This document is the property of Firelec. No copy, even partial, allowed without prior writen authorization. FIRELEC Migration Solution Don't let wiring.
ES1000C/1500C Battery Replacement Procedure. 1.Pull off the front panel.
Bentley Systems, Incorporated
Arecibo Telescope Servo & Drive System Technical Meeting May 2004 VERTEX ANTENNENTECHNIK GmbH Arecibo Telescope Servo Drive System Ideas For Computer.
MXL to FireFinder XLS Total Migration Solution
ESTEC Test Centre Division Directorate of Technical and Quality Management HYDRA PLC Replacement Debriefing Meeting.
Ports, Cables and Connectors
Mgt 240 Lecture Exam Review February 1, Homework Three Due Friday 2/4 at 5pm Due Friday 2/4 at 5pm Any questions? Any questions? Posted on course.
Control Activity & Industry Services
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
1 Exercise 1 Computer Hardware. 2 Objectives for Exercise 1 When you complete this exercise, you will be able to:
7/11/01Steven Hays E/E Support Page 1 NuMI Beam line Power Supplies  The supplies in the line is detailed  Main Ring Style…………………..…1  PEI/Transrex.
WP6: Grid Authorization Service Review meeting in Berlin, March 8 th 2004 Marcin Adamski Michał Chmielewski Sergiusz Fonrobert Jarek Nabrzyski Tomasz Nowocień.
SSIS Over DTS Sagayaraj Putti (139460). 5 September What is DTS?  Data Transformation Services (DTS)  DTS is a set of objects and utilities that.
1 RWM P OWER FEED TO EACH COIL S. Ramakrishnan. 01/29/20102 RWM COILS Existing Status The Six RWM coils are grouped in pairs Each Pair is fed from one.
Chapter 9 PLC and System Maintenance
Copyright © 2007 Heathkit Company, Inc. All Rights Reserved PC Fundamentals Presentation 4 – Inside the Computer.
1 Chapter Overview Configuring and Troubleshooting the Display Configuring Power Management Configuring Operating System Settings Configuring and Troubleshooting.
Assessment Outcomes 2 and 3 Russell Taylor. Assessment Outcome 2 Set-up an operational computer system with a range of computer hardware Practical & Theoretical.
1 Chapter Overview Publishing Resources in Active Directory Service Redirecting Folders Using Group Policies Deploying Applications Using Group Policies.
00:07 Building Your Own PC Building Your Own PCBy David Palmer.
Mr C Johnston ICT Teacher BTEC IT Unit 05 - Lesson 02 Network Devices.
This document is the property of Firelec. No copy, even partial, allowed without prior writen authorization. FIRELEC Migration Solution Don't let wiring.
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
PS1500B Battery Replacement Procedure. 1.Pull off the front panel.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
Communications & Computer Networks Resource Notes - Network Hardware
/10 FIRELEC Migration Solution This document and the information therein are the property of FIRELEC and shall not be copied or communicated to a third.
“Copyright and Terms of Service Copyright © Texas Education Agency. The materials found on this website are copyrighted © and trademarked ™ as the property.
RS3-FIM series Migration Don't let wiring costs prevent you from upgrading an RS3 FIM series system to a DeltaV system This document is the property of.
A technical proposal for the consolidation of the LHCA cryogenic elec/control system for the HL-LHC era. 07/10/2017 Simon MARTIN Marco PEZZETTI Simon MARTIN.
Electric Circuits.
Moving to Configuration Manager Current Branch
Network Designs.
WHAT IS A NETWORK TYPES OF NETWORK NETWORK HARDWARE
ABT-EC EYETS Activities 2nd reports
Transfer of data in ICT systems
Fujitsu Training Documentation Hardware Installation
K TO 12 CHS MODULE FOR GRADE 9, PP
LCLS-II Cryoplant Controls Readiness to Procure
Installation Plan Checklist
FIRELEC Migration Solution
Lesson 4 Electricity Part 3.
Personal Computers and Applications
SC1R Cold Box PDR Controls
Programmable Logic Controllers (PLCs) An Overview.
FIRELEC Migration Solution
FIRELEC Migration Solution
FIRELEC Migration Solution
Body Electrical System
FIRELEC Migration Solution
Networks 1 Key Revision Points.
Communications & Computer Networks Resource Notes - Network Hardware
Schematic to Pictorial
Vertical Cryostat Kick-off metting
All About Serial.
FIRELEC Migration Solution
FIRELEC Migration Solution
1.11: Robot Controller.
Electrical components and systems
Field installable, upgradeable and scaleable
Repairing the Electrical Components
Required “Copy Properties” option in 3D Model Sketch
Presentation transcript:

FIRELEC Migration Solution Don't let wiring costs prevent you from upgrading a PROVOX™ 20-Series system to a DeltaV™ system This document is the property of FIRELEC. No copy, even partial, allowed without prior writen authorization.

PROVOX™ 20 series > DeltaV™ Using PIA (PROVOX™ Interface Adapter) FMS-PVXCL-DV-2 PROVOX™ 20 series > DeltaV™ Using PIA (PROVOX™ Interface Adapter) New DeltaV™ System I/O card to be removed I/O panel and cable to be kept The PROVOX™ Interface Adapter (PIA) allows to connect easily, an existing PROVOX™ Termination Panel to a DeltaV™ I/O card keeping : the existing I/O panel the existing associated I/O cable

FMS-PVXCL-DV-2 Hardware to be removed PROVOX™ Highway to be removed Primary PROVOX™ Highway Secondary PROVOX™ Highway SR90 or SRx Controller to be removed SR90 or SRx Controller CP6701 Power supply and Communication Cards to be removed 1 - 14 I/O cards 20 series to be removed I/O Files (CP6701) are kept I/O panels and I/O cables stay in place in the existing cabinets Process I/Os stay in place in the existing cable trays I/O Termination panel I/O Termination panel I/O Termination panel Process I/Os

Hardware to be installed FMS-PVXCL-DV-2 Hardware to be installed Secondary DeltaV™ Highway Cntrl PS I/O1 I/O2 I/O3 I/O4 I/O5 I/O6 I/O7 I/O8 Primary DeltaV™ Highway The new DeltaV™ architecture is installed The new FIRELEC I/O cables are installed between PIAs and DeltaV™ I/O cards CP6701 The I/O files are kept and used for the installation of the PIAs No active component is kept in the existing file The new PIAs are installed in the existing I/O Files (CP6701) I/O Termination panel I/O Termination panel I/O Termination panel Process I/Os

The main advantages of the PIAs for PROVOX™ migration are as follow : FMS-PVXCL-DV-2 Advantages The main advantages of the PIAs for PROVOX™ migration are as follow : Existing I/O cables are just disconnected from the PROVOX™ I/O cards and reconnected to the PIA without any change at the same place (same terminals with same labelling and same electrical features) The existing loop drawings are kept without any modification, allowing all maintenance processes and procedures to remain unchanged.