Report of the FIG/IHO/ICA IBSC to the IHO IRCC10

Slides:



Advertisements
Similar presentations
IHB Report on IRCC-2HSSC-2. IRCC-2 Establish, coordinate and enhance cooperation in hydrographic activities amongst States on a regional basis, and between.
Advertisements

13 th Capacity Building Sub-Committee Capacity Building Development - Customized Capacity Building Programmes - East Asia Hydrographic Commission(EAHC)
VIEW OF CAPACITY BUILDING FROM RECIPIENT COUNTRY - BANGLADESH BANGLADESH NAVY HYDROGRPAHIC DEPARTMENT Monaco 08 Oct 2014.
IRCC 6 Report Chair MACHC Dec 2014 Mexico 1. Chair Report IRCC6 Report presented after consultation with the chair of the three working groups. The IRCC.
TheRrole of the UN Commission on the Limits of the Continental Shelf Continental Shelf Outer Limit Workshop, Kuala Lumpur The Role of the UN Commission.
IRCC June 2015 (Mexico City, Mexico) Report of the Capacity Buildung Sub-Committee Thomas Dehling CBSC Chair.
SEVENTH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE INTER-REGIONAL COORDINATION COMMITTEE (IRCC7) ANNUAL REPORT 2014.
Hydrography and Cartography education: New challenges, new standards Nicolas Seube, Andy Armstrong, Keith Miller FIG/IHO/ICA International Board for Standards.
Captain Marc van der Donck Chair MACHC December 2015 Hydrographic Service Agenda item 2.2 IRCC 7 report.
International Atomic Energy Agency Planning Meeting of the RCA Project on Establishing a Benchmark for Assessing the Radiological Impact of Nuclear Power.
CBSC-14 IHB Report Mustafa IPTES Director, IHO. Ratification of Protocol of Amendments on IHO Convention *47 of 48 approvals received. * Next IHC will.
IHO INTER-REGIONAL COORDINATION COMMITTEE IRCC-8 Agenda item 8 Input from HSSC-7 IHB.
9TH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
NCWG Terms of Reference NCWG April 2016, IHB, Monaco
Hydrographic Services and Standards Committee
Annika Kindeberg, Swedish Maritime Administration
Report of the Data Quality Working Group
COASTAL STATE RESPONSIBILITY (IMO) – HYDROGRAPHY
Report of the FIG/IHO/ICA IBSC to the IHO IRCC10
Standards” and by the Council key Priorities
Update on the ongoing efforts
7th EAHC TRDC-BOD MEETING
By EAHC COORDINATOR Peter You
Proposed IHO Work Programme for 2018
Update on the IHO CBSC 15 Peter YOU EAHC CB Coordinator
GUSTAVO ADOLFO GUTIÉRREZ LEONES
GUSTAVO ADOLFO GUTIÉRREZ LEONES
IRCC work is guided by the IHO Work Programme 3
Report of ABLOS to HSSC November 2017, Ottawa, Canada
REPORT AND PROPOSALS FROM IRCC Reference Doc: C2-4.2A
Meso-American - Caribbean Sea Hydrographic Commission (MACHC)
Inter-Regional Coordination Committee
DG Environment, Unit D.2 Marine Environment and Water Industry
8TH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
South West Atlantic Hydrographic Commission (SWAtHC) Report
Add Commission and date Sept 17, 2018
Hak Yoel (Peter) YOU Republic of Korea
Updates and Proposals from the HSSC
MACHC CAPACITY BUILDING COMMITTEE MEETING REPORT
IRCC 10 Outcomes Complete IRCC report available on the IHO website
EAtHC Seminar Lagos, Nigeria, October 2018 Capacity Building
Meeting international obligations
Report from the 7th Meeting of the IHO Hydrographic Services and Standards Committee (HSSC7) to NCWG April 2016, IHB, Monaco.
Hydrographic Services and Standards Committee
Adam Greenland, IBSC Chair and Keith Miller, IBSC Board Member
Operation of the Organization under IHO Convention and its supporting Basic Documents
Report on 9th TRDC-BOD Meeting
IHO Secretariat, Monaco, November
IRCC work is guided by the IHO Work Programme 3
IRCC-7 Agenda item 10 Input from HSSC-6 IHB
East Asia Hydrographic Commission (EAHC) Three Year Work Plan
Review of the 1958 Agreement
Report of ABLOS to HSSC May 2019, Cape Town, South Africa
What is Capacity Building?
Status Report of the SPRWG of the Council Future Strategic Plan
Hydrographic Services and Standards Committee
Workshop for Regional INT Charts / ENC Coordinators
EAHC Report IRCC C Japan EAHC Chair
Education & Training in Nautical Charting IIC Academy
NATHALIA MARÍA OTALORA MURILLO
South West Atlantic Hydrographic Commission (SWAtHC) Report
Status Report of the SPRWG of the Council
Report of the FIG/IHO/ICA IBSC to the IHO IRCC11
IRCC-10 Genova, Italy (3-5 June 2019)
NATHALIA MARÍA OTALORA MURILLO
Status Report of the SPRWG of the Council
MBSHC-21, Cadiz, Spain (11-13 June 2019)
11th MEETING OF THE IHO INTER-REGIONAL COORDINATING COMMITTEE
Report and Proposal from IRCC
Report and Proposal from IRCC
Presentation transcript:

Report of the FIG/IHO/ICA IBSC to the IHO IRCC10 www.iho.int/ibsc IRCC10 June 2018

10 Board members: 4 FIG, 4 IHO, 2 ICA (+IHO Secretariat) The Board 10 Board members: 4 FIG, 4 IHO, 2 ICA (+IHO Secretariat) IRCC10 June 2018

Maintain IBSC publications; The Role of the Board Review syllabi of programmes and individual recognition schemes from education and training institutions Maintain IBSC publications; Provide guidance to education and training institutions; Support the IHO for the establishment of new hydrographic programmes where regional training capacity does not exist; Review the procedures of submission. IRCC10 June 2018

Recognised Programmes Total 57 recognized programmes & 2 recognized schemes 49 Hydro (19xCatA & 30xCatB) 8 Carto (2xCatA & 6xCatA) IRCC10 June 2018

Work Program 2017-2018 The IBSC has been working on the following tasks : New standards development - IBSC to develop a new Standards framework to separate competency requirements for Cat A and Cat B (Task 3.3.9.1, IHO Work Programme for 2017) and, Review the IBSC standards and maintain IBSC Publications (Task 3.8.4, IHO 3 year Work Programme 2018-2020) IBSC41 meeting April 2018 Engagement with the SEPRHC13 meeting, from 21 to 25 August 2017, in Cartagena, Colombia and visits to both Colombian academies - Academy for Petty Officers in Barranquilla and Course for Officers (Academy in Cartagena). Article published in the IHR (November 2017) Maintaining the Standards of Competence for Hydrographic Surveyors and Nautical Cartographers: A Modern Approach IRCC10 June 2018

New Standards Framework Published Following decisions made at IRCC9 and IHO MS approval and adoption of S-8A and S-8B by CL45/17 and CL54-17 the following standards were published in 2017: Standard Ed S-5A Standards of Competence for Category "A" Hydrographic Surveyors Ed. 1.0.1, June 2017 S-5B Standards of Competence for Category "B" Hydrographic Surveyors S-8A Standards of Competence for Category "A" Nautical Cartographers Ed. 1.0.0, September 2017 S-8B Standards of Competence for Category "B" Nautical Cartographers They are accompanied by the companion document Guidelines for the Implementation of the Standards of Competence for Hydrographic Surveyors and Nautical Cartographers (Ed 2.0.0, March 2017) IRCC10 June 2018

Hosted by Institut Teknologi Bandung (ITB), Indonesia IBSC41 Meeting 16-17 April 2018 Annual meeting - 10 days Hosted by Institut Teknologi Bandung (ITB), Indonesia 16 Submissions from 10 countries (14 Hydro & 2 Carto) 3xUSA, 2xUK, 2xArgentina, 2xChina, 2xColombia, Malaysia, Peru, Portugal, Sweden & Turkey 3 submissions per day, 10 delegations, 16 presentations IRCC10 June 2018

5 new programmes submitted 14 programmes recognized IBSC41 Submissions Sixteen (16) submissions were reviewed against the new standards. Status N. Standards of Competence Recognized 3 2 x Hydro S-5B 1 x Hydro S-5A Recognized with Conditions 11 4 x Hydro S-5A 6 x Hydro S-5B 1 x Carto S-8A Not recognized 2 Total 16   5 new programmes submitted 14 programmes recognized IRCC10 June 2018

IBSC41 Stakeholder Meeting IRCC10 June 2018

Challenges: Prof. Nicolas SEUBE, Canada (IHO), past Chair 2014-2016, has resigned from the Board. CL23 Vacancy for IHO representative Managing workload Large number of submissions Recognition period 6 yrs New programmes and schemes Quality of submissions Recognized with conditions / Not Recognized Right First Time principle - all programmes are Recognized at the first review stage Stakeholder engagement & outreach Promoting the work of the IBSC and Standards Guidance and assistance to institutions IRCC10 June 2018

Affected Pubs/Standard Proposed Work Plan ANNEX B Task Work Item Priority   Milestones Start Date End Date Status Contact Person Affected Pubs/Standard Remarks 1 Review of IBSC41 Conditional Recognition submissions H Q2-Q3 2018 O Board Members Intersessional 2 Develop FAQ Right First Time companion document Q4 2018 Q1 2019 P Chair New 1 week workshop 3 Review submission process M July 2018 Invitation Letters IHO Secretariat Guidelines Right First Time 4 On-site visits to provide guidance and assistance to institutions Q3-Q4 2018 China, Colombia, Canada, Indonesia-Navy, Malaysia 5 Stakeholder engagement – workshops, presentations 2018-19 Hydro18, Shallow Survey 2018, ICC 2019 General Assembly 6 Review item 6. competency schemes L 2019 7 IBSC42 Venue and dates TBD IRCC10 June 2018

S-5A & S-8A Clarification/Amendments ANNEX C - Standard: S-5A 1.0.1 Task: review Maritime Zones, Delimitations (H8.2a) following proposal from India on the UNCLOS. H8.2a Delimitations   (B) Historical development of 1982 UNCLOS. Baselines – normal (including closing lines); straight and archipelagic Base points Low tide elevations Baselines: normal (including bay closing lines); straight and archipelagic Internal waters. Territorial seas. Contiguous zones. Exclusive Economic Zone Extended continental shelf. High seas Define the types of baselines under UNCLOS and how the territorial sea limit and other limits are projected from them, including the use of low tide elevations. Plan and specify hydrographic surveys to be utilized in the delimitation of baselines and maritime boundariesConduct and document surveys with appreciation for the type of baselines and the implication of the baselines. Describe the legal operational constraints that apply within maritime zones. IRCC10 June 2018

S-5A & S-8A Clarification/Amendments ANNEX C - Standard: S-8A 1.0.0 Task: review comments provided by Chile in CL 54/2018 on Printing on Demand and two other clarifications F2.6 Depth measurement   (I) Evolution of technology and methodologies for depth measurement Hydrographic vs. bathymetric data measurement Influence of the environmental factors on depth measurement Error sources in depth measurement. Classify different methods and systems used for depth measurement with respect to their accuracy. Assess the suitability of different depth measurement methods to achieve specific surveying and charting objectives. Examine data for depth measurement uncertainty in relation to the measurement methods employed. C1.5 Cartographic data sScales of measurement of cartographic and geographical variables Scales of measurement of cartographic and geographical variablesScales of cartographic data measurement: Nominal scale Ordinal scale Interval scale. Differentiate cartographic and geographical variablesdata according to their scale of measurement. C4.3g Mapping on demand Customized mapping from existing databases. Printing up-to-date official nautical chart from an existing catalog Identify and apply the processes required for mapping and printing on demand. IRCC10 June 2018

Note the IBSC goal of Right First Time The IRCC is invited to: Note this report; Acknowledge the work done by the Board in the delivery of the new framework for the Standards of Competence for Hydrographic Surveyors and Nautical Cartographers Approve the clarifications/minor amendments made in IHO Publications S-5A Ed 1.0.1 and S-8A Ed 1.0.0 (Annex C) Note the IBSC goal of Right First Time Agree the IBSC Proposed Work Plan – Q2 2018 to Q2 2019 (Annex B) Take any other actions as appropriate IRCC10 June 2018

Thank You www.iho.int/ibsc IRCC10 June 2018