Arm Length Stabilization Conceptual Configuration

Slides:



Advertisements
Similar presentations
LIGO-G V8 1 aLIGO DC Power Distribution Contents.
Advertisements

Hiro Yamamoto at LCGT f2f ICRR on September 28 th, 2010 LIGO-G v1 LCGT-G v1 LIGO and LCGT collaboration Hiro Yamamoto / LIGO Lab Based.
KAGRA ISC Electrical Components Layout Yuta Michimura Ando Group Department of Physics, University of Tokyo April 17, 2015.
In our original plan we proposed to start the construction of the squeezer in Cascina starting from The design study of the squeezer is almost completed.
G v1 Squeezer Update Review August 25, 2009 H1 Squeezer Experiment ANU, AEI, MIT, CIT and LHO collaboration.
Electronics and Cables around IMC Common Mode Servo Board Yuta Michimura Ando Group Department of Physics, University of Tokyo August 10, 2015.
Koji Arai – LIGO Laboratory / Caltech LIGO-G v1.
SEO report _SAITO 1. Overall schedule of iKAGRA installation/commissioning change to Michelson Interferometer 2. Scheduling of daily works for installation.
Summary of Suspension Configurations Yuta Michimura Department of Physics, University of Tokyo March 18, 2015.
LIGO- G R Telecon on June, Mach-Zender interferometer to eliminate sidebands of sidebands for Advanced LIGO Osamu Miyakawa, Caltech.
Optical Levers Layout and Cabling Yuta Michimura, Yuya Kuwahara Ando Group Department of Physics, University of Tokyo November 19, 2015.
Intensity Stabilization Servo Plan Yuta Michimura Department of Physics, University of Tokyo November 23, 2015.
New iKAGRA Configuration Yuta Michimura Department of Physics, University of Tokyo 11th KAGRA F2F (University of Tokyo) Feb 6, 2015.
LIGO-G09xxxxx-v1 Form F v1 LIGO Laboratory1 Designing a frequency offset locking loop for the 40m prototype Arm Length Stabilization System Sai.
KAGRA ISC Electrical Components Layout Yuta Michimura Ando Group Department of Physics, University of Tokyo December 8, 2015.
Cabling Policy for KAGRA ISC Yuta Michimura Ando Group Department of Physics, University of Tokyo March 14, 2016.
IKAGRA 初期アラインメント手順 Initial Alignment Procedure for iKAGRA Yuta Michimura Department of Physics, University of Tokyo July 5, 2016JGW-T
Arm Length Stabilization Conceptual Configuration Yuta Michimura Department of Physics, University of Tokyo JGW-T November 14, 2016.
bKAGRA PSL Design Study
Phase Feed-Forward Piotr Skowroński (CERN)
Main Interferometer Subsystem
Summary of iKAGRA Test Run Mar 25-31, 2016
Summary of iKAGRA Test Run Apr 11-25, 2016
Kazuhiro Yamamoto on behalf of KAGRA collaboration
Progress toward squeeze injection in Enhanced LIGO
Status of PLL system of ALS
A study of Arm Length Stabilization in KAGRA
Yuta Michimura Department of Physics, University of Tokyo
Electronics and Cables around IMC Common Mode Servo Board
Yoichi Aso on behalf of the LCGT ISC Group
Summary of the iKAGRA Run
Interferometer Design for bKAGRA Phase 1 and Beyond
Arm Length Stabilization Conceptual Configuration
Arm Length Stabilization Conceptual Configuration
Cartoon of the optical layout around IMC, IFI and IMM
RF and DC Cabling Policy for KAGRA ISC
Interferometer Design for bKAGRA Phase 1 and Beyond
Summary of iKAGRA Test Run Mar 25-31, 2016
Summary of iKAGRA Test Run Mar 25-31, 2016
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
Commissioning Procedure for bKAGRA Phase 1 ( )
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Commissioning Procedure for bKAGRA Phase 1 ( )
Summary of the iKAGRA Run
Commissioning Procedure for bKAGRA Phase 1
2s2 The point of this presentation is for you to put up an example, then pause. After each example, ask if they see a pattern. They should not see a pattern.
Commissioning Procedure for bKAGRA Phase 1
Squeezed Light Techniques for Gravitational Wave Detection
Commissioning Procedure for bKAGRA Phase 1 ( )
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Yuta Michimura Department of Physics, University of Tokyo
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Commissioning Procedure for bKAGRA Phase 1
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Commissioning Procedure for bKAGRA Phase 1
Interferometer Design for bKAGRA Phase 1 and Beyond
Beam Propagation for bKAGRA Phase 1 with flat ETMs
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Summary of iKAGRA Test Run Mar 25-31, 2016
Intensity Stabilization Servo Plan
RF and DC Cabling Policy for KAGRA ISC
Interferometer Design for bKAGRA Phase 1
Yuta Michimura Department of Physics, University of Tokyo
Yuta Michimura Department of Physics, University of Tokyo
Intensity Stabilization Servo Plan
KAGRA ISC Electrical Components Layout
Yuta Michimura Department of Physics, University of Tokyo
KAGRA ISC Electrical Components Layout
Presentation transcript:

Arm Length Stabilization Conceptual Configuration JGW-T1605353 May 10, 2019 Arm Length Stabilization Conceptual Configuration Yuta Michimura Department of Physics, University of Tokyo

Candidate1 (aLIGO-like) 40 MHz ~ offset 80 MHz PDH ~ ALS DIFF AUX X ~ PLL 80 MHz offset ALS COMM SHG PSL IMC FSS AOM PDH Ref Cav AOM ~ ~ 80 MHz 40 MHz 80 MHz ~ PDH AUX Y PLL

Candidate2 (simplified-aLIGO) 40 MHz ~ offset 40 MHz PDH ~ ALS DIFF AUX X ~ PLL 40 MHz offset ALS COMM PSL IMC FSS PDH Ref Cav AOM ~ 80 MHz 40 MHz ~ PDH AUX Y PLL

Candidate3 (Tatsumi/Arai/Aso) 40 MHz ~ offset PDH AOM AUX X PLL PSL IMC FSS PDH Ref Cav AOM ~ 80 MHz 40 MHz ~ offset PDH AOM AUX Y PLL

Candidate4 (hybrid) ~ ~ ~ 40 MHz offset PDH ALS DIFF AOM AUX X PLL ALS COMM PSL IMC FSS PDH Ref Cav AOM ~ 80 MHz 40 MHz ~ offset PDH AOM AUX Y PLL

Considerations Where to put PLL setup for PSL vs AUX X/Y Where to put green beat setup for ALS COMM Where to put green beat setup for ALS DIFF Plan 1: All at PSL clean booth - need two fibers to send AUX green to POS/POP table - enough space for optics at PSL table? [Nakano] - enough space for electronics at IOO racks? [Michimura] -> yes Plan 2: AUX X at POP, AUX Y at POS - need two fibers to send PSL green to POS/POP table beat for PLL also with green? - need one fiber to send AUX X green to POS - enough space for electronics at ISC racks? [Michimura] -> yes

Setup for Table-Top Experiment? Conceptual drawing made by Kambara to be fixed [Kambara]

Schedule to be fixed [Matsushima] very rough schedule 2016.7-10: ALS design 2016.10-2017.9: Table-top experiment at Univ. Toyama 2017.5-2017.6: BRT installation at Kamioka 2017.6: PRs and BS ready (no ETM yet) 2017.7?-??: GreenX installation at Kamioka? 2017.10-2018.3: GreenX/Y installation at Kamioka ? 2018.8: ITM/ETM CRYp installation complete 2018.9-: ALS experiment at Kamioka

Releated References aLIGO configuration https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=11083 http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1895 Study by Tasumi-san et al. in 2011-2012 https://granite.phys.s.u-tokyo.ac.jp/svn/Private/trunk/LCGTbackup/GreenLock/ http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=788 http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1268