Emergency Planning at ACF-Paris
FUNCTION 6 – CONTINGENCY PLAN, PREPAREDNESS AND CAPACITY BUILDING
Felix Omunu Disaster Risk Reduction Officer, Oxfam GB
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session describes the benefits of developing a strategic.
Contingency Planning and Emergency Preparedness Process and Practice PCWG Protection Cluster Coordination Training 2008.
Inter-Agency Contingency Planning: Concepts & Process
FUNCTION 2 – ‘INFORMING STRATEGIC DECISION-MAKING’: Needs assessment and response gap analysis across sectors and within the sector MODULE 2 – S1.
1. IASC Operational Guidance on Coordinated Assessments (session 05) Information in Disasters Workshop Tanoa Plaza Hotel, Suva, Fiji June
Coordination and Net Working on DRR Rapid Emergency Assessment and Coordination Team (REACT) Bishkek November, 2009.
Project design & Planning The Logical Framework Approach An Over View Icelandic International Development Agency (ICEIDA) Iceland United Nations University.
Toolkit for Mainstreaming HIV and AIDS in the Education Sector Guidelines for Development Cooperation Agencies.
1 Pacific Logistics Cluster. 2 What is Logistics ? Several Definitions… Getting the right thing at the right time in the right place at the right cost…
Assessing The Development Needs of the Statistical System NSDS Workshop, Trinidad and Tobago, July 27-29, 2009 Presented by Barbados.
McRAM Pakistan A Lesson in Assessment Preparedness.
Draft Zero Terms of Reference FSC (Humanitarian) Technical Team FSC Meeting Dhaka 18 April 2012.
Concern Worldwide’s Approach to Disaster Risk Reduction.
IASC Task Force on Meeting Humanitarian Challenges in Urban Areas (MHCUA) Draft Strategic Framework TF meeting GVA Roger Zetter.
S3.1 session day 3 1 training delivered by Oxfam GB, RedR India and Humanitarian Benchmark; January 2012, Yangon, Myanmar approved by the Advisory.
Common Needs Assessments Context: Sudden onset humanitarian emergencies: Can and should logistics play a stronger role in rapid assessments?
Assessments ASSESSMENTS. Assessments The Rationale and Purpose for Assessments.
THINK DIFFERENT. THINK SUCCESS.
The GFF in Fragile States and Humanitarian Settings
Pre-planning Planning to plan (and adapt) Implementation starts Here!
An Overview on Risk Management
Part 2: Risk Analysis and Scenario-Based Planning
Disaster and Emergency Planning
Gender, Diversity and Climate Change
5 steps to align your talent strategy to the organisational strategy
CMS Policy & Procedures
Supporting Local Shelter Coordination Indonesia and ASEAN
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
MODULE 2 – SESSION 2 SCENARIO DEVELOPMENT
5 OCTOBER 2015 MANILA, PHILIPPINES
Europe’s Environment Assessment of Assessments EE-AoA 2011
The Logical Framework Approach
Part 1: The Preparedness Package for Refugee Emergencies (PPRE)
Our Understanding of Institution/Capacity Building
LEARNING REPORT 2016 Disasters and Emergencies Preparedness Programme
Project Management Lifecycle Phases
Better Dialogue, Better Information, Better Action
Health Risk Assessment (HRA): Workshop Guide
REACH Mission & Objectives
THE BUSINESS ANALYSIS PROCESS MODEL
The Two Most Common Types of Contemporary Planning Techniques
Decision Framework for Prioritization of Anemia Action
OCHA’s Role in Preparedness
Conduction of a simulation considering cascading effects
Humanitarian Response Review (HRR) & IASC Emergency Shelter Working Group Process Graham Saunders, CRS, on behalf of Sphere/ICVA/SCHR/InterAction.
Partnerships and networks
Humanitarian Assistance
Continuity Guidance Circular Webinar
Humanitarian Architecture in Bangladesh
Accountability Issues in Proposal Writing
GNC Global Partners Meeting Washington 30/03/16
“ Cash preparedness in Asia Pacific”
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.4 Protecting citizens from environmental hazards European.
Nutrition Cluster Advocacy
Key components of an NSDS
Developing a shelter strategy
The Two Most Common Types of Contemporary Planning Techniques
Lessons Learned WG Update GLM, Washington May 2018 v.
FrAmework for Multi-agency Environments
Common reasons for partial use of DTM data
Sepsis Program Development
© Fresh Thoughts Consulting
Presentation transcript:

Emergency Planning at ACF-Paris

Amuse-bouche Ask yourself the following questions: What could be emergency planning ? Why would ACF need to do it ?

Amuse-bouche If you lack inspiration to answer the previous questions, here are more questions: If another flood would occur tomorrow in your country... What would be the impact on the people affected? What actions would be required to meet humanitarian needs? How would organisations work together? What resources would be required? What could ACF do to be better prepared next time?

Amuse-bouche Answers: What could be emergency planning ? Emergency planning is asking yourself before any disaster occurs: What kind of disaster could happen? What would be the impact on the people affected? What actions would be required to meet humanitarian needs? How would agencies work together? What resources would be required? What could organisations do to be better prepared to disasters?, etc.  Why would ACF need to do it ? Emergency planning enables to plan what could happen if a disaster occured and how ACF would respond to it. When disaster finally occurs, the response is already prepared and ACF can better meet humanitarian needs.

1. What is emergency planning? Emergency planning involves identifying, strengthening and organising resources and capacities so as to reach a level of preparedness for timely and effective response to a potential disaster. This includes: Determining roles and responsibilities; Developing policies and procedures; Identifying and developing generic tools for response (e.g. the use of National Disaster Response Teams (NDRT), information management, etc.). IFRC Disaster Response and Contingency Planning Guide

Emergency planning levels Five existing level of Emergency planning (EP) Global EP Organisation EP Inter agencies EP National/Regional EP Community EP Common emergencies: Hurricanes/cyclones Famine Floods Economic collapse Earthquakes Internal conflict/War Droughts Displacement/forced migration Crop failure Border closures Volcanic eruptions Food aid pipeline breaks Tsunamis Peace Landslides Prepositioning Epidemics Logistical bottlenecks 6

1. What is emergency planning? EMERGENCY PLANNING IS NOT CONTINGENCY PLANNING Emergency planning is preliminary in nature, based on educated assumptions of risks and hazards, and does not address specific disaster scenarios – as is the case for contingency plans. Once a disaster occurs, plans must then be monitored, evaluated and adapted to the specific situation. Contingency planning focuses on specific disaster events with a high risk of occurrence and linked to high levels of vulnerability; they identify in detail the potential humanitarian needs, actions, resources, constraints and gaps.  Although both emergency and contingency plans include similar steps, the perspectives from which they are written and the level of detail required are different. IFRC Disaster Response and Contingency Planning Guide

2. Why emergency planning? The fundamental reason for emergency planning is to improve the efficiency of a humanitarian emergency response. Emergency planning helps humanitarian actors to plan while there is time. Experience demonstrates that emergency planning can enhance the effectiveness, appropriateness and timeliness of response to emergencies. We all have a general sense of planning. Before we look more specifically at planning let’s see if we understand why we plan. QUESTION: What are the ultimate (external) benefits of planning? WRITE ANSWERS ON NEWSPRINT. BE PREPARED TO SEPARATE EXTERNAL AND INTERAL BENEFITS. “Good list. To provide us more common background, let’s look at some definitions of disaster.”

2. Why emergency planning? There are many good reasons why NGO’s should do emergency planning: Deal with anticipated problems before the onset of a crisis Put in place measures that enhance preparedness Time Enhance the quality of humanitarian response! Establish relationships with partners Develop shared understanding of common challenges Clarify roles and responsibilities Strengthen coordination mechanisms Relationships Facilitator’s option: Ask the audience to cite some of the benefits of contingency planning. If you can do it without slowing things down, capture them on a flip chart so you can reference their thoughts later in the session. The benefits should fall into one of 3 categories: Time, Relationships, Effectiveness. (Efficiency may come up which could be captured in those 3 categories). Examples of the benefits are provided with each category. The audience may have already cited some of these. If there are benefits they cited which are not on here, you may want to acknowledge them and indicate which category they contribute to. Concluding message: These benefits are just part of the picture. The overarching benefit is to enhance the quality of the humanitarian response. It is important to always keep this goal in mind when you are engaged in a contingency planning process. Identify constraints to effective response actions Focus on operational issues Effectiveness 9 9

3. How to do emergency planning? Preparedness Elaboration of the plan Disaster Implementation of the plan

Emergency planning steps Emergency planning is a tool to anticipate and solve problems that typically arise during humanitarian response: Analyse potential emergencies Analyse potential impact Establish clear response strategies Implement preparedness actions Example: Due to unusual weather patterns, Country X is at risk of large scale flooding this year. Up to 250 000 people would be displaced from their homes and 55% of domestic crop production would be wiped out. Temporary settlement site identification and design Protecting the most fertile crop lands - Determine communication channel during emergency - Design of a contingency stock - Disaster preparedness activities (if funds available) 11 11

3. How to do emergency planning? is A DOCUMENT and A PROCESS Plan vs. Planning “Fill in the blank templates defeat the socialization, mutual learning and role acceptance that are so important to achieving effective planning and a successful response.” Federal Emergency Management Agency

4. Who is involved in emergency planning? Emergency planning is a question of teamwork: Emergency planning is most effective when it is a participatory process that includes all those who will be required to work together in the event an emergency. Need for inputs and support from a variety of people in different positions: governance, senior managers, sectoral technicians, volunteers, administrative personnel, logisticians, etc. Need for coordination with external actors. IFRC Disaster Response and Contingency Planning Guide

5. How long will it require? Draft schedule of the emergency planning process and expected outputs from the staff: Duration Stages of the process Expected involvement of the mission Phase 1 3 weeks Part 1 : Background and Context Analysis Part 2 : Analysing Risks - To provide data - To be interviewed by the facilitator - To validate the gathered information Phase 2 1 month Part 3 : Assessing Needs Part 4 : Designing Response - To participate to 2 to 4 half days workshops to build scenarios and response strategies - To build the mission’s toolbox Phase 3 Part 5 : Activating Response Plan Part 6 : Activating Preparedness Plan - To provide the requested - To get prepared to respond to emergency (incl. training plans)

6. ACF-Paris tools Emergency Preparedness and Response Planning Kit (on line version and DVD format)

6. ACF-Paris tools ACF-Paris tools include:  Framework Note on Emergency Planning at ACF-Paris  Emergency Preparedness and Response Plan (EPRP) Format  ACF-Paris Toolbox to Prepare Emergency Responses GOAL: the mission has to elaborate its own tools for emergency preparedness and response. This implies: To fill in the ERPP Format To build its own Toolbox

7. Key issues There will be a dedicated resource (internal or external) – the facilitator - to implement emergency planning at the mission level. Two crucial issues for the process to be a success are: Appropriation by the mission All members of the mission, in particular those with sector responsibilities, are expected to ensure adequate coordination during the planning process within their respective sectors / clusters and agencies / organizations / local partners. Training of ACF staffs and partners The proposed methodology (EPR Plan and Toolbox) is just a proposition and has to be adapted to each ACF mission. These tools are FLEXIBLE! *HANDOUT – WORK PLAN

To be continued…