API Subcommittee SC-6 Discussions Valves and Wellhead Equipment

Slides:



Advertisements
Similar presentations
SC6 Work Group on VR Plugs SC6 Summer Meeting June 27, 2013 Bob Barnett / Jean Brunjes.
Advertisements

SC 17A Task Force Summer Meeting Presentation June 2013.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
Subsea Standardization. Brief History SPE ATW on Subsea Standardization held Dec 2008 SPE ATW on Subsea Standardization held Dec 2008 –Form workgroup.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
API 6A VR Plug Work February 2015 Report David Zollo on behalf of Tom Lambert.
Progress Since January Meeting
API Standard 6X: Design Calculations for Pressure-Containing Equipment
API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
API 6A 21 st Edition WG Update API Subcommittee SC-6 Plenary Valves and Wellhead Equipment June 19 th 2014.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2015.
API SC6 Valves and Wellhead Equipment TG3 – Wellhead Design in Standards and TRs Kenneth Young 14 June 2012 SC6 Summer Meeting - Westminster, CO1.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
San Francisco, CA. SC8 Liaison Report
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
TG Chair: Darren Bane (BHI)
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
API SC19 HPHT Template (Proposed as SC19TR1)
API 17X Subsea Boosting January 13, 2015
TG Chair: Mark Brinsden Shell
API SC 10, Work Group 3 Update:
Updates from SC18 Summer Meeting
API 14L Specification for Lock Mandrels and Landing Nipples
Task Group API 19SS Sand Screens
TG Chair: Darrin Willauer Baker Hughes
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
API Subcommittee 17 - Specification 17D January 2016 Status
API RP 17A - Discussion Points
API 16F June 2017 Specification for Marine Drilling Riser Equipment
API SC6 Valves and Wellhead Equipment
2016 Exploration & Production Standards Conference Subcommittee 10
SC6 Work Group on VR Plugs
API 14H Task Group Status Proper Classification of Document
Specification on float equipment
SC6 Summer ’13 Meeting: WG 14H Update
API SC-16 task group for Specification 16D
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
2016 Exploration & Production Summer Standards Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Summer Standardization Conference
API 14H Task Group Status Proper Classification of Document
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
API 16 AR Specification for Drill-through Equipment Remanufacturing
2016 Exploration & Production Summer Standards Conference
Specification on float equipment
Discussion Points API RP 17A Task Group Members
API SC 10 WG15 Stage Cementing Collars
SC6 Valves and Wellhead Equipment
SUBCOMMITTEE 6 ORGANIZATION STRUCTURE
Float Equipment API Spec 10F
CSOEM Materials Advisory Resource Group
API SC6 Valves and Wellhead Equipment
Presentation transcript:

API Subcommittee SC-6 Discussions Valves and Wellhead Equipment API 6A 21st Edition TG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment

Progress Since Summer 2015 SC-6 Meeting Comment ballot w/o reorganization completed 891 comments received 405 / 45% of comments have been addressed 8 full TG meetings held / 1 meeting was held to begin work on 6AR. Decided to leverage work from 16AR. No further progress on 6AR due to comment focus Committee roster = 110 with 25 to 40 in attendance in person or by phone Raouf Naguib replaced Jill Bell for Secretary role Next Meeting – February 25th 2016 @ Aker Solutions Targeting technical change ballot by Summer 2016 meeting Start Reorganization for 2017 completion

Work Teams – Low Hanging Fruit Changes Design - Jean Brunjes / Sergio Meyberg Materials, Welding and Cladding - Sterling Lewis / Rao Ramesh Organization - Eric Wehner Qualification - Tom Lambert / Loc Hoang Quality - Mike Briggs / Bart Bartholomew Documentation - Jill Bell/Raouf Naguib Co-Chairs - Eric Wehner & David Zollo

Plan forward Complete comment ballot Issue technical changes ballot Start reorganization work / Annex Work Annex J replace by 6AR Annex H replace with TR (Tools) Annex I & O – Eliminated HPHT??? Resolve ballot comments Reorganize the entire document per Eric’s plan General Defined Equipment (Design excluded) Manufacturer designed equipment Have final document ready for ballot by June 2017