RAJARAMBAPU INSTITUTE OF TECHNOLOGY  Name- SHAIKH SAHIL BABASAHEB  THIRD YEAR CIVIL  ROLL NO  ISE ON -: COMPARISION OF ACTUAL SITE LAYOUT.

Slides:



Advertisements
Similar presentations
Construction Technologies. The study and application of building or assembling a structure. All people are affected in one way or another by construction.
Advertisements

Lesson 9 Design & Construction of Food Premises & Equipment
Final Project 7th semester Maria Amparo Prieto Project: Svanekøkkenet Århus Office Building.
Architecture CAD living sleeping service SPACE PLANNING
Editable PowerPoint Slides for Lecturers
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Employee Services – Space Requirements
Cairo University Faculty of Engineering Petrochemicals Engineering Plant Layout May 2010.
Luxury Homes FROM separate entry exits D L F B A Y V I E W.
Resources in Construction / Materials. Materials for Construction No construction project can proceed satisfactorily without materials. In smaller companies.
© 2009 Michigan State University licensed under CC-BY-SA, original at Facility Environment.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
1 Out of Site, Out of Mind! Mark Mallen Group Health and Safety Manager.
BE MECHANICAL ENG. 1 ST SEM GROUP :-11 ME – D DABHI DASHYANSINH.S 241 VEKARIYA TEJ.R 242 NIL PATEL.J 243 AKSHAY PATEL.A 244 PARTH PATEL 245 MOHIT VERMA.H.
Construction Health and Safety Management By Dr Simon Smith – licensed under the Creative Commons Attribution – Non- Commercial – Share Alike License.
BASICS ELEMENTS OF CIVIL ENGINNERING Prepaid by:
Election Commission of India
The Car Park Entrance F.1,F.2 & Staff : BBQ Site No.1 5 min. down hill walk Cross the road, then you’ll see the BBQ Site No.1 Repair Work Be Careful.
Green Star – Campus Group Work. Rating tool framework Management Indoor Environment Quality Energy Transport Water Materials Land Use and Ecology Emissions.
What is Production management? Production management is the process of effectively planning and regulating the operations of that part of an enterprise.
Construction Management Two 2014 Setting up Site Presenter Tony Bosnich Feb 2014.
Site Layout constructionsite.
PMP1 Taija Puolitaival Unitec 2012 Presenters Tony Bosnich Glenn Edmonds 2014.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
L04: Understand the implications of the issues and constraints on building construction Lesson Objective To be able to explain the different plant required.
Entrepreneurship CHAPTER 9 SECTION 2.  Once you have a site now you are ready to plan the layout.  Layout – floor plan or map that shows the arrangement.
Timing (minutes) Learning ObjectiveMain tasks / ProcessResources / tools 5TitleStandard Operating Procedures for Power Press Machine Slide 1 5Index 
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
CDM Construction Design and Management
OPERATIONS MANAGEMENT STRATEGY 1. PRODUCT CHOICE 2. PROCESS CHOICE 3. FACILITIES CHOICE 4. QUALITY CHOICE.
Facility Environment 1.
PRODUCTION MANAGEMENT
Portable Cabins Sean Jordan Cabins has established itself as a market leader in the production of premium quality, multi-purpose Cabins offering advanced.
Highveld Industrial Park Workshop No. 13 Information Memorandum
Desk Based Preconstruction – Planning
Temporary Works – P8 Project Practice.
Environmental Assessment
Learning aim B: Explore how sub-structures are constructed
Highveld Industrial Park Office Block – ‘’F’’ Information Memorandum
Highveld Industrial Park Workshop No. 2 Information Memorandum
Highveld Industrial Park Storage Warehouse No. 3
Highveld Industrial Park Workshop No. 16 Information Memorandum
BUILDING ECONOMICS.
Highveld Industrial Park Workshop No. 4 Information Memorandum
Highveld Industrial Park Workshop No. 21 Information Memorandum
Highveld Industrial Park Workshop No. 1 Information Memorandum
Highveld Industrial Park Storage Warehouse No. 5
Highveld Industrial Park Workshop No. 3 Information Memorandum
Highveld Industrial Park Office Block – ‘’B’’ Information Memorandum
Highveld Industrial Park Workshop No. 5 Information Memorandum
Contractor’s Post-contract Cost Management Processes
Health and safety organization on construction site
Highveld Industrial Park Workshop No. 8 Information Memorandum
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Various Fields in Civil Engineering By R.Janani
“GARMENT PRODUCTION SYSTEM”
Highveld Industrial Park Workshop No. 17 Information Memorandum
What is Facility Layout?  The layout facility is the physical location of the various departments/units of the facility within the premises of the facility.
GENERAL CONCEPTS RELATED TO BUILDING
AD16WM Workspace Management Lecturer: Daniel Wong MBA, MSc, BBus
Toledo I-280 Crane Accident
STRUCTURAL TIMBER FRAMING
Presenter Tony Bosnich Oct 2015
Facilities and Layout Planning
R.G.G.P (NARWANA) Power point presentation of Building construction
ESTIMATION Estimation is the scientific way of working out the approximate cost of an engineering project before execution of the work. It is totally different.
Toledo I-280 Crane Accident
UNIT I.
UNIT I.
Presentation transcript:

RAJARAMBAPU INSTITUTE OF TECHNOLOGY  Name- SHAIKH SAHIL BABASAHEB  THIRD YEAR CIVIL  ROLL NO  ISE ON -: COMPARISION OF ACTUAL SITE LAYOUT WITH STANDARD SITE LAYOUT  UNDER GUIDANCE OF  PROF. A. C. ATTAR

 Site layout plans are prepared by contractors as part of their mobilization activities before work on site commences  it involving the co-ordination and movement of large quantities of materials as well as high-value products, plant and people. WHAT IS SITE LAYOUT?

LOCATION OF SITE – near mankeshwar theater, islampur stand islampur CONTRACTER NAME – D SHINDE

STANDARD SITE LAYOUT-: Standard site layout means site layout arranging in a such a way that execution of construction work efficient and easy Standard site layout might include location for and size of -: 1.Zones for particular activity 2.Site office 3.Welfare facilities for labour / labour quarters 4.Off loading, storage areas,temporary storage area 5.Security cabin 6.Car parking 7.Equipment storage area 8.Waste management and recycling areas 9.Margine provided,site boundries,existing road width 10. scaffold storage

COMPARISON OF ACTUAL LAYOUT WITH STANDARD LAYOUT

STANDARD SITE LAYOUT

ACTUAL SITE LAYOUT

 Zoning of site – In standard layout there are three zones -: 1) Central zone – central zone consisting equipment,tower crane, lifting equipment 2) outer zone-: workshop,deposite, storage area 3) Inner zone – loading and unloading areas,active stores etc In actual layout - there is also three zones but there is improper arrangement of elements in zone arrangement of zones in layout 1)central zone – it consisting lifting equipment tower crane 2) outer zone – storage of sand,bricks and aggrigates 3) inner zone - storage of steel bars, fabrication facilities

 Welfare facilities for labour In standard layout – There is special provison for labour welfare facilities i.e labour quarters, drinking water, at costruction site Standard size required 4 m. x 4.5 m for labour qarters In labour quorters There should be having good ventilation In actual layout - there should be provision of labour quarter but not having standard diamensions The size of labour quarters is 3m x 3m There is no sufficient ventilation provided in labour qaurters

LABOURE QUARTES

 SITE OFFICE – IN STANDARD LAYOUT – genral requirement diamension of site office is 2.5 m. x 2.5 m. Site office located near to entrance point. It should have sufficient working space available In large project there should be seprate office provided for site supervisor or contacter and enginners In actual layout – In actual we visited the site there is provision of site office

 OFF LOADING & STORAGE AREAS – In standard layout – there should sufficient space provided for the loading unloading and storage area are provided sand, steel,agrigates, bricks standard spaces for storage - for storage of sand space provided – 40 m^2 area for storage of cement space provided – 4m x 4m for storage of steels, scaffolding units space provided – m^2 area IN actual site – there should be no proper arrangement of spaces provided for storage for sand and agrigate 3.5m x 9 m area provided for storage of cement 3 m x3m area provided for brick storage -2.5 x5.6 m area provided

 SECURITY CABIN – In standard site layout - there should be special provision of cabin for site security perpose standard diamensions of security cabin is 2 m x 2m security cabin should be located at entrance point of site having proper working space available In actual site – there should be no provision of security cabin because of overhead charges of security guard affects the economy

 EQUIPMENT STORAGE AREA- In standard site layout - there is provision for equipment storage room having sufficent working spaces available for repair or maintance of equipment various equipment required for construction work like concrete agitatator drum,drilling maching, steel cutting machine, vibratores,elevator etc In actual layout- the machinery required for execution project stored in storage room having 4m x 3m area there is few machines avcailables in this site because the contracter hire the machinery when it required for execution of project

 SCAFFOLD STORAGE – In standard site layout there are special area provided for storage of scaffold min. storage of scaffold area about m^2 In actual layout there is proper storage of timber or scaffold. There is no errection of shade or shelter for storage of scaffolding

 MARGINS – In standard site layout- the margine provided according to building bye-lows for road side margine In actual layout – there is 4m margine provided at front side

Standard layout- In actal layout – there is 10 m marigen (incluiding parking) provided at left side and 12 m margin provided both right and rear side

THANK YOU