12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
AQ Amendment: Relevant UNC obligations and additional Validations Applied 27 May 2010.
Version /08/2008 The AQ calculation and validation process Compiled and delivered from the xoserve AQ Team for Review Group 209 Susan Prosser & Steve.
AQ Overview.  Annual Quantity (AQ) is a value held for each meter point that reflects the expectation as to the volume of gas that a meter point will.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Project Nexus Workgroup Read Validation following Transfer of Ownership 13 th October
CSEPs NDM Reconciliation. Assuming opening read of zero.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
Project Nexus Workgroup Extension of Modification 0434 to permit retrospective updates pre-dating Project Nexus Go Live Date 9 th September 2014.
PN UNC Workgroup Read Validation 4 th October 2011.
PN UNC 4 th September 2012 Reconciliation Issues (Action: NEX06/02)
Version PNUNC AQ Principles Workgroup Mod 0209 – Rolling AQ Presenter: Steve Nunnington 23 rd March 2010.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
DM Elective Transfer Scenarios 29 January Principles  Incoming Shipper or Read Provider responsible for obtaining read at Start of GFD – i.e.
Rolling AQ – Initial Calculation
Supply Point Register 10th January 2012
Project Nexus Workgroup (Settlement)
PN UNC Workgroup Invoicing 4th October 2011.
Weekly Progress Update 3rd Aug 2018
Background - Tolerance Rules
Project Nexus Workgroup AQ Correction Process Timeline
Nexus Meter Read Performance April 2018
PAF Risk Register and PARR mapping
DM Elective Transfer Scenarios 26 February 2009
R&N Timeline Release 2 Release 3 Feb-19 June-19
Project Nexus Workgroup
Weekly Progress Update 13 July 2018
Change Management Committee – June 2019 Update
Project Nexus Workgroup
RAASP – Solution Options Scenario Comparison
Weekly Progress Update 15 June 2018
Project Nexus Workgroup
R&N Timeline June-19 Sept-19 (EUC) Nov-19 Minor Release D4
Industry Shipperless & Unregistered Working Group
Weekly Progress Update 11 May 2018
Project Nexus Workgroup
June 2019 Release Scope DSC Change Management Committee
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
Actions for Mod209 Workgroup
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
PN UNC AMR Topic Workgroup
PN UNC Workgroup (Settlement topic)
UK Link Replacement Programme additional supporting UNC modifications
Deferral of Retrospective Updates Functionality
PN UNC AMR Topic Workgroup
Joint Theft Reporting Review (from meeting 1st March 2019)
Project Nexus Workgroup
Gas Performance Assurance Framework February 2013
Project Nexus Workgroup
Overview of RbD Risk Modelling 31 March 2008
AQ Threshold Analysis Steve Taylor Centrica plc.
Retail & Networks ChMC Update
Development Work Group 0209 Straw Man Update
PN UNC AMR Topic Workgroup Meeting 14 – Meter Reading
Nexus Workgroup Read Validation Scenarios
Actions Updates Action 0282/006 – Exclude from AQ process
Meter Read Rejections ..
Meter Reads.
Project Nexus Workgroup
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Project Nexus Workgroup
PN UNC Workgroup (AQ topic)
Annual Quantity (AQ) 45.
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
Presentation transcript:

Project Nexus Workgroup Retro-Updates Scenario 7th February 2012 08/05/2019

Scenario: Meter Asset Exchange Either missed or incorrect Previous Shipper Current Shipper Change of Shipper Meter Exchange read read read read read read Current Shipper updates details of exchange or loads meter exchange retrospectively during previous Shipper’s ownership. (Note: No impact to previous Shippers charges) Issue: what happens to the reads/consumptions already loaded?

Scenario 1 The consumptions derived from reads & asset data following the asset update are now incorrect e.g. due to metric/imperial indicator. either Shipper identifies they are incorrect or, following update, system identifies they are possibly incorrect (based on AQ) Issues/Questions What happens to the current Shipper reads; must these be flagged as invalid for the purposes of AQ review? What happens to the previous Shipper reads; must these be flagged as invalid for the purposes of AQ review? If the reads are flagged as ‘invalid’ a new recent read must be loaded to carry out reconciliation & AQ review. Should the transfer read also be replaced? If so previous Shipper must agree to the replaced transfer read

Scenario 2 Any retro updates to information affecting consumption derived from the reads and asset data are assumed to invalidate all subsequent reads e.g. metric to imperial Issues/Questions; What happens to the current Shipper reads; must these be flagged as invalid for the purposes of AQ review? What happens to the previous Shipper reads; must these be flagged as invalid for the purposes of AQ review? If the reads are flagged as ‘invalid’ a new recent read must be loaded to carry out reconciliation & AQ review. Should the transfer read also be replaced? If so previous Shipper must agree to the replaced transfer read

Scenario 3 All consumptions derived from reads and asset data following asset update are correct because they are estimated reads or the update does not affect consumptions e.g. meter location or serial number. Issues/Questions; No need to replace reads. When a new read is loaded by current Shipper, reconciliation & AQ review carried out using existing consumptions/reads How does the Shipper determine that the consumptions are not affected?

Options: No validation on update May cause incorrect reconciliations & AQ’s (could be for upto 36 months for AQ) Re-calculate all new consumptions (from date of update or ownership?) on existing reads following asset update– reject where any fail validation. Validations applied would be ‘Market Breaker’. Re-calculate all new consumptions (from date of update or ownership?) and notify current Shipper of reads that would have failed, but load re-calculated consumptions anyway. Will require option to suspend reconciliation charge if charge fails a reconciliation tolerance (to be agreed) Current Shipper must replace reads at the same time as asset update, regardless of update. Update will fail if reads are not replaced. Previous Shipper reads?