Louis E. Feagans, P.E. Statewide Technical Services Director, INDOT

Slides:



Advertisements
Similar presentations
Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
Advertisements

Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
Tracy Lovell, PE A FOCUSED APPROACH TO SAFETY. Provide a Transportation System  Safe  Efficient  Environmentally Sound  Fiscally Responsible.
I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee.
John Malbon, CEO, PAPCO & Hampton Roads Member, Virginia Commonwealth Transportation Board May 28, 2014.
District Information Session For the American Recovery and Reinvestment Act.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
U.S. 33 Northern Connector Alternative
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
Hardin County Engineering Department September 12, 2006.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Office of Project Development Department of Highways Retreat June 12, 2008.
DETERMINATION OF FREIGHT CORRIDORS FOR THE STATE OF CALIFORNIA Texas A&M University Civil Engineering Department CVEN April 28, 2003 ADHARA CASTELBLANCO.
Alternative Contracting Techniques for Urban and Rural Applications Chad M. Casey ISE 8105.
HOOSIER HEARTLAND HIGHWAY Public Information Meeting – August 27, 2009 STATE ROAD 25, SEGMENT 2 From 0.42 mile east of Tippecanoe/Carroll County line to.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
WVDOT GTI SECTION Status Update for Miss Utility.
Washington State Transportation Improvement Board U RBAN F UNDING P ROGRAMS 2012.
Maryland Transportation Authority (MDTA)
Overview to CDOT Policies and Guidance Transit and Rail Advisory Committee Meeting April 13, 2012.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
2009 ACEC/ODOT CONFERENCE ODOT’S 1R PROGRAM Liz Hunt, P.E. ODOT Pavement Services Engineer.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Condition Assessment & Funding Needs for North Carolina’s Highway System Report to the Joint Legislative Transportation Oversight Committee December 12,
Overview of the DOTD Highway Project Selection Process.
Interstate 95 Corridor Improvement Program June 20, 2012.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
‘‘Moving Ahead for Progress in the 21st Century Act’’ or ‘‘MAP–21’’ Signed into Law July 6, 2012 Implications for Infrastructure Asset Management, Pavement.
Southern Bridge Project Brown County Executive
U.S. 150 / S.R. 56 Road Reconstruction Project in Paoli, Orange County Thursday, August 25, :00pm Presentation Orange County Community Center 1075.
Bristol BF 021-1(33) Regional Concerns Meeting VT Route 116 – Bridge #12 over Baldwin Creek April 27, 2015.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
FACS-STIP Tool – Overview (Features, Attributes & Conditions Survey – Statewide Transportation Improvement Program) April 2010 Presentation for Roadway.
Waupaca County Highway 5 Year Plan We build and maintain a quality transportation system for the safety and prosperity of current and future.
STA US-30 Presentation for TRAC – October 13, 2015
1 Planning Andrea Stevenson. 2 What’s the Big Deal About Ohio’s Transportation System? Ohio is within a single day’s drive (600 miles) of 60% of the United.
Row No. Des # Sponsor Route Work Category Work Type Location County Des Length Federal Fund Type Phase Year Total Cost Federal Funds Non-Federal Funds.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Geometric Design: General Concept CE331 Transportation Engineering.
MED SR 18 Corridor Project MED PID October 13, 2015.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Objective Transportation Assets Strategic Intermodal/International Points Next Steps & Discussion Critical Issues for Ohio.
Planning and Environmental Linkages MPO/COG Conference February 24, 2016.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
The I-465 West Leg Reconstruction Project
Transportation Services Department
Project Overview – Phase 1
Community & Economic Development
Scoping for Performance-Based Solutions; CR E2 ACEC Conference March 5, 2012 Tom O’Keefe Metro District Program Delivery.
Highway 14 – Owatonna to Dodge Center District 6 Update
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Solicitation for Projects using STP/SNK/TA Federal Funds – FY2022
Overcoming Barriers to Implement Research Projects
Florida Transportation Commission FY 2009
Category 2 Parameters Transportation Management Areas (TMA) – 200,000+ pop. 8 TMAs in Texas Austin Corpus Christi Dallas-Fort Worth El Paso Hidalgo County.
Construction Management & Inspection
Geometric Design: General Concept CE331 Transportation Engineering.
Design Criteria CTC 440.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Southern Bridge Project Brown County Executive
S.R. 26 Road Rehabilitation in Clinton County
Prioritization Explained
Transportation Planning and Funding Overview
Presentation transcript:

Louis E. Feagans, P.E. Statewide Technical Services Director, INDOT Advancing HEA 1002at INDOT Louis E. Feagans, P.E. Statewide Technical Services Director, INDOT

HEA 1002 Team 2 Economists Professor Faulk of Ball State University Professor Iyer of Purdue University 2 Professional Engineers Todd Shields of INDOT Louis Feagans of INDOT

How does HEA 1002 relate to other documents and initiatives?

HEA 1002 Goals Goal FY 2019 20 year Goal % State controlled roads in fair or better condition 90.3% 95% % Bridges in fair or better condition 95.6% 97.5%

What Conditions Does INDOT Expect to Achieve? Projected Bridge Conditions

What Conditions Does INDOT Expect to Achieve? Projected Pavement Conditions

Scoring Rules for HEA 1002 Safety Congestion Environment Regional and State Economic Contribution Intermodal Connectivity Total Cost of Ownership

HA 1002 Ranking County Work Type Group Work Type Code Work Type Des Pre Contract Lead Des Year ADT Current ADT AADT _COMBO AADT _SU Project Status Designed by Group Functional Class Urbanized Area Transportation System Urban or Rural Proj Length N of Lanes Dist Route Type Route No Location Letting Date Letting FY CN Est CN Fund Latitude Longitude Start Lat Start Long End Lat End Long County Population County Unempl. Rate Safety Congestion Environment Total Net Benefits Short Term Economic Impact - Output Short Term Economic Impact - Employment Nearest 2 Potential Intermodal Connectivity Total Cost of Ownership Total Ranked Car Only ADT (Total - Trucks) Adjusted ADT Traffic Weight Straight TW/$$ Straight Traffic Weight SqRt TW/$$ SqRt Gibson P P114 Other Intersection Improvement 1800220 R 41406 Yes 2017 30,500 3,080 2,113 A State Other Principal Arterial (OPA) Not Applicable NHS Rural 0.29 4 V US 41 At SR168, Fort Branch 09/14/2022 2023 $348,374.00 $348,000.00 38.2527778 -87.567778 38.2505556 38.2547222 33,775 2.7% 3 9 -2 5 1 20.30 22 67 25307 97472 2,144,384.0000 6162.02299 6,868.51 11,637 6162.023 Union C C814 Scour Protection (Erosion) 1702893 B 41508 No 5,553 331 118 2 G 27 over Richland Creek, 4.70 miles N. of SR 44 11/16/2022 $47,235.00 $40,860.00 39.7022222 -84.9275 7,182 2.9% 6 -1 72.75 10 19 103 5104 12314 233,966.0000 5726.04014 2,108.40 9,701 5726.0401 Allen R200 Interchange Modification 1800034 41568 30,233 6,462 1,193 Interstate Fort Wayne => 200,000 0.38 F I 469 I-469 SB off-ramp @ SR 37 08/10/2022 $391,912.00 41.1333333 -85.007222 41.1316667 -85.004444 41.135 -85.01 368,450 64.45 13 150 22578 157783 2,051,179.0000 5233.77442 5,163.85 8,249 5233.7744 1702892 over Richland Creek, 4.38 miles N. of SR 44 $59,512.00 $51,480.00 39.6977778 72.76 4544.79409 8,643 4544.7941 Clark C113 Bridge Deck Replacement 1600733 41529 37,287 11,700 1,755 S 65 01.81 mile South of SR 160 over Caney Fork SBL 07/13/2022 $1,694,670.00 $1,700,999.00 38.5138889 -85.771944 115,371 3.0% 87.74 25 23832 266607 7,198,389.0000 4231.85963 13,941.18 10,709 4231.8596 C300 Replace Superstructure 1600729 01.81 miles south of SR 160 over Caney Fork NBL $1,827,346.00 $1,836,658.00 3919.28655 10,313 3919.2866 Delaware P110 Intersection Improvement 1702982 41496 18,626 1,121 2,532 Principal Arterial (Freewy/Exprswy) Muncie => 50,000 35 at McGalliard Road $241,580.00 $215,000.00 40.2183333 -85.340278 116,852 3.8% 54.58 16 133 14973 50053 800,848.0000 3724.87442 3,579.60 7,283 3724.8744 Morgan 1800106 41597 37,196 13,210 1,479 70 over I-70 EB/WB; 8.56 mi W of SR 39 $2,499,005.00 39.57 -86.632778 69,648 20.74 29 15 22507 294102 8,528,958.0000 3412.94155 15,727.04 9,949 3412.9416 Vigo 1800107 41621 21,935 12,447 585 Terre Haute over I-70; 3.44 mi W of US 41 $2,158,232.00 39.4483333 -87.469444 107,896 3.7% 65.36 28 8903 260768 7,301,504.0000 3383.09505 14,298.33 9,733 3383.0951

Safety and Congestion Safety Scoring Is it a Safety project Reducing sever crashes Reducing Fatalities Congestion scoring Does it reduce congestion Statewide congestion Regional congestion Local Congestion

Environment and Regional and State Economic Environmental impacts Relocating a house or business R/W acquisition Wetland mitigation 4(f) or other impact ADA upgrades Regional and State Economic Annual salary Road and bridge condition Detour routes Unemployment Population

Potential Intermodal Connectivity Is the project on a route to an intermodal facility 5 Major Airports 3 Maritime Ports 4 Major Rail Terminals Numbers of Trucks on route % of trucks vs total ADT Distance from facility

Total Cost of Ownership Preservation Patching, sealing, overlay Replacement New construction New road alignment

Data Collection Bridges

Patching Applications Data Collection Patching Applications ADA Bridge Clearance Retaining Walls Culverts Special Markings No Passing Zones Lighting Durable Markings Official Actions

Next Level Roads Map NextLevelRoads.com INDOT’s Next Level Roads construction map on our public website enables users to search for projects by district, year, and type. Users can also zoom-in to display information, location, and scope of individual projects. The map was publicly unveiled in April 2018. Newly announced 2018 Community Crossings projects are included. NextLevelRoads.com

Protesting of HEA 1002 I’ve seen these protest signs for years. I don’t think they’re working or going to work.

Questions?