Transmission Workgroup July 2012

Slides:



Advertisements
Similar presentations
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
Advertisements

Doc.: IEEE /0095r0 Submission July 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Time schedule for ex ante evaluation and Strategic Environmental Assessment (SEA) Romania-Bulgaria Cross-Border Cooperation Operational Programme
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
© 2013 OSLC Steering Committee1 Proposal to Create OSLC Affiliated Technical Committees OSLC Steering Committee Meeting: 1 PM EDT, 8 July 2013 Open Services.
Principles Governing International Statistical Activities Impact of the update of the Fundamental Principles of Official Statistics 22 nd Session of CCSA,
Interim Executive Director June  Financial Management Practices Audit Results Fiscal Year Audit Results Fiscal Year Internal.
1 Mod Review Group 126 Feb 07 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
11/29/ HPSA and MUA/P NEGOTIATED RULEMAKING REVISED DRAFT ROAD MAP HOW DO WE GET FROM HERE TO WHERE WE NEED TO BE?
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
© 2012 Adobe Systems Incorporated. All Rights Reserved. Adobe Confidential. Des Oates | Engineering Manager | Adobe Enabling ITS2 in Adobe AEM and Apache.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
Structure of Charges: Update and next steps DCMF 10 September 2008.
Industry Dialogue on xoserve Services 14 th September 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments Transmission Workgroup 3 rd May 2012.
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
Guidance on the new Pathway IT System for Candidates
Guidance on the new Pathway IT System for Mentors
EU Implementation Programme
Review of UNC Section Q “Emergencies”
Transmission Workgroup 4th October 2012
Guidance on the new Pathway IT System for Mentors
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
Global Aggregation Mod raised by ESB CS at Mods Meeting 24 ( )
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
All Wales Safeguarding Procedures Review Project
Pine cove pit time lapse drone photos
Key Dates-Odd Days April 26th-Lottery April 28th-Draft & Work Day
SEIC ByLaw Revision Project
Verizon LSOG Meeting Objective
NTS Entry Charging Review Update
Guidance on the new Pathway IT System for Mentors
Annual Review - Methodology Statements
DSC ChMC CSS update 8th August 2018
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Exit Capacity Substitution and Revision
7th July 2011 Transmission Workgroup - Elexon
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
Draft Capacity & Connection Plan
Review Art.17/12 for 2016 and onwards
PARCA Timeline.
Draft Mod: Update of default System Marginal Prices
UK Link Future Release 3: Track 1 Implementation Approach for Approval at ChMC 2nd October 2018.
Generic Revenue Driver Methodology
February 2007 Note: Source:.
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
Incremental Entry Capacity Release Methodology Statement
WATER ACTs REVIEW PROCESS PLAN
Transmission Workstream 4th December 2008
Revised Tender Timescale for DN Interruption Arrangements
UK Link Future Release 3: Track 1 Implementation Approach for Approval at ChMC 2nd October 2018.
Follow-up of the 2015 meeting Items 2 & 3 of the agenda
DSC ChMC Switching Programme Update 10th July 2019
Gas Customer Forum 28 July 2008
SACS Working Group Continual Commitment to Accreditation and Educational Improvement April 18, 2012.
2015 January February March April May June July August September
DSC CoMC Switching Programme Update 17th July 2019
Presentation transcript:

Transmission Workgroup July 2012 System Management Principles Statement: Interim Review to Append Exit Reform Transmission Workgroup July 2012

SMPS Interim Review 2012 Exit Reform full implementation from 1st October 2012 Draft SMPS to incorporate changes to reflect Exit Reform produced for 2012/13 annual review These changes were not implemented at that time. An Interim review is being completed to incorporate the impact of Exit Reform, to be live from 1st October 2012. External consultation planned to commence on 16th July and run through 10th August Plan to submit to Ofgem for approval 17th August Plan to publish final version w/c 24th September. 2nd bullet: Not implemented than as business arrangements remained pre-Exit Reform for the 6 months from April 2012 to September 2012 3rd bullet: Review primarily driven by Exit Reform, but incorporates a number of other minor issues identified in previous review as well. So this is a good time to identify any further issue.