ESS Security and Secure exchange of information Expert Group (E4SEG) Item 1 of the agenda IT security assurance DIME/ITDG SG Meeting London 15/2/20189.

Slides:



Advertisements
Similar presentations
Date: in 12 pts 28 th Meeting EQF Advisory Group Brussels 2 -3 December 2014.
Advertisements

Eurostat ESS Security and Secure exchange of information Expert Group (E4SWG) Report of the activity of the Task Force in 2015 Pascal Jacques ESTAT B0.
ESS Slide 1 Quality assessment of MEHM in SILC Eurostat Unit F5 “Health and Food Safety Statistics” 4 th meeting of the Task Force on Health Expectancies.
Agenda item 5 ESS Vision 2020: other activities DIGICOM and SIMSTAT DIME-ITDG joint plenary Luxembourg,
Eurostat Ag.no "Annex 2" supplement to Eurostat Annual Report, October 2015 Working Group on Article 64 and Article 65 of the Staff Regulations Meeting.
Gender Equality is key towards the eradication of Violence against Women.
All Roads Lead to Rome Km 923 Km 489 Km 0 Km 989 Km 518 Km 898 Km 811
TRADE CONTACT GROUP Brussels 9th June 2009 Agenda item 3a) State of play of IT systems: Import Control System (ICS); Export Control System (ECS); New.
Eurojust cases involving crimes against children
Update on the UOE 2012 data collection
5. Areas under organic farming
Working Party “Cooperation on Land Cover/Use Statistics”
Ag.no. 15 Lessons from the 2015 A65 exercise
No document Ag 08 ESA2010 (SNA 2008)
Concrete actions for improving cooperation with countries
GBV survey: progress EUROSTAT 20 March 2018.
2.1. ESS Agreement on Learning Mobility (IVET & Youth)
Education and Training Statistics Working Group, May 2011
ESS Security and Secure exchange of information Expert Group (E4SEG) nd EG Meeting Agenda Pascal Jacques ESTAT B2 Local Security Officer.
ESS Security and Secure exchange of information Expert Group (E4SEG) DIME/ITDG Item 8 ESS Security Assurance Pascal Jacques ESTAT B2 Local Security Officer.
ESS Security and Secure exchange of information Expert Group (E4SEG) DIME/ITDG SG ESS IT Security Framework Pascal Jacques ESTAT B2 Local Security Officer.
State of legal transposition (1)
Ag.no.16 A65 country manuals and country assessments
Report on WISE Art.8 and GIS issues
Habides update (May 2011).
State of play Article 5 reports
MISSOC NETWORK MEETING Amsterdam, 6-7 June 2016
Education and Training Statistics Working Group
Agenda Item 2.1 SES 2014: follow-up
ETS Working Group, 5-6th June 2012
IMPROVING THE REGIONAL DIMENSION OF EU-SILC
LAMAS October 2016 Agenda Item 2.1
Representative sampling questionnaire
Marine Strategy Framework Directive: Transposition and Implementation
Marine Strategy Framework Directive: Status of reporting
ECONOMIC BENEFITS OF GENDER EQUALITY IN THE EUROPEAN UNION
WG Environmental Accounts
Reporting – Art 17 of HD and Art 12 of BD
Item 8.1 Implementation of the 2016 Adult Education Survey
2b. Status of WFD reporting
Programme adoptions Cohesion Policy:
Ag.no. 15 Lessons from the 2016 A65 exercise
Item 7.1 – Overview of 2012 UOE data collection
ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update /09/ 2007 ETS working group.
State of play: data transmission, validation and dissemination
Proposal for granting access to HOUSEHOLD BUDGET SURVEYS (HBS)
Steering Committee, Eurostat, Luxembourg, 4 February 2011
LAMAS Working Group 7 – 8 December 2016
3.6. Impact of population and housing census results on population stocks and on LFS and SILC–follow-up DSS Meeting September 2012.
Labour market statistics- State of play
State of Play RBMPs and WISE reporting (9/07/10)
Item 4.2 – Towards the 2016 AES Philippe Lombardo Eurostat-F5
Gender Based Violence State of Play Item 5 of the draft agenda
Income distribution: flash estimates 2016 (FE) Item 3.6 of the agenda
FISIM State of play Agenda Item 3.
European Statistical Training Programme (ESTP)
Update on legal issues Strategic Coordination Group 23 February 2010
Update on legal issues Strategic Coordination Group
Item 3 Observed consistency and revisions
LAMAS October 2018 Agenda Item 4.1 LMI Review – main scenarios
Update on status of reporting and validation process
LAMAS Working Group 7-8 December 2016
IT security assurance – 2018 and beyond Item 2 of the agenda DIME/ITDG Steering Group June 2018 Pascal JACQUES ESTAT B2/LISO.
LAMAS Working Group 5-6 October 2016
LAMAS Working Group June 2015
LAMAS Working Group June 2018
Connectivity to secure networks
IT security assurance – new role of ITDG Item 3 of the agenda DIME/ITDG Steering Group June 2018 Pascal JACQUES ESTAT B2/LISO.
Project objectives and benefits
DG Environment, Unit C.2 Marine Environment and Water Industry
Presentation transcript:

ESS Security and Secure exchange of information Expert Group (E4SEG) Item 1 of the agenda IT security assurance DIME/ITDG SG Meeting London 15/2/20189 Pascal Jacques ESTAT A1 Local Informatics Security Officer

Certification process 2017-2018 Grants Workshops Next phase

Certification status 2017 2018 NL: endorsed by May'18 ESSC IT: under finalisation 2018 SI: 28-29/05/18 Endorsed Feb'19 ESSC BE (NBB): 10-11/07/18 NBB feedback under eval SE : 1-2/10/18 Endorsed Feb'19 ESSC EUROSTAT: 8-12/10/18 Endorsed Feb'19 ESSC LT: 9-10/10/18 Follow-up end March 19 EE: 30-31/10/18 Follow-up end March 19 DE: 29-30/11/18 Follow-up end June 19

Planning certification 2019 All countries confirmed planification apart UK (NSI + Customs) FR Customs ES Customs All ESS partners to be covered by end September Final report to February 2020 ESSC

2016 Grants – 1.27M€ funding country Start date end date amount duration DE 06/03/2017 05/03/2018 44,150.08 12 95% GR 01/03/2017 30/01/2018 80,957.97 10 HR 22/02/2017 21/02/2018 164,260.85 IT 23/02/2107 22/02/2018 136,266.31 LU 15/12/2016 14/12/2017 138,879.06 LV 01/11/2017 66,168.20 8 NL 01/01/2017 31/12/2017 254,396.13 PL 20/03/2017 19/03/2018 100,783.00 SI 01/04/2017 31/03/2018 129,702.48 SK 03/03/2017 02/03/2018 150,588.00

2017 Grants – 1.4M€ funding country Start date end date amount duration AT 01/09/2017 31/8/2018 60,644.96 12 95% BG 01/10/2017 30/09/2018 121,553.32 CY 21/12/2017 20/12/2018 74,053.91 DK 15/12/2017 14/12/2018 67,500.00 70% EE 01/11/2017 29,059.49 11 HR 163,191.25 HU 01/02/2018 31/01/2019 206,980.87 LT 78,532.82 LU 01/01/2018 31/12/2018 176,896.37 MT 18/12/2017 17/12/2018 126,764.02 PL 27/12/2017 26/12/2018 102,358.33 PT 20/12/2017 19/12/2018 191,272.96

2018 Grants – 1.18M€ funding country Start date end date amount duration AT 01/12/2018 30/11/2019 64,488.65 12 95% BG 01/01/2019 31/12/2019 133,657.22 FI 26/11/2018 25/11/2019 130,491.51 86.9% HR 122,238.62 HU 01/02/2019 31/01/2020 100,916.32 LU 196,604.41 MT 01/10/2018 140,765.20 15 PL 31/07/2019 66,671.56 10 RO 114,315.45 SK 30/06/2019 114,752.09 7

2019 Grants March2019 – Launch of 4th Call for proposals for mono-beneficiary grants Grants to start Q3 2019 1.2M€ funding budget

Workshops Conclusions 1st workshop on Information Classification – 5-6 October 2017 Madrid Harmonise practices in terms of data classification and controls Comparisons of the different classification schemes in the MS guidelines for data classification and lookup tables for existing classifications Conclusions Availability of comparison table between classifications schemes used in the ESS members Classification of all datasets sent by MS to ESTAT and harmonisation of protection measures

2nd workshop on security incident management and putting in place a structure for exchanging within the ESS security incidents May 2018 Barcelona Define and identify important types of incidents relevant for the microdata exchange Define exchange channels for information regarding any incident compromising the security Conclusions List of "security incidents" to be exchanged in the ESS including actions and response time Email mechanisms for rapid exchanging of information between partners

3rd workshop Impact on GDPR on the ESS exchange of microdata Spain – beginning October 2019 European Data Supervisor + some DPOs Focus on security consequences

Next Phase Launch call for tender for: Analysis of current exercise and certification results Gather opinion and feedback of some certified ESS members Propose recommendations and models for the process beyond 2019 Discuss the identified models with ESS members (ITDG, ESS IT Security Task Force) and propose options with roadmaps Deadline for completion of the analysis: end 2019 Presentation of the suggested option - post-2019 to February 2020 ESSC for endorsement

Thank You