Always intervene an unsafe act

Slides:



Advertisements
Similar presentations
Always use mechanical handling aids when carrying out a heavy lift
Advertisements

Always ensure travelling block is stationary during DM changeover
No Removal of cellar frames by hands
Always use mechanical handling aids when carrying out a heavy lift
Always use 3 points of contact when using ladders
PDO Second Alert Date: Incident : LTI What happened?
Comply with Safe Operating Procedures
PDO Second Alert What happened? Ensure you are out of the danger zone
Identify Pinch Points and keep your Hands & Fingers away
Do not work at height without fall protection
PDO Second Alert Date: Incident type: LTI What happened?
Ensure to use the right tools and equipment for the activity
Ensure a working platform is adjusted and used
Follow Management of Change for an activity which is not in permit
Keep away form ‘line of fire’
Keep away from “Line of Fire”
Always use the correct tools for the job
Always use the right equipment for the task !!!!
Ensure OHL Clearance required for your lifting activity
No hands on elevator while delivering pipe
Never put your Hands in line of fire
PDO Second Alert Date: Incident title: LTI What happened?
Always ensure straight lifting
Pay attention to your footing
PDO Second Alert Date: Incident: LTI What happened?
Never place yourself in “line of fire”
Always keep your hands away from crush points (Line of Fire)
PDO Second Alert Date: Incident title: HiPo What happened?
Always use your hands to set the slips
Always assess the risks, Stop and think.
Always stay away from line of fire
PDO Second Alert What happened? Your learning from this incident..
When operating the Tongs under tension, make sure all crew keep clear
Check equipment prior to start the job
PDO Second Alert What happened? Your learning from this incident..
Confidential - Not to be shared outside of PDO/PDO contractors
Always follow defensive driving techniques
Always get authorization before starting any job!
Effective communication prevents incidents
Confidential - Not to be shared outside of PDO/PDO contractors
Always isolate equipment before beginning maintenance tasks
Check Level Setup prior Lifting & Lowering Operation
Always use fit for purpose lifting accessories
Keep clear of any rope under tension
Stay away from line of fire
Always use a banksman with reversing
PDO Second Alert What happened? Your learning from this incident..
Use a tool and protect your hands
Always ensure MOC is used when making changes to equipment setup
Always ensure protective guards are in place
Do not drive underneath overhead lines without permission.
Keep away from “Line of Fire”
Always verify isolation before starting any electrical job!
Confidential - Not to be shared outside of PDO/PDO contractors
Your safety should always be built on SOLID ground
Use clamps instead of bands to secure ESP cable on the tubing
Always be alert and operate drilling hoisting equipment at safe speed.
Maintain communication between peers
Do Not Start Any journey without proper driving training.
Always position the crane boom correctly before slinging the casing
Always check your surroundings while working in the yard.
Driving rules are for saving lives – adhere to it always
Always follow NORM protocol!
If you feel tired, STOP and take rest
Carillion Alawi LLC, Incident Type LTI No, 16/12/18
Always assess your position and be away from “Line Of Fire”
Keep away from the line of fire
Confidential - Not to be shared outside of PDO/PDO contractors
Confidential - Not to be shared outside of PDO/PDO contractors
Slow down and always drive to the conditions of the road.
Presentation transcript:

Always intervene an unsafe act PDO Second Alert Date: 13.09.2018 Incident title: LTI What happened? Cellar crew while aligning the mousehole pipe manually in the pit, one of the crew member was standing on an unstable platform (ladder used as working platform) holding the pipe which was placed on wet PCC. While aligning the pipe, it tilted and fell down near the mason who was wedging the pipe. The left leg of mason got entrapped between the pipe and cellar wall resulting in fracture to his tibia bone. Your learning from this incident.. Make sure that the crew is well aware about the procedure and a well defined procedure is in place. Use the right tools and equipment for the job. Lifting belt should not be removed from the pipe until proper support provided for the pipe. Always stand away from line of fire. Provide proper working platform for the activity. Carryout a DRR when there is a change in planned activity and address the additional hazards prior to start the work. • Conduct a TBT for workers to communicate the change in work plan and ensure controls are in place. Ensure all dates and titles are input A short description should be provided without mentioning names of contractors or individuals. You should include, what happened, to who (by job title) and what injuries this resulted in. Nothing more! Four to five bullet points highlighting the main findings from the investigation. Remember the target audience is the front line staff so this should be written in simple terms in a way that everyone can understand. The strap line should be the main point you want to get across The images should be self explanatory, what went wrong (if you create a reconstruction please ensure you do not put people at risk) and below how it should be done. Always intervene an unsafe act Pre-fabricated fixture for installing mousehole pipe

Management self audit Date: 13.09.2018 Incident title: LTI As a learning from this incident and to ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: Do you ensure you follow the procedures? Do you ensure you identify all hazards before commencing the activity? Do you ensure you are in a safe position while performing manual tasks? Do you ensure that learnings from incidents is implemented effectively and its effectiveness monitored? Do you ensure you have suitable and adequate work procedures in place for safe execution of task? Do you ensure timely revision of safe work procedures? If the answer is NO to any of the above questions please ensure you take action to correct this finding. Ensure all dates and titles are input Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask others if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Imagine you have to audit other companies to see if they could have the same issues. These questions should start with: Do you ensure…………………?