Differential Leveling

Slides:



Advertisements
Similar presentations
Leveling {Differential Leveling}
Advertisements

Earthwork Profile Leveling 1.
Applying Profiling Leveling Techniques
Maintaining Gage Datum: Levels at Gaging Stations.
How to use a Dumpy Level Example 1
Profile Leveling.
ENGINEERING SURVEYS DEFINITION Surveying has to do with the determination of location of points on or near the surface of the earth. It is the art/science.
Differential Leveling Mr. Conrado Agm 230. Leveling Operations The basic function of the tripod level is to provide the operator with a level line of.
Introduction to surveying
Indiana LICA Contractor Certification Training Workshop 2008 Basic Surveying Concepts.
Applying Differential Leveling Techniques. Next Generation Science /Common Core Standards Addressed! CCSS.ELA Literacy. RST.9 ‐ 10.2 Determine the central.
S.H.H.S Building Construction
Principles of Surveying
CHAPTER 3 LEVELING.
Profile and Differential Leveling
Differential Leveling
Differential Leveling
Booking Sheets Rise & Fall Method M.S.Martin Original, May 2004 Revised, July 2005 M.S.Martin Original, May 2004 Revised, July 2005.
Lesson Applying Profiling Leveling Techniques. Interest Approach Discuss with the students why producers sometimes put drainage ditches in their fields.
Chapter (5) Leveling Introduction:
Levelling Applications:
GUJARAT TECHNOLOGICAL UNIVERSITY BIRLA VISWAKARMA MAHAVIDHYALAYA (ENGINEERING COLLEGE) VALLABH VIDYANAGAR SUBJECT: ELEMENTS OF CIVIL ENGINEERING (CODE )
Using the Dumpy & Recording Levels
Chap 7 – Differential Leveling
Lesson Applying Differential Leveling Techniques.
1 Applications Stream cross sections Highways Canals Sewers Water mains Sidewalks Retaining walls Fences Application of Differential Leveling Introduction.
How to Navigate a Set of Field Notes….. First the Jargon… Benchmark Backsight Foresight Height of Instrument Elevation Turning Point Station.
Land Surveying Civil Engineering and Architecture
Surveying 1 / Dr. Najeh Tamim
Levelling Horizontal Line Pull of Gravity Reduced Level Height
LEVELLING Levelling The art of determining relative heights of different points on or below the surface of the earth is called LEVELLING,
Find the difference in height between the benchmark and the top of the slope Top of Slope ? Divide hill into 3 spots to make easier Otherwise too far to.
Applying Differential Leveling Techniques
Civil Engineering Department Government Engineering College Rajkot
Chapter (5) Leveling Introduction:
Surveying 1A (SVG 105) PLANE TABLE SURVEYING
DIFFERENTIAL – PROFILE LEVELING
TYPES OF LEVELS BY SUMIT M. MESHRAM.
Profile Leveling.
LEVELLING AND CONTOURING BY:- ANAND R. JIBHAKATE CIVIL ENGINEER 1 1.
C.K PITHAWALLA COLLEGE OF ENGINEERING AND TECHNOLOGY
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
Unit: Surveying Lesson: Differential Leveling
Topographic Survey Land Surveying Civil Engineering and Architecture
Engineering Surveying
Leveling Intro to Leveling.
Levelling Horizontal Line Pull of Gravity Reduced Level Height
Level Loop (or Closed Circuit)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Find: Average Slope AD [%]
Levelling Horizontal Line Pull of Gravity Reduced Level Height
Unit 5. Levelling.
Leveling.
Leveling.
Tachometry.
Leveling.
Section II Applications of Measurements
Leveling.
Leveling.
Leveling.
Surveying a Level Loop Surveying a Level Loop
Leveling.
Surveying With Construction Applications, 7th Edition
Surveying With Construction Applications, 7th Edition
LEVELING.
Stream Crossing Bootcamp
Lecture 7.
Presentation transcript:

Differential Leveling Importance of Leveling The determination of elevations is called leveling Measuring relative elevations changes is a comparatively simply process Precise and accurate control of relative elevations are critical to most construction projects

The Level A level consist of a high-powered telescope The level is attached to a spirit or bubble level that keeps the line of sight of the telescope horizontal

Level Instrument

Leveling staff Types: Self reading Solid staff Folding staff Target staff

Level Instrument-Wye level

Differential Leveling Definitions 1. Bench mark (BM) - relatively permanent point of known elevation Starting point (elevation 100.00 m) Point A Point B BS = 6.32 ft HI = 106.32 ft FS = 3.10 ft Elevation = 103.22 m FS = 3.10 ft

Differential Leveling Definitions 2. Backsight (BS) - a sight taken to the level rod held at a point of known elevation (either a BM or TP) Starting point (elevation 100.00 m) Point A Point B BS = 6.32 ft HI = 106.32 ft FS = 3.10 ft Elevation = 103.22 m

Differential Leveling Definitions 3. Height of instrument (HI) - the elevation of the line of sight of the telescope Starting point (elevation 100.00 m) Point A Point B BS = 6.32 m HI = 106.32 m FS = 3.10 m Elevation = 103.22 m

Differential Leveling Definitions 4. Foresight (FS) - a sight taken on any point to determine its elevation Starting point (elevation 100.00 ft) Point A Point B BS = 6.32 ft HI = 106.32 ft FS = 3.10 ft Elevation = 103.22 ft

Differential Leveling D. Computation of Elevations BS 12.64 BM1 1. BS + Elevation = HI Elevation 100.00 Point BS HI FS Elevation BM1 12.64 112.64 100.00

Differential Leveling Computation of Elevations BS 12.64 FS 3.11 BM1 2. HI - FS = Elevation TP1 Elevation 100.00 Point BS HI FS Elevation BM1 12.64 112.64 100.00 TP1 3.11 109.53

Differential Leveling Computation of Elevations BS 10.88 BS 12.64 FS 3.11 BM1 TP1 Elevation 100.00 Point BS HI FS Elevation BM1 12.64 112.64 100.00 TP1 10.88 120.41 3.11 109.53

Differential Leveling Computation of Elevations BS 10.88 FS 2.56 BS 12.64 FS 3.11 TP2 BM1 TP1 Elevation 100.00 Point BS HI FS Elevation BM1 12.64 112.64 100.00 TP1 10.88 120.41 3.11 109.53 TP2 2.56 117.85

Differential Leveling Computation of Elevations BS 9.72 BS 10.88 FS 2.56 BS 12.64 FS 3.11 TP2 BM1 TP1 Elevation 100.00 Point BS HI FS Elevation BM1 12.64 112.64 100.00 TP1 10.88 120.41 3.11 109.53 TP2 9.72 127.57 2.56 117.85

Differential Leveling Computation of Elevations BS 9.72 FS 3.10 BS 10.88 FS 2.56 BS 12.64 FS 3.11 BM2 TP2 BM1 TP1 Elevation 100.00 Point BS HI FS Elevation BM1 12.64 112.64 100.00 TP1 10.88 120.41 3.11 109.53 TP2 9.72 127.57 2.56 117.85 BM2 3.10 124.47

Differential Leveling Computation of Elevations BS 9.72 FS 3.10 BS 10.88 FS 2.56 BS 12.64 FS 3.11 BM2 TP2 BM1 TP1 Elevation 100.00 Point BS HI FS Elevation BM1 12.64 112.64 100.00 TP1 10.88 120.41 3.11 109.53 TP2 9.72 127.57 2.56 117.85 BM2 3.10 124.47

Differential Leveling Computation of Elevations 3. Change in elevation- summation of the backsight and the foresight then subtract Point BM1 TP1 Elevation BS HI FS 12.64 112.64 3.11 109.53 10.88 120.41 2.56 TP2 117.85 9.72 127.57 BM2 3.10 124.47 100.00 +33.24 -8.77 Change in elevation = 33.24 -8.77 =24.47

Differential Leveling The initial backsight (BS) is taken to a point of known elevation The backsight reading is added to the elevation of the known point to compute the height of the instrument (HI) The level may be moved to a temporary point called a turning point (TP) The elevation of a point is the height of the instrument (HI) minus the foresight (FS)

Differential Leveling Computation of Elevations - Group Problem Prepare a set of level notes for the survey illustrated below. What are the elevations of points TP1 and TP2? BS 1.27 FS 4.91 TP1 BM 2.33 6.17 TP2 Elevation 356.68

Differential Leveling Computation of Elevations - Group Problem BS 1.27 FS 4.91 TP1 BM 2.33 6.17 TP2 Elevation 356.68 Point BM1 TP1 Elevation BS HI FS TP2 1.27 357.95 356.68 2.33 355.37 4.91 353.04 6.17 349.20 +3.60 -11.08 -7.48