ERS Forward Looking Measures 1, 2 & 4

Slides:



Advertisements
Similar presentations
1 Report of the Planning Coordination Committee Report to the WECC Annual Meeting April 20, 2006 Robert Jenkins, PCC Chair.
Advertisements

WECC-098 Gov Droop DT May 29, BAL Requirements R1. Each Frequency Response Sharing Group (FRSG) or Balancing Authority that is not a member.
SSG-WI System Model Data Requirements [PART 1] September 5, 2002 Las Vegas, NV.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
1 Western Wind and Solar Integration Study Site Selection Analysis 5/14/2008.
Stability analysis on WECC Systems with Wind Penetration and Composite Load Model Hyungdon Joo and Melissa Yuan Mentor Yidan Lu Professor Kevin Tomsovic.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
1 Ancillary Services Requirements for Future Ancillary Services Cost Benefit Analysis FAS/SIRS Meeting September 21, 2015.
Stability Analysis on WECC Systems with Wind Penetration and Composite Load Model Introduction The growing complexity of generation and load pattern in.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
ECE 576 – Power System Dynamics and Stability Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Biennial Transmission Plan Studies Update - DRAFT April 6, 2011.
Local Area Planning Update – TRANSAC Base Case Status Base case study models representing the base scenarios will be completed as follows for.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
System Review Work Group Update to TSS John Gross, SRWG Chair Presented to TSS May 17, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PC05 Low Hydro Study Results
PC04 High Hydro Study Results
NERC: Essential Reliability Services
Minnesota Renewable Energy Integration and Transmission
Western Electricity Coordinating Council
4/23/2018 Steering Committee Meeting 2013 Case Alt 1 & 2 - Iteration 2 – Test Transmission Solutions Alt 3 & 4 – Iteration 1 - Define Congestion.
Announcements Homework 7 is 6.46, 6.49, 6.52, 11.19, 11.21, 11.27; due date is October 30 Potential spring courses: ECE 431 and ECE 398RES (Renewable Electric.
Nick Hatton Associate Staff Engineer
WECC Load Modeling and Validation Group Meeting
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
Progress Report for the May 26th 17:31 Event
Grid Integration of Intermittent Resources
ECEN 460 Power System Operation and Control
WIND TURBINE GENERATORS.
DISTRIBUTED GENERATION (DG) MODELING CRITERIA SWEDE 2016
Western Electricity Coordinating Council
Local Area Planning Update – TRANSAC
DEC System Voltage Planning - June 2018
Western Electricity Coordinating Council
Western Electricity Coordinating Council
Base Case Build Process
Jeff King Northwest Power & Conservation Council July 28, 2010
CMPLDWG Composite Model with Distributed Generation Approval
Tyler Butikofer Associate Engineer II
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
Elena Melloni Associate Engineer
Western Electricity Coordinating Council
James Wells – PWG Chair May 25, 2018
ADS and WPR Seed Case Background
ERS Forward Looking Measures 1, 2 & 4
PCM (Production Cost Model) Data Work Group Webinar
James Wells – PWG Chair May 25, 2018
Byron Woertz, Manager—System Adequacy Planning
Western Electricity Coordinating Council
MODELING DG IN BASE CASES
2018 State of the Interconnection Overview
Tyler Butikofer Associate Engineer II
Western Electricity Coordinating Council
Base Case Build Process
WECC Planning Committee Underfrequency Load Shedding Review Group Update March 25, & 26, 2014.
MODELING DG IN BASE CASES
Scenario Development Subcommittee January 4, 2018
CMPLDWG Composite Model with Distributed Generation Approval
Western Wind and Solar Integration Study - Phase 3
Byron Woertz, Manager—System Adequacy Planning
WECC Load Modeling and Validation Group Meeting
WECC Joint Synchronized Information Subcommittee
Tyler Butikofer Associate Engineer II
PCM (Production Cost Model) Data Work Group Webinar
TONBRIDGE POWER GREEN LINE
ADS and WPR Seed Case Background
User Experience with New Solar PV Models California ISO
Jonathan Young SDWG Chair
Tyler Butikofer Associate Engineer II
PDWG Validation of the 2028 ADS PCM V1.0
Presentation transcript:

ERS Forward Looking Measures 1, 2 & 4 Elena Melloni Associate Engineer II, System Stability Planning Western Electricity Coordinating Council

ERS Forward Looking Measures 1: Synchronous Inertia Response Under Minimum SIR Conditions 2: Rate of Change of Frequency (RoCoF) 4: Interconnection Frequency Response Western Electricity Coordinating Council

Avg Dispatch (% of Cap), Weighted by Cap, Type, & Area Case Creation Target Renewable Capacity by Base Case Area 2021 Light Spring (21LSP1) Adjustments Renewable gen by BC Area based on latest PCM data EPCL to adjust wind and solar based on turbine type Redispatch gen to solve case Baseload flags DER netted with load Simulated double PV outage   Avg Dispatch (% of Cap), Weighted by Cap, Type, & Area Area WT Solar PV ALBERTA 40% ARIZONA 41% 84% B.C.HYDRO 20% EL PASO 82% IDAHO 62% 64% IMPERIALCA 97% LADWP 45% 94% MEXICO-CFE 42% 80% MONTANA 47% NEVADA 86% NEW MEXICO 46% NORTHWEST 57% 50% PACE 48% 63% PG AND E 61% 90% PSCOLORADO 37% 72% SANDIEGO 91% SIERRA 52% SOCALIF WAPA R.M. 49% WAPA U.M. Western Electricity Coordinating Council

Western Electricity Coordinating Council Results Highest Spread 230kV bus 1706.50 MW 0.1Hz 500kV bus 1750.95 MW 0.1Hz IFRO for WI: 840 MW 0.1Hz WI median: 1350 MW 0.1Hz Western Electricity Coordinating Council

SIR Case Number Case Name Total System’s Synchronous Inertia (MVA*s) Total Non-synchronous Generation Dispatched (Pgen [MW]) Total Synchronous Generation Dispatched (Pgen [MW]) Total DC Tie-Line Imports (MW)  Total System Load (MW) 1 2021 Light Spring Scenario ORIGINAL 537526 8014 88653 -56 93746 2 2021 Light Spring Scenario ADJUSTED 497671 19813 77189 Western Electricity Coordinating Council

Western Electricity Coordinating Council RoCoF Resource Contingency Criteria (RCC) for WECC: 2740 MW UFLS: 59.5 Hz RoCoF 0.5 : -0.05986 RoCoF RCC : -0.17 Western Electricity Coordinating Council

Interconnection Frequency Response Performance Ratios A:B (MW/.1Hz) Adjusted: 2874.4 Original: 3369.2 A:C (MW/.1Hz) Adjusted: 1751.0 Original: 1954.6 C:B (unitless) Adjusted: 1.6 Original: 1.7 Time to UFLS: 0.343Hz Western Electricity Coordinating Council

Looking Forward on the Forward Looking Measures WECC would like to build a case using the Base Case Compilation process More accurate & vetted data Incorporate DER in the base cases Track these measures to determine trends Western Electricity Coordinating Council