Rapid Setting Cement Based Mortars Using Nano Materials

Slides:



Advertisements
Similar presentations
1 Solids Conveying Equipment Ulrich, 2004 Apron Auger Belt Bucket elevator Continuous flow Pneumatic Vibratory.
Advertisements

January 6. January 7 January 8 January 9 January 10.
Recycled Concrete Aggregates ET 493-FALL 2013 INSTRUCTOR: CRIS KOUTSOUGERAS ADVISOR: MOHAMED ZEIDAN BY: CHASE CHARRIER AND GARRETT TREGRE.
Welcome to HLSC 1000 Introduction to Addictions Today’s Agenda: Instructor Introduction / House Rules Student Introduction Cover Outline.
Colby Mire & Jordan Licciardi Advisor: Mohamed Zeidan ET 493
Pervious Concrete Design Instructor: Cris Koutsougeras Advisor: Mohamed Zeidan By: Alex Rodney October 8, 2014.
Recycled Concrete Aggregates
Recycled Concrete Aggregates ET 493 INSTRUCTOR: CRIS KOUTSOUGERAS ADVISOR: MOHAMED ZEIDAN BY: CHASE CHARRIER AND GARRETT TREGRE.
Pervious Concrete Desgin Instructor: Cris Koutsougeras Advisor: Mohamed Zeidan By: Alex Rodney December 5, 2014 ET 493.
SunSatFriThursWedTuesMon January
Breaking News Water Erosion. Gather Your Facts You will need to summarize your team’s findings from your reading and lab so others will understand your.
Pervious Concrete Desgin Instructor: Cris Koutsougeras Advisor: Mohamed Zeidan By: Alex Rodney October 8, 2014.
1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.
23rd Conference "Rheology of Building Materials", University of Technology Regensburg, Germany, March, 12-13, 2014 Experimental investigation of the effect.
LRS Progress Report to the Profiling Working Group March 27, 2007.
Pervious Concrete Desgin Instructor: Cris Koutsougeras Advisor: Mohamed Zeidan By: Alex Rodney December 5, 2014 ET 493.
ET 493 – Senior Design Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
Introduction Old asphalt pavements Increase demand in landfill areas and landfill costs Landfill areas.
Dr. Younis M. ALSHKANE and Dr. Serwan Kh. RAFIQ
T3.1.4.A2 Preparation and refining technologies of recovered materials from the stony fraction for the manufacturing of green concretes and low-embodied.
Department of Civil and Environmental Engineering
August 10th Enrollment for new 1st and 2nd grade students.
Silica fume The transition zone is a thin layer between the bulk hydrated cement paste and the aggregate particles in concrete. This zone is the weakest.
Gantt Chart October November December Step One Step Two
GCOS IP and Update on CEOS Response
The Project – Eportfolio Build
Physics 2 – March 9, 2017 P3 Challenge – What is the sign of W, the work done by a gas during a) an expansion, and b) a compression. Today’s Objective:
DESIGN OF STEERING SYSTEM OF SELU MINI BAJA CAR
Subject: Properties of Cement Prepared by Dr. Salah Al-Dulaijan
Table 2. Physical properties of Portland cement
Design of a Commercial Shopping Center
Multistory Office Building
Grade 12 IB Parent night September 11, 2017.
Guided Discovery.
Commercial Office Building
A STUDY ON HIGH PERFORMANCE CONCRETE WITH FLY ASH AND SILICA POWDER
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
Overview of the Teacher Work Sample (TWS)
Pine cove pit time lapse drone photos
TIMELINES PHOTOS This is an example text
A STUDY ON THE COMPRESSIVE STRENGTH AND MINERALOGICAL PROPERTIES OF FLY ASH AND RED MUD BASED GEOPOLYMER MORTAR Dr. B HANUMANTHA RAO, IIT BHUBANESWAR,
Key Dates-Odd Days April 26th-Lottery April 28th-Draft & Work Day
Inaugural LGMS Derby Day 5k Trail Run & 1 mile Fun Run May 6, 2017
ZHENG Nanxiang BI Jiefu ZHANG Feilong
2017/18 Payment Calendar Due Date Cut-off Day 1st of every month
Physics 2 – April 10, 2018 Objective: Assignment: Do Now –
2300 (11PM) September 21 Blue line is meridian..
6 Weeks Tests: April 26th – 28th
Recycled Concrete Aggregates
March 27th to 31st Mrs. Camarano’s Classes
WORM TESTS We are measuring eggs – Not worms
EXHIBITION CALENDAR SPRING 2019
South Milford Pre-School Playgroup
Course Preparation Check List
ENG 1D1 Thursday May 28th, 2015.
Circle Chart Template Process Name.
The Transformation of A Small Company Into A Golden Legend
Applications now open. See Mrs Roberts or Mr Doolan for more details.
Revenue Cycle Update November 14, 2016
Students who will be missing class for performance: Lesson for Feb 7.
Module 1, Day 10 Have Out: Bellwork:
Module 1, Day 9 Have Out: Bellwork:
Graphic Design Semester 1 Final Exam
may Test 3 Review Test 3 Test 3 Activity
Boxing Station Assembly
Rapid Setting Cement Based Mortars Using Nano Materials
May is Coming !!! January 31st: Project approval (16 days from now) • Brainstorming, team formation, successful RFA February 7th: Project proposal (+7.
Rapid Setting Cement Based Mortars Using Nano Materials
2015 January February March April May June July August September
Specials Calendar Time Day 1 Day 2 Day 3 Day 4 Day 5 Day 6
Presentation transcript:

Rapid Setting Cement Based Mortars Using Nano Materials Instructor: Cris Koutsougeras Advisor: Mohamed Zeidan Blake Mchugh & Jordan Perez Feburary 23, 2018

What is Mortar?

Rapid Setting Mortar Significance Move at quicker rate Less time on the job Reduced job cost

Colloidal Silica * Nano-silica particles that have been pre-suspended in liquid * Effects on mortar: improve flowability, decrease set-time, and increase compressive strength.

Objective- Test effects of Colloidal Silica Design mortar mix. Create different samples. Test each mix. Compare results.

Mortar Design Using Electric Mixer

Without ------------------- With Different Mixes Control Mix- Basic Mortar Mix 3 MIXES- Different percentages of Cembinder 8 and Cembinder 30 Without ------------------- With

Testing our Designed Mixes Vicat Needle Test Flow Table Compression Test

Compare Results (of each mix) Compression test- 1, 7, 28 days aged. Vicat Needle & Flow Table test- day mixed Compare results of all tests to control mix.

Timeline Time Activity Assigned Person February Research, gather materials, and prepare lab equipment. Blake/Jordan   Lab 1- Mix control sample, sample 1, and sample 2- Test setting time and flowability. Compression test of control sample, sample 1, and sample 2 (1 day aged). Jordan March Complete compression test (7 day and 28 days aged) of control, sample 1, and sample 2. Results and Analysis- 1st lab. Lab 2- Mix sample 3- Test setting time and flowability.  Blake April Complete compression test of sample 2 (1 day, 7 day, and 28 days aged). Results and Analysis- 2nd lab. Blake May Compare results of the 3 samples to the control sample. Prepare for final presentation.