GLAST Large Area Telescope:

Slides:



Advertisements
Similar presentations
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Advertisements

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
I&T and Operating and Support Hazards Martin Nordby Chief Mechanical Engineer LSST Camera Safety Review August 18, 2015 R1.
GLAST Large Area Telescope:
Soft Tech Development Inc. 1 Software Project Tracking A CMM Level 2 Key Process Area Soft Tech Development Inc.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
Office of Human Research Protection Georgia Health Sciences University.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMonthly Status Review – December 15, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST Large Area Telescope:
Accelerator Readiness Review October 31, 2006
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
THEMIS Mission Assurance
Mechanical Integration
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
GLAST Large Area Telescope:
Lessons Learned and Earned Value Management System Assessment
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST Large Area Telescope: I&T Test Readiness Review
GLAST Large Area Telescope
Overview Cost to Complete
DOE Review of the LCLS Project October 2006
GLAST Large Area Telescope:
DOE Review of the LCLS Project 7-9 February 2006
Presentation transcript:

GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety Assurance Manager Marsh@SLAC.Stanford.Edu 650-926-4577

4.1.A P&SA – December 2004 Significant accomplishments for January Coordinated Technical Exchange Meeting with Glenair for PDU internal harness fabrication activities. Reviewed harness requirements, work orders and implemented specific LAT QA source inspection points. ESD audits performed at SLAC (I&T Facility), Teledyne and General Technologies by LAT QA. Completed Audit Reports submitted to GSFC. Secured services of on-site source inspector for PDU and GASU assembly activities at Aeroflex. Performed capability survey’s of two potential LAT harness assembly houses. Captured all liens (three) against Tracker Tower A in SLAC LAT NCR system in order to track for closure. Provided guidance to DAQ subsystem on cPCI connector installation qualification activities.

4.1.A P&SA – December 2004 Significant accomplishments for January Supported Calorimeter Module and Tracker Tower A receiving test activities. QA support included swing shift and weekend coverage. Supported TEM/TEM-PS vibration test location change. Vibration facility (Wyle Laboratory) surveyed and qualified by LAT/GSFC QA. Test Readiness Review supported and work order approved. All vibration and thermal vacuum testing will be witnessed. Maintained weekly on-site Quality Engineering presence at Parlex Corp. for flex cable fabrication activities. Pre-cap and final inspections are performed and previously submitted corrective actions are verified for adequacy. Weekly telecons are conducted with Parlex, SLAC and GSFC personnel.

4.1.A P&SA – December 2004 Significant accomplishments for January LAT QA oversight was conducted on full-time basis at Glenair for PDU first article internal harnesses. LAT QA inspections were performed at required MIPs. Final inspection of first article harnesses being performed this week. Software Quality Engineering integrated into I&T and FSW CCB Process. Software Quality Engineering provided initial solutions to CM issues prevalent in I&T procedures. The solutions will be phased into each procedure as they are revised. Software environment/files/versions, test scripts expectations/versions, and test data archival path will be captured. Completed successful run for the record testing of ISIS for delivery to Spectrum Astro.

4.1.A P&SA – December 2004 Significant accomplishments for January Worked in concert with Tracker technical personnel to investigate pitch adaptor cracking issue. Activities included visits to Teledyne and Parlex and bending tests at SLAC. Participated in Manufacturing Review for balance of TEM/TEM-PS to be assembled at General Technologies. NCRs, drawings and procedures were reviewed to ensure all open issues were addressed prior to production.

4.1.A P&SA – December 2004 Planned accomplishments Perform Quality Survey at Aeroflex (PDU & GASU assembly house) in Colorado Springs on January 26th Support Technical Exchange Meeting at Aeroflex on January 27th. Full-time LAT QA will be on-site during assembly activities. Continue efforts to coordinate closure of SLAC LAT Nonconformance Reports. Particular focus is on Tracker flex cables, MCM’s and Tower A NCR’s. Support Technical Exchange Meeting at Cicon (LAT harness assembly house). LAT QA to maintain on-site presence during assembly activities. LAT QA to support second shift I&T activities planned to start next week.