Status of Bonding R1N, R1S, R3 of TEC University of Hamburg

Slides:



Advertisements
Similar presentations
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Advertisements

Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 Faulty Channel Sources (TOB) Fault Sources (excluding cable breaks and CMN)  Hybrid-0.004%
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Status Brussels GANTRY Ê Recovered from the Gantry PC crash during Pilot Run R6 4 same situation as before the Pilot Run is achieved for R6 Ë Comparison.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
Brussels Module Production Ê We have producted 57 R6 modules and 26 R5N modules 4 of which 67 grade A and 9 grade B and 7 outside specifications Ë We have.
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
Strasbourg status Ring 7 pilot run François Didierjean.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
Status Report on Bonding at Catania
Ladder Assembly All tools and jigs produced Glue dispensing works
Status Brussels GANTRY
Status Brussels GANTRY
Hybrid & Module Testing Status
UCSB Testing Status Anthony Affolder
Executive summary from Bonding WG Meeting 21 Oct 2003
Hamburg Bonding Report
Results from module testing
US Module Production Quality
Vienna Module Production
CMS Perugia Modules Production Review
Module production in Italy
US Testing Update Anthony Affolder (On behalf of the US testing group)
TEC Module Production Overview
SBS Front Tracker GEM short update on inefficient sectors
Bari production centre resp. M. de Palma
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Module Production in Brussels
CMS Perugia Gantry Status Report
Hybrid & Module Testing Status
L.Fiore Gantry Meeting during the CMS TK week
FNAL Hybrid Testing Status
Module Production in Brussels
US Module Testing Progress Report
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Hybrid & Module Testing Status
TEC module quality overview
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
US Module Testing Progress Report
Finding missing side-rhombus
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik
Presentation transcript:

Status of Bonding R1N, R1S, R3 of TEC University of Hamburg Peter Schleper CMS tracker meeting, April 2004

Bonding @ Hamburg Final version of bonding jigs (flexible step height between sensor and frame) final modules R1N R1S R3 bonded 4 4 7 tested 4 4 7 good 3 4 6 (2 damaged) In addition: first “final” R3 modules from gantry in Brussels: first “final” R1 modules from gantry in Lyon:

Modul Bonding Status Old frames, Ceramics upside/down Needs different tools Lyon modules, Ceramics o.k, Glue added by hand Bonded and tested 2 modules damaged 13 modules o.k. First modules from Brussels, o.k. at first look To be bonded

Pull tests Done on each 50th wire all recent and old Modules  Bonding process is stable In addition: Qualification tests Test bonds on PA + pull test Pull test of CERN PA bonds Modules sent to CERN

AOH TEC AOH distribution: Vienna –(CERN)-Hamburg  centres ~ 1000 AOH are in Hamburg (10% of total) few missing types in Aachen and Lyon waiting for requests by Petal integration centres

Conclusion Experience from 15 prototype modules: Bonding process fine, final version of jigs ARC tests o.k., detailed analysis needed, cut values to be tuned (Version7.1 …) Database in use  Ready for production Modules for system tests: Modules sent to Aachen  arrived and tested o.k. ! Lyon: 1 module is missing (damaged)  try to recover module without ceramics First “final” modules from gantries arrived (with ceramics): Brussels R3: 21 modules small scratches on back side, glue spot on wrong position not well fixed in transport box  to be bonded Lyon R1: 35 modules on the way Optohybrids: requests awaited from TEC centres