multicast ? •Multicast fundamentals •Intradomain.
VOORBLAD.
Name Convolutional codes Tomashevich Victor. Name- 2 - Introduction Convolutional codes map information to code bits sequentially by convolving a sequence.
©2007 First Wave Consulting, LLC A better way to do business. Period This is definitely NOT your father’s standard operating procedure.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
DB analyzer utility An overview 1. DB Analyzer An application used to track discrepancies and other reports in Sanchay Post Constantly updated by SDC.
Addition 1’s to 20.
25 seconds left…...
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Week 1.
20&27 May Agenda 1.Highlight the difference between system flow of e- Invoice and paper invoice – 15 minutes 2.Demonstrate the operation procedure.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
PSSA Preparation.
VPN AND REMOTE ACCESS Mohammad S. Hasan 1 VPN and Remote Access.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
Chapter 30 Induction and Inductance In this chapter we will study the following topics: -Faraday’s law of induction -Lenz’s rule -Electric field induced.
McGraw-Hill©The McGraw-Hill Companies, Inc., 2001 Chapter 16 Integrated Services Digital Network (ISDN)
WORKSHOP FOR INTERNATIONAL STUDENTS CONDUCTED BY THE INTERNATIONAL CENTER APRIL 8, 2011 APRIL 11, 2011 APRIL 15, 2011 APRIL18, 2011 MyCSN Student Information.
Traktor- og motorlære Kapitel 1 1 Kopiering forbudt.
Presentation transcript:

1 Storm Center ® Online Outage Map Tim Prince, Emergency Operations Bob Williamson, GIS Support

2 Oncors Old Web-Accessible Outage Map

3 On March 30 Oncor Introduced Storm Center ® (Storm Center is a product of iFactor Consulting which displays Oncors OMS data

4 Four Days Later…

5 Seventeen Tornados Struck Oncors Service Area

6 Doing extensive Property Damage

7 Knocking out Power to 40,000 Customers

8 Storm Centers Display during the Storms

9 Tornado in South Arlington – Hail at DFW Airport

10 Affected Devices Highlight the Outage Area

11 Media Reporting was Focused on Dallas County; Oncors Statistics Showed Tarrant was Hardest Hit

12 Zip Code Took the Worst of the Storm

13 Geographical Display of Outages by County

14 Geographical Display of Power Outages by Zip

15 Zip Visibly Stands Out as the Most Affected

16 Coming soon … Register your account via mobile device. Report outages and receive updates.

17 Distribution Oncors Operations 2 Distribution Operating Centers Generation Transmission 3095 Feeders 3.2-million Customers 2 Data Centers Transmission Grid Management 1182 Substations 738 Distribution Substations SCADA OMS/AMS OMS/IVR 2 Phone Centers + Back-ups AMS IVR

18 IT Systems Supporting Restoration Operations Weekly DMS Storm Center Website

19 Future OMS-Storm-Center Enhancements Customers report outages to Storm Center (iFactors Notifi) Storm Center submits outage ticket directly to OMS Storm Center updates customers on status (via SMS message) Outage Management System Distribution SCADA Meter Data Management Storm Center Website Geographic Information System Command Center DMS AMS Work Management System GIS

20 GIS-to-OMS Interface Weekly DMS Storm Center Website

21 GIS: Source of Record for OMSs Electrical Connectivity

22 OMS: Uses a Weekly Extract of the GIS Connectivity Model

23 New GIS will Address GIS-to-OMS Interface Issues GIS & OMS will use identical connectivity models. GIS-to-OMS updates will be real-time & two-way. GIS will disallow user errors that adversely affect OMS. Outage Management System Distribution SCADA Meter Data Management Storm Center Website Geographic Information System Command Center DMS AMS Work Management System GIS

24 But Data Quality Issues Cant Wait for the New GIS New OMS Requires New Focus on GIS Data Quality: Connectivity –Unconnected Features –Half Connected Protective Devices –Protective Devices with Duplicate Nodes –Self-Referencing Protective Devices –Voltage Changes –Closed Loop Errors Phasing –Transformer/Conductor Phase Mismatches –Inconsistent Phase Changes –Number of Phases Increase (when tracing out from the substation) New OMS Requires Process Improvements related to GIS Support Implementing tool to comprehensively measure fitness of GIS data Developing process to better track GIS/OMS data issues Updating GIS user training to focus on: –The new OMSs greater dependence on GIS data quality –Insuring GIS data is updated when field changes are made –Personal accountability for GIS data quality

25 GIS Data Quality Issues Plague Other Utilities GIS Interest Group Mitigating Data Quality Issues

26 EPRIs Goal: Quantify Benefits of Good GIS Data Reduced cost of deploying AMS network ($4.5-million) Reduced outage durations Reduced overall cost of operations –Reduced windshield time –Reduced O&M labor expenses Improved safety (due to more accurate connectivity) Improved load management (matching loads to transformers) Improved load forecasting and system planning Improved material management and forecasting Improved information exchange: –Internal (between departments and IT systems) –External (with governmental agencies and customers)

27 Information Sharing = Better Outage Management Oncor is striving for better two-way customer communication