Integrated Testing in Pilot River Basins

Slides:



Advertisements
Similar presentations
WG C Groundwater ad hoc Activity “Groundwater and Climate Change” SCG-Meeting, 10/ Johannes Grath, Balázs Horváth (EC, DGEnv) 1.
Advertisements

Implementation of the 2009 work programme of the
Pilot River Basin Network: Environment Directorate
WG B Progress report Water Directors meeting Mondorf May 20 and 21
New Work Programme and mandates 2005/2006
Project Objectives, Workplan and Timescales
WG 2.B Integrated River Basin Management
WG 2.B Integrated River Basin Management
Marine Strategy Framework Directive: implementation process at EU level Gert Verreet – WFD CIS SCG meeting of 11 March 2009.
Horizontal Guidance on Wetlands
on Identification and Designation of Heavily Modified and
Philippe Quevauviller, Johannes Grath
WFD update September 2009 Andrea NÁM
Review of Decision 2010/477/EU and MSFD Annex III
INTEGRATED TESTING OF GUIDANCE DOCUMENTS IN PILOT RIVER BASINS
JRC-Institute for Environment and Sustainability
Activity on WFD and Agriculture
Water Directors’ Meeting Common Implementation Strategy
CIS Acitivity Climate Change and Water
Pilot River Basin Outcome Report of Phase 1b.
Horizontal Guidance on Wetlands Rome, 12nd June
Outcome and Perspectives Pilot River Basin Workshop
CIS Work Programme WFD Team, DG ENV.D.2, European Commission.
Meeting of Water Directors WFD Common Implementation Strategy
Activity on environmental objectives and exemptions
NATURA 2000 and Water Framework Directive (CIS )
Update on progress since last WG meeting (13-14 June 2002)
Horizontal Guidance on Wetlands
INTEGRATED TESTING OF GUIDANCE DOCUMENTS IN PILOT RIVER BASINS
Draft Mandate and Proposed Approach for the Drafting Group on
Meeting of Water Directors Eutrophication Guidance
Meeting of Water Directors Future Work Programme of the CIS
9th meeting of the Floods Working Group
Project 2.7 Guidance on Monitoring
Marine Strategy Framework Directive: implementation process at EU level Gert Verreet – WFD WG Reporting - 31 March 2009.
WG 2.B Integrated River Basin Management
The Common Implementation Strategy – an overview
Research as a new activity of the CIS WG 2B
Meeting of Water Directors 2/3 December 2004
WG 2.B Integrated River Basin Management
WFD and Hydro-morphology
Progress CIS Activity on CC&Water 20 May 2009 Marieke van Nood, Unit D
Green Paper on Adaptation and
DG Environment, Unit D.2 Marine Environment and Water Industry
CIS Strategic Steering Group on Climate Change and Water
Implementation EU White Paper Climate Change Adaptation Specific actions DG Environment Feedback from Expert Group Climate change and water Jacques Delsalle.
Legal issues in WFD implementation WD meeting 16 June 2008 Jorge Rodríguez Romero, Unit D.2, DG Environment, European Commission.
Pilot River Basin exercise.
Pilot River Basin Water Framework Directive.
WFD and Agriculture Activity under the CIS 2005/2006 Work Programme
Water scarcity and droughts Expert Network Progress Report
Water Directors meeting Mondorf-les-bains, June 2005
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
CIS work programme Supporting the implementation of the first river basin management plans Water Directors' Meeting 30 November and 1 December.
WG E on Priority Substances
Common Implementation Strategy for the Water Framework Directive
Update WG Eflows activity and link with EcoStat
WG Integrated Testing in Pilot River Basins
Agenda item 2.1 – Overall Progress Report
Water Science-Policy Interface (CIS-SPI) Progress report
7a - Environmental Objectives and Exemptions under the Water Framework Directive SCG meeting 5 November 2008 Marieke van Nood, Unit D.2, DG Environment,
Concept paper on the assessment of WFD River Basin Management Plans
Activity on Eutrophication
Common Implementation Strategy for the
Planning to develop the CIS Work Programme
EU Water Framework Directive
Brussels – 20 April 2007 European Commission - DG Environment
SCG May 2005 CIRCA review.
WG A Ecological Status Progress report October 2010 – May 2011
History EU+Norway Water Directors meeting in Paris Oct 2000 Member States and the European Commission agreed in Paris to developed a Common Strategy.
Presentation transcript:

Integrated Testing in Pilot River Basins Progress Report to the Strategic Co-ordination Group 27-28th October 2003

Actions during the reporting period WORKPLAN FOR 2003 Actions during the reporting period Action 1: Comments/approaches on testing water bodies, and Progress Report (by 30th June 2003) Action 2: PRB Steering Group meeting (8th July 2003, Bruxelles) Action 3: Answers to the ToR (Art. 5), and Progress Report (by 30th September 2003) Action 4a: First compilation of reports (beginning of October 2003) Action 4b: 3rd Meeting of the PRB Steering Group (14th October 2003) followed by the Drafting Group meeting (15th October 2003, Bruxelles) Action 4c: Preliminary synthesis (early November 2003, before Water Director meeting and 3rd PRB Workshop) Action 5: Summary Workshop tackling 3-4 cross-cutting issues related to Art. 5 (27-28th November 2003, Belgirate) Action 6: Draft of overall report (drafting group) summarising progress and gaps

Actions 1 & 2: Comments/approaches on Water Body identification (by 30th June 2003), and progress reviewed at the 2nd PRB Steering Group meeting (8th July 2003, Bruxelles) A key message from the Water Director meeting in Athens stating that the PRB exercise is a very important aspect of the CIS boosted the process. The WDs also asked for a stronger leadership from the Commission. The response of the PRB co-ordinators has been very good, with Progress Reports and many Water Body reports delivered on time. Due to the importance of testing the horizontal guidance on water bodies, some more time for answers was left (15th September). To further support this specific testing, it was also agreed to hold a workshop on the identification of water bodies in September.

Actions 1 & 2: Comments/approaches on Water Body identification (by 30th June 2003), and progress reviewed at the 2nd PRB Steering Group meeting (8th July 2003, Bruxelles)

Thematic Workshops Objective: Bring together experts from the PRBs with those involved in drafting the guidance documents and in national projects, in order to share views and experience. Workshop on “Identification of Surface Water Bodies”, Brussels, 25-26 September 2003 Workshop on economic analyses, Paris, October 9-10 2003 Workshop on “Groundwater Characterisation”, Brussels, 13 October 2003

Action 3: Answers to the ToR (Art Action 3: Answers to the ToR (Art. 5), and Progress Report (by 30th September 2003)

Table of Content (ToC) of the Output report Action 4b: 3rd Meeting of the PRB Steering Group (14th October 2003) followed by the Drafting Group meeting (15th October 2003, Bruxelles) Creation of a Drafting Group (out of the PRB Steering Group) with the mandate of being responsible for drafting the PRB Output Report. Table of Content (ToC) of the Output report Chapter 2 will focus on the characteristics of a PRB which are important for the outcomes of the testing Chapter 3 will address the analyses of the outcomes of the testing. Annex 1 will contain the first elaboration of the answers given by the PRBs Annex 2 will gather the answers given by the PRBs to the ToR questions; it will be available only digitally (CIRCA).

Timing & deliverables For the WD meeting: ToC, drafts of Chapter 1, Chapter 2 and Annex 1 (and Annex 2 digitally) Give WDs an insight into the “elaborated basis” for the analysis in Chapter 3. First draft of Chapter 3: Available by middle November. Drafting to be started after uploading of the documents for the WDs. Discussion and review of the draft Output Report at the PRB Workshop on 27-28th November in Belgirate. Different levels of responses of the PRBs and very tight deadlines for reporting: ask for an extension to ensure quality of the outcome report

3rd PRB Workshop 27-28th November, Belgirate Objectives: Presentation and discussion of the Output Report on Art. 5 Selection of 3-4 specific issues for which further discussion is necessary from PRBs reports On-line registration at: http://ies.jrc.cec.eu.int/Meetings/

PRB WORKPLAN FOR 2004 Preliminary discussion Phase 1b: Guidance documents not included in Phase 1a (Art. 5), e.g. monitoring, HMWB, GIS, Planning process, intercalibration (originally foreseen for the first half 2004). Phase 2 will further develop integrated testing to contribute to producing Program of Measures and a River Basin Management Plan (originally starting during the second half of 2004)

The members of the Strategic Co-ordination Group are invited to: Take note of the progress made on the PRB testing exercise, Agree on the process presented for the finalisation of the report and extension of the deadline, Agree on the table of content proposed for the report, Agree on present these papers to the next Water Director meeting.