Project Name Group Members.

Slides:



Advertisements
Similar presentations
1 PERT Chart for Nekretnine Macronet [2012.] T E = 5 T E = 11 T E = 12 T E = 14 T E = 20 T E = 19 T E = 22 T E = 23.
Advertisements

Slide 1Fig. 22.1, p.669. Slide 2Fig. 22.3, p.670.
Slide 1Fig. 17.1, p.513. Slide 2Table 17.1, p.514.
World Health Statistics. Life Expectancy* The following charts are based on Disability Adjusted Life Expectancy (DALE) for which the World Health Organization.
Put your group member’s name here, click on View -> Master -> Slide Master. ECE 408/CS483, University of Illinois, Urbana-Champaign Title Member Names.
Solutions to Chapter 12 Exercises
More Realistic 16-Tap FIR Presented By Lihua, DONG Deyan, LIU.
RVP overview 19 kwietnia 2012 mgr inż. Marcin Kłosiński
Final project requirement
Multidisciplinary Engineering Senior Design Project xxxxx Project Name Preliminary Design Review mm/dd/yy Project Sponsor: Team Members: Team Mentor: Acknowledgements:
1 times table 2 times table 3 times table 4 times table 5 times table
Microsoft Office Project 2007: Managing Projects.
A-9 18 D-9 6 F-9 10 D-7 9 A-7 20 A-5 15 C-5 6 E-5 28 E-3 10 F-7 7 F-5 14 F-3 20 B-3 8 A-1 4 C-1 5 A-6 15 The Problem…
VHDL Project Specification Naser Mohammadzadeh. Schedule  due date: Tir 18 th 2.
1 Chapter 6 Project Management 1 Chapter 6 PROJECT MANAGEMENT McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.
1/8/ L20 Project Step 8 - Data Path Copyright Joanne DeGroat, ECE, OSU1 State Machine Design with an HDL A methodology that works for documenting.
Progress Reports. Schedule m m.
Departments in Business Business Name 1 Business Name 2.
ECE 545 Project 2 Specification. Schedule of Projects (1) Project 1 RTL design for FPGAs (20 points) Due date: Tuesday, November 22, midnight (firm) Checkpoints:
PERT/CPM Chart David Nandigam 1. 2 PERT/CPM Chart Task. A project has been defined to contain the following list of activities along with their required.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Statement Of Work Define static processor, DSP Profiles, memory and bus architectures. Define interconnections between DLX and DSP processors while helping.
Tables Learning Support
Characterizing Processors for Energy and Performance Management Harshit Goyal and Vishwani D. Agrawal Department of Electrical and Computer Engineering,
The reading is 7.38 mm. The reading is 7.72 mm.
State Machine Design with an HDL
L5 Computing Team Project Final Presentation Guidelines.
Animation of a planning
Final Presentation of (Field Study or OCI) Project named …
continued on next slide
Project Implementation Plan
Times Tables.
Design of an 8 Bit Barrel Shifter
                                                                                                                                                                                                                                                
continued on next slide
continued on next slide
Lessons Learned by Team ‘x’ ‘Name of team members’ Date (dd-mm-yyyy)
Course Agenda DSP Design Flow.
Top 10 Dumbest Things You Can Do in Operations Management
RTL Design Methodology
Project Deliverables ECE 545 – Introduction to VHDL.
Introduction Briefly Outline the Project. Introduction Briefly Outline the Project.
Project Name Group Members.
MCP Electronics Time resolution, costs
Project Implementation Planning
State Machine Design with an HDL
VLSI Programming 2IMN35 Lab 1 Questionnaire
Project Name Group Members.
Project Name Group Members.
Project Name Group Members.
Project Name Group Members.
Design Team Name Team Members
Project Name Group Members.
PSI Research Platform(s) of Interest
Guidelines Please do not add more slides than required by this template Presentation time 5min Rehearse!
Uncertain activity duration (P14)
RTL Design Methodology
Project Name Group Members.
Uncertain activity duration (P14)
Project Name Group Members.
[Organization], [Location], NM Goal or Aim Results Lessons Learned
(your career here) By: _______________.
3 times tables.
6 times tables.
Project Name Group Members.
continued on next slide
Project Name Group Members.
Presentation Title [NAME] AFFILIATION [ ADDRESS] [WEBSITE]
For More Details:
continued on next slide
Presentation transcript:

Project Name Group Members

Project Schedule Place a Gant chart or table of you project plan on this slide. Indicate where you had to adjust your planning for 65 nm

Requirements/Specification List what you have implemented so far briefly

Architecture Show a high level architecure (no details please), what has changed since last presentation

Verification Describe briefly how the design was simulated Which data did you use and why?

Synthesis Results Area (mm2!!!) Time slack Highest possible clock frequency Bottleneck (critical path)

Issues with switching to 65nm