Michael Scharfenstein Project ES&H Coordinator

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Cleveland Construction Safety Initiative Introductions Purpose of a 3SP Overview of Sections of a 3SP Pat McMillen – Gilbane Building Company Dave.
Safety & Accident Prevention Measures
Contractor Safety Management
Michael Scharfenstein FAC June 17, ES&H Status of Construction and Technical System Installations Michael Scharfenstein.
Richard Hislop FAC April 20-21, 2006 CONSTRUCTION SAFETY Richard Hislop LCLS Construction Safety Coordinator.
Michael Scharfenstein FAC October LCLS Environment, Safety & Health Michael Scharfenstein ES&H Coordinator.
1 Jess Albino 1 Conventional Facilities Status FAC Review – Breakout Session CONVENTIONAL FACILITIES STATUS Jess Albino – Associate.
Mike Scharfenstein FAC Review - November 11, 2008 SLAC National Accelerator Laboratory 1 Environment Safety & Health Status.
Michael Scharfenstein FAC April 16, 2007 LCLS CONSTRUCTION SAFETY Michael Scharfenstein.
Michael Scharfenstein FAC October 30, LCLS CONSTRUCTION SAFETY Michael Scharfenstein.
Mike Scharfenstein CF Breakout - 12 November 2008 SLAC National Accelerator Laboratory 1 ES&H Status of Construction and Technical.
Safety and Health Programs
Richard Hislop FAC October Construction Safety Richard Hislop.
M. Scharfenstein - ES&H Coordinator 8 June 2009
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Safety and Health Program Section B of the Forest Activities Code.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
VPP Introduction Challenge for the Future of Safety Developed from VPP website information.
Elements of Effective Behavior Based Safety Programs
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Multiple Partnering Consortium A Case Study Greg Holthouse, Fru-Con Dwayne Wilson, Fluor A Case Study Greg Holthouse, Fru-Con Dwayne Wilson, Fluor CPI.
Safety Training for Senior Leaders October 2013
Independent Oversight Status Report on Workplace Exposure Monitoring ISM Workshop 2007.
OSHA Safety and Health Program Management Guidelines
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
1 Identification & Elimination of High Potentials Lessons Learned - Discussion.
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
Development, Validation, Implementation and Enhancement for a Voluntary Protection Programs Center of Excellence (VPP CX) Capability for the Department.

Pipeline Safety Management Systems
Safety Committee Formation
LCLS-II ES&H Requirements: Subcontractors
Multiple Partnering Consortium
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
Software and Systems Integration
Safety Accountabilities
Overview – Guide to Developing Safety Improvement Plan
Monitoring Performance
SHE Monthly Communication Deck
Overview – Guide to Developing Safety Improvement Plan
Safety Training for Managers & Supervisors
COMBINING SERVICE & SAVINGS
Roadmap to COR.
Loss Control.
Meeting of the LCLS Facilities Advisory Committee
From INPO AFI to Top Performer
Safety & Health Programs
Safety & Health Programs
CONVENTIONAL FACILITIES STATUS
M. Scharfenstein - ES&H Coordinator 14 May 2009
Department Of Energy Review LINAC Coherent Light Source Project
Ian Evans SSRL Safety Office
Elements of an Effective Safety and Health Program
Project Status Review May 13-15, 2008.
Integrated Safety and Environmental Management
Observers of the Month July 2013 Restricted.
Elements of an Effective Safety and Health Program
Trending Requirements and Results
CONVENTIONAL FACILITIES
Safety & Health Programs
Installation Status & Operational Readiness Process
Richard Hislop Construction Safety Coordinator
Risk Management NDS Forum June 23rd 2010.
PROJECT SAFETY Richard Hislop.
Presentation transcript:

Michael Scharfenstein Project ES&H Coordinator Construction Safety Michael Scharfenstein Project ES&H Coordinator

Subcontracted Work Goals GC managed Injury rate concern 120 days of field work remaining The goal is Zero future incidents CF & Technical Systems Installation Maintaining exemplary safety record Direct subcontractor management Detailed work planning As is well known our injury rate for GC managed subcontracted work is a cause of concern. The GC managed work has resulted in recordable injuries (TRCs) that have for the most part become DARTs. This is where our cause of concern lies and will be discussed in this presentation. On a positive note all CF and Technical Systems managed work has been performed w/o injury. Yes, there have been issues – but when immediately addressed positive outcome is achieved. We are working diligently to preserve this record.

Project-specific ISEMS Implementation LCLS Directorate Integrated Safety Management Plan LCLS Work Authorization Procedure LCLS Project ES&H Plan Job Safety Analysis Daily Tailgate Safety Meetings PM/UTR manages each subcontract Leads to success TCCO Project Health and Safety Plan Daily Pre-Task Planning Meeting Pre-Task Checklist Superintendents assigned geographically ISMS Plan provides overarching direction with regard to safety expectations. Work Authorization Procedure – Provides specific direction regarding work planning PO driven / similar to other Lab processes Goal is to ensure that CF1 thru CF5 incorporated into work planning LCLS Project ES&H Plan Sub produces site safety plan which we review to assure they recognize the hazards (CF1 & 2) JSA & Tailgate are further refinements of the analysis process (CF3 & 4) PM/UTRs monitor the entire process (CF4 & 5) TCCo Supposed to follow the same management model used by LCLS

PROJECT SAFETY EXPERIENCE Through April 2008 DART Rate Total Project Hours 1.8 M Hours worked SubContractors 484 K Hours worked DART Rate 3.7 (9 Incidents) TRC Rate 4.6 (2 Incidents) LCLS Collaboration 1,300 K Hours worked DART Rate 0.3 (2 Incidents) CF Managed Work MMF, Sector 20, Research Yard Demotion, Substation 522, etc, are examples of contracted work managed by CF. Their results speak for themselves. The management of these sub-contractors was not without issues, but the issues were identified and addressed by the CF UTRs in an effective manner. John Galayda set the tone early in the management of sub-contracted work by personally reviewing the UTR work planning packages and insisting on resubmissions until he was satisfied that they understood the details of the work and the level of oversight expected of the UTRs. Project UTRs and Installation managers have the implementation and enforcement of construction safety as a condition of employment. Technical Systems Installation The management of the technical systems installation, beginning with the injector and continuing to today, has been accomplished with a work planning & control process the project developed. The process relies on installation manager ownership of safety planning The process relies heavily on the ISM 5 Core Functions TCCo’s performance is causing us concern and will be addressed in this presentation. Injury rates based on 200 K hours (100 man years) of effort. DOE/SC Goal is a Reportable Case (TRC) rate of < 0.25 and a Days Away, Restricted, or Transferred (DART) rate < 0.65 per 100 FTEs.

Project Safety (Contractor/Technical Systems/Collaboration)

TCCo Incident Distribution * This chart is based on a quarterly grouping beginning in September 2006. We see the change in distribution towards increased injuries. *Initial indicators of weak management stewardship of safety captured as procedural issues are now manifested as injuries. *LCLS PMT becomes enveloped with incidents that begin to occur in April 2007: -- Ground rod -- Back Injury DART -- Concrete pumping DART *TWO Project Safety Analysis (Jan 07 & April/May 07), June BES Review and the July ORO assessments reach similar conclusions regarding the root cause of the project safety issues. Poor work planning by subs Poor work oversight by TCCo

TCCo Stewardship October ’06 thru April ’07 Ramp Up to Full Production : Procedural Violations Stand Down of Construction Activities : All Hands Meeting Review of Work Planning Process for field work – JSA process inadequate Check/correction of existing documentation PMT changes Deficiency Notices May ’07 thru November ’07 Full Production : Injuries Multi-day Stand Down of Construction Activities : Corrective Action Plan Procedural violations transition to injures Paperwork ineffectively utilized by CM/GC and trade contractors PE changes Deficiency Notices & Fines Communication with Corporate TCCo Safety Stewardship Committee Established Full time on-site medic (+30hr OSHA) UTRs added TCCo Stewardship…or how did we get here

TCCo Stewardship cont’d December ’07 thru April ’08 : Injuries continue Two serious injuries associated with one sub PM removed Work stopped 120 Days (to the end of field work) Focus on effective work planning & execution sought Plan for joint observation developed Attendance at daily morning work planning meetings JSA review with workers throughout the day Identification / monitoring of specific trades or tasks for safe work practices Must communicate with the worker The goal is Zero!

CF & Technical Systems Stewardship Excellent Safety Record 100K+ hours w/o injury S20, MMF, Injector, BC 1 & 2 Issues addressed immediately Positive Results Project Managers / UTRs / Installation Managers Direct management of subcontractors Communicate ES&H Expectations Guide them to success Enforcement when needed Thorough Work Planning and Control Aggressive ISM management Ownership of safety a condition of employment The goal is to maintain Zero! At long last lets talk about successes

Current TCCo safety performance is not acceptable Conclusion Current TCCo safety performance is not acceptable LCLS providing more prescriptive direction Maintain CF & Technical System direct managed work performance The goal is Zero!

end of presentation The project has Integrated Safety into the Management of the LCLS Project

Previous Reviews Recommendations Analyze safety data to look for indicators of future injuries Data Sources Safe Performance Observation – derivative of the a DuPont observation system TCCo DB02 Safety inspection data base 6 Week Look-Ahead Schedule Analysis of accident reports Forums to Communicate Information Weekly OAC Meeting & Weekly Safety Stewardship Meeting Bi-Weekly Subcontractor Safety Committee Meeting Provide visible Senior Management leadership in the safety program implementation to demonstrate management commitment Scheduled Senior Project Management Team Safety Walks Bi-Weekly Executive Conference Call Increase the frequency of the “All-Hands Meetings” Met with resistance – work in progress