COSYSMO: Constructive Systems Engineering Cost Model

Slides:



Advertisements
Similar presentations
ISPA 4/5/04 1 Systems Engineering Sizing Via Requirements Ricardo Valerdi, USC Center for Software Engineering Viterbi School of Engineering ISPA Southern.
Advertisements

Full Day Workshop: Thursday, November 3, 2005, 8:00am – 5:00pm SAIC, Science Drive, Orlando, Florida Registration/Sign-In Begins at 7:30am Building.
COCOMO Suite Model Unification Tool Ray Madachy 23rd International Forum on COCOMO and Systems/Software Cost Modeling October 27, 2008.
COSYSMO 2.0 Workshop Summary (held Monday, March 17 th 2008) USC CSSE Annual Research Review March 18, 2008 Jared Fortune.
COSOSIMO Workshop Outbrief October 28, 2005 Jo Ann Lane University of Southern California Center for Software Engineering COCOMO Forum –
Working Group Meeting (Outbrief) Ricardo Valerdi, Indrajeet Dixit, Garry Roedler Tuesday.
March 2002 COSYSMO: COnstructive SYStems Engineering Cost MOdel Ricardo Valerdi USC Annual Research Review March 11, 2002.
University of Southern California Center for Systems and Software Engineering USC CSSE Research Overview Barry Boehm Sue Koolmanojwong Jo Ann Lane Nupul.
A study of the Causes of Requirements Volatility and its Impact on Systems Engineering Effort COSYSMO Workshop Center for Software and Systems Engineering,
University of Southern California Center for Software Engineering CSE USC COSYSMO: Constructive Systems Engineering Cost Model Barry Boehm, USC CSE Annual.
11/08/06Copyright 2006, RCI1 CONIPMO Workshop Out-brief 21 st International Forum on COCOMO and Software Cost Modeling Donald J. Reifer Reifer Consultants,
COSYSMO: Constructive Systems Engineering Cost Model Ricardo Valerdi USC CSE Workshop October 25, 2001.
COSOSIMO* Workshop 13 March 2006 Jo Ann Lane University of Southern California Center for Software Engineering CSE Annual.
University of Southern California Center for Software Engineering CSE USC ©USC-CSE 10/23/01 1 COSYSMO Portion The COCOMO II Suite of Software Cost Estimation.
26 October 2001DRAFT1 COSYSMO: Constructive Systems Engineering Cost Model USC CSC Workshop October 2001.
1 Systems Engineering Reuse Principles Jared Fortune, USC Ricardo Valerdi, MIT COSYSMO COCOMO Forum 2010 Los Angeles, CA.
Welcome and Overview: Annual Research Review 2006 Barry Boehm, USC-CSE March 15, 2006.
1 Results of Reuse Survey Jared Fortune, USC Ricardo Valerdi, MIT Gan Wang, BAE COSYSMO COCOMO Forum 2008 Los Angeles, CA.
University of Southern California Center for Systems and Software Engineering 1 November 2010 Mauricio Peña Dr. Ricardo Valerdi COSYSMO Requirements Volatility.
Welcome and Overview: COCOMO / SCM #20 Forum and Workshops Barry Boehm, USC-CSE October 25, 2005.
Constructive System of Systems Integration Cost Model (COSOSIMO) Workshop November 7, 2006 ****************** Outbrief Jo Ann Lane
COSYSMO Workshop Summary Ricardo Valerdi Tuesday March 14, 2006 Los Angeles, CA USC Center for Software Engineering Annual Research Review.
University of Southern California Center for Software Engineering CSE USC USC-CSE Annual Research Review COQUALMO Update John D. Powell March 11, 2002.
Valuing System Flexibility via Total Ownership Cost Analysis Barry Boehm, JoAnn Lane, USC Ray Madachy, NPS NDIA Systems Engineering Conference October.
System-of-Systems Cost Modeling: COSOSIMO July 2005 Workshop Results Jo Ann Lane University of Southern California Center for Software Engineering.
University of Southern California Center for Systems and Software Engineering 1 November 2010 Mauricio Peña Dr. Ricardo Valerdi CHARACTERIZING THE IMPACT.
1 Discussion on Reuse Framework Jared Fortune, USC Ricardo Valerdi, MIT COSYSMO COCOMO Forum 2008 Los Angeles, CA.
Estimating System of Systems Engineering (SoSE) Effort Jo Ann Lane, USC Symposium on Complex Systems Engineering January 11-12, 2007.
Expert COSYSMO Update Raymond Madachy USC-CSSE Annual Research Review March 17, 2009.
Costar & SystemStar Estimation Tools Dan Ligett Softstar Systems (603)
COCOMO II Database Brad Clark Center for Software Engineering Annual Research Review March 11, 2002.
April 13, 2004CS WPI1 CS 562 Advanced SW Engineering General Dynamics, Needham Tuesdays, 3 – 7 pm Instructor: Diane Kramer.
11/1/07(c) USC-CSSE1 Welcome; CSSE Status and Plans Barry Boehm USC Center for System and Software Engineering COCOMO/SysE-SwE Estimation Forum #22 November.
COSOSIMO* Workshop Outbrief 14 March 2006 Jo Ann Lane University of Southern California Center for Software Engineering CSE.
University of Southern California Center for Software Engineering CSE USC 110/26/2004©USC-CSE Welcome and Overview: COCOMO / SCM #19 Forum and Workshops.
COSYSMO Reuse Extension COSYSMO Workshop – USC CSSE Annual Research Review March 17, 2008 Ricardo ValerdiGan Wang Garry RoedlerJohn Rieff Jared Fortune.
Towards COSYSMO 2.0: Update on Reuse Jared Fortune, USC Ricardo Valerdi, MIT USC ARR 2009 Los Angeles, CA.
COSYSMO Workshop Outbrief CSSE Annual Research Review Los Angeles, CA Mon March 16 & Tues March 17, 2009 Ricardo Valerdi.
Copyright © 2001, Software Productivity Consortium NFP, Inc. SOFTWARE PRODUCTIVITY CONSORTIUM SOFTWARE PRODUCTIVITY CONSORTIUM COSYSMO Overview INCOSE.
Remotely monitor and control a DCS (Distributed Control system) system of a miniature Oil platform through a 2D representation model Presented by - Kirthy.
University of Southern California Center for Software Engineering CSE USC 10/8/00©USC-CSE1 Expediting Technology Transfer via Affiliate Programs and Focused.
October 28, 2001DRAFT1 COSYSMO: Reference System (Satellite Ground Station) Donald J. Reifer and Ricardo Valerdi University of Southern California.
ESD web seminar1 ESD Web Seminar February 23, 2007 Ricardo Valerdi, Ph.D. Unification of systems and software engineering cost models.
INCOSE CAB Briefing November 2002 COSYSMO COnstructive SYStems Engineering Cost MOdel November 1, 2002 Dr. Barry Boehm Ricardo Valerdi University of Southern.
LASPIN-INCOSE – 7/30/031 LASPIN-INCOSE Meeting Los Angeles, CA July 30, 2003 Ricardo Valerdi The Aerospace Corporation & University of Southern California.
Group Members: Ayush Newatia, Barry Foye, Billy Felton, Kevin Anderson, Shahnaz Begum and Adam Jasinski Constructive Cost Model is a technique used to.
University of Southern California Center for Systems and Software Engineering COSATMO/COSYSMO Workshop Jim Alstad, USC-CSSE Gan Wang, BAE Systems Garry.
February 2002Copyright 2002, USC1 COSYSMO: Constructive Systems Engineering Cost Model Status Briefing: GSAW 2002 February 2002.
July 2002 COSYSMO-IP COnstructive SYStems Engineering Cost Model – Information Processing PSM User’s Group Conference Keystone, Colorado July 24 & 25,
University of Southern California Center for Systems and Software Engineering COCOMO Suite Toolset Ray Madachy, NPS Winsor Brown, USC.
Harmonizing Systems and Software Estimation 23 rd International Forum on COCOMO and Systems/Software Cost Modeling and ICM Workshop USC Campus, Los Angeles,
Some Preliminary Results Ricardo Valerdi Center for Software Engineering University of Southern California Disclaimer: Please do not distribute outside.
University of Southern California Center for Systems and Software Engineering 26 th Annual COCOMO Forum 1 November 2 nd, 2011 Mauricio E. Peña Dr. Ricardo.
University of Southern California Center for Systems and Software Engineering COSYSMO 3.0: Workshop Results Annual Research Review March 17, /16.
1 Agile COCOMO II: A Tool for Software Cost Estimating by Analogy Cyrus Fakharzadeh Barry Boehm Gunjan Sharman SCEA 2002 Presentation University of Southern.
CS 577b: Software Engineering II
Status Report Jim VanGaasbeek Ricardo Valerdi
Mathematical Formulation and Validation of the Impact of Requirements Volatility on Systems Engineering Effort March 6, 2012 Mauricio E. Peña.
PSM 2008 Workshop: Toward Integrating Systems Engineering and Software Engineering Estimation: Harmonizing COSYSMO and COCOMO John Gaffney
Costing Secure Systems Workshop Report
COSYSMO: Constructive Systems Engineering Cost Model
Measurement and Estimating Models
COSYSMO Delphi Round 2 Results
Towards COSYSMO 2.0: Update on Reuse
More on Estimation In general, effort estimation is based on several parameters and the model ( E= a + b*S**c ): Personnel Environment Quality Size or.
Working Group Meeting Report
University of Southern California Center for Software Engineering
Zen in the Art of Cost Estimation
October 18, 2012 Mauricio E. Peña Ricardo Valerdi
Generalized Reuse Model for COSYSMO Workshop Outbrief
Presentation transcript:

COSYSMO: Constructive Systems Engineering Cost Model USC CSC Workshop 25-26 October 2001 26 October 2001 DRAFT

Participants Elliot Axelband, USC Kim Bell, Aerospace Joe Betser, Aerospace Barry Boehm, USC Linda Brooks, TRW Gary Hafen, LMCO Cheryl Jones, US Army Tony Jordano, SAIC Dan Ligett, Softstar Ray Kile, CSM Karen Lum, JPL Karen Owens, Aerospace Don Reifer, USC Gary Thomas, Raytheon Ariel Tonnu, US Air Force Ricardo Valerdi, USC Marilee Wheaton, TRW 26 October 2001 DRAFT

Agenda Introductions Goals of effort Review of previous work and contributions Agreement on scope and approach Proposed plan of action and milestones Assignment of responsibilities Summary and conclusions 26 October 2001 DRAFT

Goals of Effort Build a COCOMO-like model for estimating system engineering resources Member of the COCOMO family of models COSYSMO (Constructive System Engineering Model) fills in the holes not covered by COCOMO II Inception Elaboration Construction Transition 26 October 2001 DRAFT

Scope and Approach Size COSYSMO Effort Cost Drivers Duration # Requirements # Interfaces # TPM’s # Scenarios # Modes # Platforms # Algorithms Size COSYSMO Effort Cost Drivers Duration WBS guided By EIA 632 Application factors 7 factors Team factors 8 factors Calibration 26 October 2001 DRAFT

Agreements Use USC seven step model building process Keep things simple Start with Inception phase first Use EIA 632 to bound effort Focus on software intensive systems Build on previous work Shoot for having something meaningful done by mid-March 2002 Much of the work done by volunteers, so must be conservative in estimates 26 October 2001 DRAFT

Plan of Action & Milestones Task Due Date Responsible* Develop reference system 11//01/01 Reifer/Valerdi Define cost drivers 11/16/01 Wheaton/Valerdi Define size drivers 11/16/01 Hafen/Thomas Define effort scope 11/16/01 Hafen/Thomas Finalize survey instrument 11/30/01 Thomas/Valerdi Send materials out for review 12/03/01 All focal points Hold net meeting/discuss results 12/11/01 All focal points Updates done/Delphi defined 01/14/02 Reifer/Valerdi Send Delphi out 01/15/02 All focal points Complete Delphi round 02/15/02 Reifer/Valerdi Update done based on results 03/05/02 Reifer/Valerdi Present results at annual review 03/12/02 Valerdi * Axelband/Boehm involved in all activities 26 October 2001 DRAFT

Summary and Conclusions Had a productive meeting Everyone contributed Plan of action and milestones defined Looking forward to results Thanks to our group for a job well done 26 October 2001 DRAFT