ITER-TBM Planning and Costing Meeting

Slides:



Advertisements
Similar presentations
PARK WEST DRAIN Park Township, Ottawa County, Michigan Project Information Meeting August 4, 2011 Ottawa County Drain Commissioner.
Advertisements

Proposal / Request For Proposal Proposal / Request For Proposal Initiation Control Planning Close-down Execution.
The exhibition process The phases of an exhibition.
Spring 2009 Training End-of-Course Field Test. Schedule of Important Dates for 2009 Field Test Event Spring Field Test Window -- April 27 – May 15 EventSchedule.
PbLi Thermofluid Analysis (Session 1 – ITER TBM and blanket design and analysis) Sergey Smolentsev, Siegfried Malang, and Clement Wong FNST MEETING August.
Thermo-fluid Analysis of Helium cooling solutions for the HCCB TBM Presented By: Manmeet Narula Alice Ying, Manmeet Narula, Ryan Hunt and M. Abdou ITER.
Introduction to Software Engineering Dr. Basem Alkazemi
US ITER TBM DCLL TBM Design, Analysis and Development C. Wong, M. Dagher, S. Smolentsev and S. Malang FNS/TBM Meeting UCLA, September 19-20, 2007.
Summary of Current Test Plan for US DCLL TBM in ITER Neil Morley and the US TBM Participants INL, August
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
THERMOFLUID MHD for ITER TBM. CURRENT STATUS By UCLA Thermofluid MHD GROUP Presented by Sergey Smolentsev US ITER TBM Meeting UCLA May 10-11, 2006.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
A design for the DCLL inboard blanket S. Smolentsev, M. Abdou, M. Dagher - UCLA S. Malang – Consultant, Germany 2d EU-US DCLL Workshop University of California,
Thermofluid MHD issues for liquid breeder blankets and first walls Neil B. Morley and Sergey Smolentsev MAE Dept., UCLA APEX/TBM Meeting November 3, 2003.
WRAP Technical Support System Project Update AoH Call October 19, 2005.
Strawman R&D Tasks and R&D Costs Neil Morley and Alice Ying INL, August
DCLL R&D Task Area Reports Compiled by Neil Morley for the TBM Conference Call Oct 6, 2005.
WBS activity and Cost Summary (Focus on Design) Clement Wong TBM Conference Call Oct. 27, 2005.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
Dec 12-14, 2005TBM Planning and Costing Meeting DCLL R&D Evaluations Summary Compiled by Neil Morley for the TBM Planning and Costing Meeting Dec 12-14,
Advancement of an Enterprise Coastal GIS Kathy Fitzpatrick, P.E., Martin County, Florida Echo Gates, P.E., Florida Department of Environmental Protection.
1 VLT Research Highlights ITER Test Blanket Module (TBM) M. Abdou and the ITER-TBM Team Outline 1.Introduction and TBWG activities 2.Technical planning.
Preparing A Business Plan. Objectives By the end of this topic, you should able to understand: 1) Definition a business plan 2) the important of BP 3)Major.
MHD/Heat Transfer considerations for SiC FCI in DEMO and ITER Sergey Smolentsev DCLL Special Meeting at UCLA April 23-24, 2007.
Conference Call, June 23, 2005 Remarks on US Costing Activities for the US ITER-TBM Mohamed Abdou.
1 Subprojects of IFERC K.Lackner (as Chair of IFERC Project Committee) Garching – 14 Apr 2011.
Federal Aviation Administration SL-1 Federal Aviation Administration Safety Management Systems for Design and Manufacturing Organizations Part III Wrap.
Pacific Northwest National Laboratory U.S. Department of Energy TBM Structure, Materials and Fabrication Collaboration Issues R.J. Kurtz 1, and A.F. Rowcliffe.
TYPE OF ENERGY AUDIT Energy Audit can be classified into the following two types. i) Preliminary Audit ii) Detailed Audit The type of Energy Audit to.
ENVIRONMENTAL SITE ASSESSMENT & THE PROJECT DEVELOPMENT PROCESS.
DCLL TBM R&D Summary Compiled by Neil Morley for the TBM Conference Call Oct 27, 2005.
Pacific Northwest National Laboratory U.S. Department of Energy Initial Cost Estimates for Development of DCLL TBM Ferritic Steel Structural Components.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
US Test Blanket Module Partially Integrated Testing Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for.
Design Report – Fall Semester. Title Page List name of project and team number List date List team members, advisor, sponsor Team logos.
Status of MHD/Heat Transfer Analysis for DCLL US-ITER TBM Meeting February 14-15, 2007 Rice Room, Boelter Hall 6764, UCLA Thermofluid / MHD group Presented.
Various Strategies for DCLL in the US Technology Program Poor ITER utilization (Lowest Cost Scenario) - Support EU HCLL effort, no independent DCLL TBM.
Review of Thermofluid / MHD activities for DCLL Sergey Smolentsev & US TBM Thermofluid/MHD Group 2006 US-Japan Workshop on FUSION HIGH POWER DENSITY COMPONENTS.
UCLA - March 8, 2006 US TBM Cost Estimate Status March 8, 2006 Tom Mann.
DCLL Thermofluid/MHD R&D Sergey Smolentsev, Neil Morley and the ITER- TBM thermofluid group US ITER-TBM Meeting August 10-12, 2005 INEL.
DCLL He Thermal Hydraulics Edward Marriott UW – Madison Mo Dagher UCLA Clement Wong General Atomics Presented at the FNST Meeting August 12-14, 2008, UCLA.
LSSU Assessment Timeline Phase I (Completed by December 2009) –Create Institutional Assessment Structure –Create Department Assessment Teams –Write College.
CNGS Review 15 July 2003 M. Meddahi1 EVM for CNGS Definitions Pre-requisites Application to CNGS.
Thermal-hydraulic analysis of unit cell for solid breeder TBM
Camera PDR/CD1 Planning 19 September 2008
Project Objectives and Scope Project Work Plan
Some General Guidelines for the US TBM Costing
Introductory Remarks and Meeting Goals
DCLL TBM Reference Design
Project Management and Information Security
U.S. Presentation in TBWG-16 Beijing, China November 15 – 17, 2005
DCLL TBM Design Status, Current and future activities
DCLL TBM Safety Status Brad Merrill, Fusion Safety Program
EMIS 7307 Chapter 6.
Manufacturing Process
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
VLT Meeting, Washington DC, August 25, 2005
Facilities Planning and Design Course code:
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Remarks on US Costing Activities for the US ITER-TBM
US TBM Cost Activity Tom Mann December 12 – 14, 2005.
DCLL TBM Design Status FNST Meeting, August 12-14, 2008, UCLA
Project Management Considerations
TBM Design Meeting UCLA
Fermi Lab – 2019 CMB-S4 Workshop
Detailed Design Presentation
Compiled by Neil Morley for the TBM Conference Call Nov. 17, 2005
TITAN - Flow Control and Thermofluid Modeling Tasks
DCLL Nuclear Analysis WBS Costing Mohamed Sawan University of Wisconsin-Madison Mahmoud Youssef University of California-Los Angeles ITER TBM Meeting.
Presentation transcript:

ITER-TBM Planning and Costing Meeting WBS 1.8.1.1.3.1.4, 1.8.1.1.3.2.4, 1.8.1.1.3.3.4 Thermofluid MHD (Engineering) Sergey Smolentsev ITER-TBM Planning and Costing Meeting UCLA December 12-14, 2005

DEFINITION and SCHEDULE WBS 1.8.1.1.3.2.4 “Thermofluid MHD” (Smolentsev), Title II, 2008-2010 This WBS includes the administration and R&D necessary for the performance of analyses for the detailed design in the area of thermofluid and MHD issues. The WBS will be supported by and coupled to the necessary development of new analytical tools (WBS 1.8.1.1.2.2). WBS 1.8.1.1.3.3.4 “Thermofluid MHD” (Smolentsev), Title III, 2011-2015 This WBS will support the final review, fabrication and assembly of the TBM. Analysis support will be provided as needed during the Title III phase to support review and implementation of design changes. Final assessment and design of SiC/SiC FCI Final assessment and design of sandwich FCI Pb-17Li inlet manifold, P, and flow distribution (final analysis and design) WBS 1.8.1.1.3.1.4 “Thermofluid MHD” (Smolentsev), Title I, 2006-2007 This WBS includes the administration and R&D necessary for the performance of analyses for the preliminary design in the area of thermofluid and MHD issues. The WBS will be supported by and coupled to the necessary development of new research tools (WBS 1.8.1.1.2.2). Preliminary assessment and design of SiC/SiC FCI Preliminary assessment and design of sandwich FCI Pb-17Li inlet manifold, P, and flow distribution (preliminary analysis and design)

COST ESTIMATE TOTAL COST, 2006-2015: 1.405 M

COST PROFILE