SPS 1 and 5 during W2-3 2019 J.MEIGNAN EN-ACE-OSS 09/01/2019.

Slides:



Advertisements
Similar presentations
HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
Advertisements

1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
Your guide to ramp safety
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
Keeping us Safe Near to School. Have you seen cars parked on the zig-zag and yellow lines outside your school?
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
WEEK 1 You have 10 seconds to name…
SPS Dump relocation Radioactive Dump storage alternatives JL GRENARD EN-HE
BLIP Operations – 162 days of operation o Safety o Forklift needs a new tire o Production o Sr-82 targets out of beam as of 14 Jun o New Sr-82 targets.
X LCLS SCU NbTi Prototype Schedule Version: February 12, 2015 Update 23JUN2015 X X System complete and ready for test X System complete & tested w/Hall.

Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Repair of MCWV magnets (TT84 – M2). Works on three magnets : MCWV 693, MCWV 697, and MCWV 701 and the associated XABS Cause of the repair : XABS jam into.
SPS Personnel Protection System Renovation Project
Linac4-PSB 160 MeV connection readiness review
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
EYETS Works EN-EL [ FC excluded ]
YETS & LS2 Works EN-El on LHC / Power distribution
BE-ICS Activities during the LS2 Period (15 min)
TE-MSC activities in SPS during LS2
Injector De-cabling Project
LHC-EYETS 2016/17 Coordination meeting #18
K. Foraz on behalf of OSS members
SPS - EYETS 2016/17 Vacuum systems planning
EN-EL-FC Activity Jeremy Blanc, EN-EL-FC.
SHORT LHC-TS Coordination meeting #1
CE Status: Activities executed until 03/08 and ongoing
Layout Drawings and Mechanical Assembly Drawings
De-cabling strategy during YETS
# 56- FIRE PREVENTION (Decision Needed)
LHC-TS3 Coordination meeting #3
TE-ABT Activities for LS2
Crab Cavities Activities
EN-HE SPS works during EYETS
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
SPS activities during LS2 TE-EPC (Power Converter Group)
TE-MSC activities in SPS during YETS
East Hall under construction
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
K. Foraz on behalf of OSS members
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
CONSTRUCTION TECHNOLOGY & maintenance
Before I leave, I need to learn the rules of the road to keep me safe.
APPennino tosco emiliano
Experimental Areas – LS2 planning
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 23/01/2019.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
Bellwork Wednesday 10/12/16 Number your paper 1-6. Tell the part of speech of the underlined word in each sentence. Be prepared to explain your answers.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 06/03/2019.
EN-HE SPS during LS2 J-L GRENARD on behalf of EN-HE 23/1/2019.
WARNING WARNING WARNING WARNING WARNING WARNING WARNING WARNING
WARNING WARNING WARNING WARNING WARNING WARNING WARNING WARNING

SPS 2, 3, 4 and 6 during W D.MCFARLANE EN-ACE-OSS 26/06/2019.
SPS Planning meeting for LS2 #25 Vacuum sectors status
SPS 2, 3, 4 and 6 during W D.MCFARLANE EN-ACE-OSS 12/06/2019.
SPS Planning meeting for LS2 #26 Vacuum sectors status
Linac4 Connection Broken Line 07/08/19

Presentation transcript:

SPS 1 and 5 during W2-3 2019 J.MEIGNAN EN-ACE-OSS 09/01/2019

Activities ongoing week 2 Point 1 ABT works in BA1 Point 5: No works possible in BB5/ECA5 during the removal of the shielding 09/01/2019 J.MEIGNAN

Activities ready to start on week 3 Point 1: Dry riser installation: VIC 14/01 Warning: lift maintenance from 10a.m to 12a.m 09/01/2019 J.MEIGNAN

Activities ready to start on week 3 Point 5: Survey: start on Friday this week Beam line dismantling Can we anticipate the lockout of your equipment on Friday 11/01? 09/01/2019 J.MEIGNAN

Activities ready to start on week 4 Point 5: EN-EL works: decabling / VIC 22/01 09/01/2019 J.MEIGNAN

Reminder: rules near BA5 To avoid problems seen during other YETS/EYETS with neighbours Road to use Pedestrian roads Parking outside point 5 : forbidden 09/01/2019 J.MEIGNAN

Any questions?