Steering Committee Webinar March 25, 2016

Slides:



Advertisements
Similar presentations
Hydro Peaking Capacity Analysis & Northwest Regional Forecast Comparison Resource Adequacy Technical Committee July 28, 2010.
Advertisements

Out of Region Market Assumptions Resource Adequacy Technical Committee April 6 th, 2011.
Preliminary Resource Adequacy Assessment for the 2017 Pacific Northwest Power Supply NW Resource Adequacy Forum Technical Committee Meeting August 16 th.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
Resource Adequacy in PJM
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
Resource Adequacy Forum 2019 Adequacy Assessment Overview PNGC Offices June 28, 2013.
Genesys Model Enhancements October 4, 2011 NW Resource Adequacy Steering Committee Meeting Gwendolyn S Shearer.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Developing an Adequacy Metric Resource Adequacy Forum Technical Subcommittee Meeting October 16, 2009.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
Illustrative FCRPS Examples Comparing Capacity Adequacy Calculations for Federal Hydro- Dominated System Mary Johannis PNW Resource Adequacy Technical.
Proposed Contract to Perform Regional Sustained Hydro Peaking Capability Study Mary Johannis PNW Resource Adequacy Steering Committee January 29, 2008.
May 31, Resource Adequacy Capacity Standard Resource Adequacy Forum Technical Committee May 31, 2006 Background Image: Bennett, Christian Science.
June 27, Pacific Northwest Resource Adequacy Assessment for 2010 and 2012 Resource Adequacy Forum Steering Committee Meeting Northwest Power Pool.
Resource Adequacy Technical Committee Meeting April 6, 2011.
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Mary Johannis PNW Resource Adequacy Technical Committee Mtg November.
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Eric King/ Mary Johannis PNW Resource Adequacy Technical Committee.
Resource Adequacy Steering Committee Meeting October 4, 2011.
Rocky Mountain Area Transmission Study Steering Committee Meeting January 13, 2003 RAWG proposed Alternatives.
Relationship of Regional Resource Adequacy Standards to Utility Planning PNW Resource Adequacy Steering Committee Meeting June 27, 2007.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
Final Report Weather Sensitive Emergency Response Service (WS ERS) Pilot Project Carl Raish, ERCOT Technical Advisory Committee November 7, 2013.
1 PNW Regional Contingency Resources Resource Adequacy Technical Committee April 6 th, 2011.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
Regional Technical Forum Future Funding Discussion March 19, 2014 RTF PAC Presentation.
Moving toward a Final Resource Adequacy Standard Resource Adequacy Forum Steering Committee Meeting September 27, 2007.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Steering Committee Meeting April 13, 2007.
Capacity Metric & Hydro Capacity Assessment Decisions Mary Johannis PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Out of Region Market Assumption Resource Adequacy Technical Committee December 1, 2011.
Pacific Northwest Resource Adequacy Assessment for 2011 and 2013 Resource Adequacy Forum Steering Committee Meeting July 21, 2008.
2006 Report on the Capacity, Demand, & Resources for the ERCOT Region Technical Advisory Committee June 1, 2006 Kenneth A. Donohoo. P.E. Manager, Transmission.
Generation Adequacy Task Force Meeting April 10, 2014.
Hybrid Forecast for Resource Adequacy Analysis with recommendations Massoud Jourabchi April
Defining LOLP Resource Adequacy Forum Technical Subcommittee Meeting November 14, 2008.
Steering Committee Meeting March 9, Why talk about assumptions? Garbage in, garbage out! “Let’s go dumpster diving!” Results sensitive to key.
PEAK CAPACITY COST & DEMAND RESPONSE PACIFIC NORTHWEST DEMAND RESPONSE PLANNING COMMITTEE BILL DICKENS TACOMA POWER FEBRUARY 23, 2012.
Shaping Up The Duck Chart Independent Energy Producers Association Annual Meeting Mark Rothleder Vice President, Market Quality and Renewable Integration.
2021 Adequacy Assessment Data Requirements Resource Adequacy Advisory Committee Technical Committee Meeting March 18, 2016.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
“Other” Cost Estimates
MWG Recommended Hydro Improvement March 7, 2017
Restructuring Roundtable March 24, 2017 Boston, MA
Demand Response in the 7th Power Plan
Steering Committee Webinar March 25, 2016
Vetting the GENESYS Model
MWG Recommended Hydro Improvement March 14, 2017
Nordic Summary of the Winter
Out of Region Market Assumptions
Jeff King Northwest Power & Conservation Council July 28, 2010
Resource Adequacy Assessment for 2015 Interim Results Resource Adequacy Forum Technical Committee Meeting July 28, 2010.
Financial benefits of solar and wind power in South Africa in 2015
MWG Recommended Hydro Improvement March 7, 2017
Pacific Northwest Resource Adequacy Assessment
Technical Committee Meeting January 27, 2012
2021 Adequacy Assessment Status Report
Steering Committee Webinar March 25, 2016
Capacity Analysis in the Sixth Plan
Technical Committee Meeting March 18, 2016
Technical Committee Meeting March 18, 2016
Progress on Resource Adequacy Assessment for 2017
Jim Mcintosh Director, Executive Operations Advisor California ISO
Resource Adequacy Steering Committee Meeting October 4, 2011
Resource Adequacy Technical Committee Meeting April 22, 2010
Base on maximum operating wind capacity at end of planning period
Simulated vs. Real Hourly Dispatch Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Presentation transcript:

Steering Committee Webinar March 25, 2016 2021 Adequacy Assessment Technical Committee Recommendations Reference Case and Scenarios Resource Adequacy Advisory Committee Steering Committee Webinar March 25, 2016

Reference Case (Based on 7th Plan Assumptions) Adjusted LTM loads with RPM expected EE and DR? Import availability Spot (2500 MW all hours winter, 0 summer) Purchase Ahead (3000 MW off-peak hours, all year) IPP generation Full availability winter 1000 MW summer EE quarterly mean and peak from RPM Regional wind modeled as BPA wind Regional solar has fixed generation pattern

Suggested Scenarios Reference Studies (using LTM loads) Reference Case (med load, 2500 MW import) Load Ranges (med, med-high, high) Import Ranges (0, 2500, 3400) Sensitivity Studies Reference case with STM loads, RPM EE, DR? Reference case with STM EE shapes Reference case with STM loads and EE shapes Fuel limitation: Remove Gray’s Harbor (650 MW) Reference case with no new DR