6.375 Final Project March 2, 2009 http://csg.csail.mit.edu/6.375.

Slides:



Advertisements
Similar presentations
MEMOCode 2007 Design Contest – MIT Submission N. Dave, K. Fleming, M. King, M. Pellauer, M. Vijayaraghavan.
Advertisements

Phase 2Phase 3Phase 4 Phase 5Phase 6 Phase 1 May – Aug 2007 Sept – Dec 2007 Jan – Apr 2008 May – Aug 2008 Sept – Dec 2008 Jan – Apr 2009 MUS Biennial Planning.
Lecturer: Simon Winberg Lecture 18 Amdahl’s Law & YODA Blog & Design Review.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Hardware Implementation of Antenna Beamforming using Genetic Algorithm Kevin Hsiue Bryan Teague.
Weekly Report Ph.D. Student: Leo Lee date: Oct. 9, 2009.
Project 4 U-Pick – A Project of Your Own Design Proposal Due: April 14 th (earlier ok) Project Due: April 25 th.
Closely-Coupled Timing-Directed Partitioning in HAsim Michael Pellauer † Murali Vijayaraghavan †, Michael Adler ‡, Arvind †, Joel.
ClearEye: An Visualization System for Document Revision CPSC 533C Project Update Qiang Kong Qixing Zheng.
CS244-Introduction to Embedded Systems and Ubiquitous Computing Instructor: Eli Bozorgzadeh Computer Science Department UC Irvine Winter 2010.
1 Course Schedule Spring 2006 Exam 1 February 2006 Project Introduction(5pages)3/24/06 Project Testing 3/24-4/15 Exam 2 4/11/06 Presentation instructions:
Technion – Israel Institute of Technology Department of Electrical Engineering High Speed Digital Systems Lab Written by: Haim Natan Benny Pano Supervisor:
Implementation of DSP Algorithm on SoC. Characterization presentation Student : Einat Tevel Supervisor : Isaschar Walter Accompany engineer : Emilia Burlak.
State of the Art in Theory and Practice of Rural Development Measures Partner 4: The University of Wales Aberystwyth.
Chapter 28 Activity Diagrams Model processes: –Business processes –Workflow –Data flow –Complex algorithms.
1 Welcome to EQ2430/EQ2435/EQ2440 Project in Wireless Communication Lecture 1 March 20, 2015 Per Zetterberg School of Electrical Engineering.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Project Management Week 2 Day 2.
CSCE 430/830 Course Project Guidelines By Dongyuan Zhan Feb. 4, 2010.
Kaichen Zhao & Junhan Zhu ECE 750 Course Project PID Control for GPS.
Matrix Multiplication on FPGA Final presentation One semester – winter 2014/15 By : Dana Abergel and Alex Fonariov Supervisor : Mony Orbach High Speed.
Cloud Resource Scheduling for Online and Batch Applications Kick-off meeting.
Digital Image Processing: Bernd Girod, © Stanford University -- Project Proposals 1 EE368/CS232 Final Project Develop, implement and test/demonstrate.
Hybrid Prototyping of MPSoCs Samar Abdi Electrical and Computer Engineering Concordia University Montreal, Canada
2014 ML Project2: Goal: Do some real machine learning; learn you to use machine learning to make sense out of data. Group Project—4 (3) students per group.
HIST*4170 Project Presentations 23 and 30 March 2015.
CS244-Introduction to Embedded Systems and Ubiquitous Computing Instructor: Eli Bozorgzadeh Computer Science Department UC Irvine Winter 2010.
Forecasting Steps and Deadlines Attend a running start orientation at Clark (contact running start office for make up dates if you.
NATIONAL INTER-SCHOOL TABLE TENNIS CHAMPIONSHIP 2015
Students:Or YochananSupervisors:Mony Orbach Amir ShmulErez Tsidon Project timeframe: 2 Semester.
Progress presentation
2/19/2016http://csg.csail.mit.edu/6.375L11-01 FPGAs K. Elliott Fleming Computer Science & Artificial Intelligence Lab Massachusetts Institute of Technology.
(Source: Wager et al., p. 145). SDLC: 4 Common Phases Planning & Analysis Design Phase Implementation Support & Evaluation Click to View this Dynamic.
HOKLAS th Edition Implementation Schedule 21 Oct 0515 May 0615 Apr 0715 May 07 Assessments:8 th ed. 7 th ed. based applications, reassessment and.
CPMGT 300 Week 2 Individual Project Proposal Check this A+ tutorial guideline at
Component 3 Programmed Solution to a problem
Recommendation of Texas Test Plan Team to RMS
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
WIND And Solar ENERGY CONVERSION MODEL GUIDELINES Consultation update – September 2016 Presented by Marcelle Gannon.
2017 IT Summit Planning CIO Council Update
Dr Sally Priest, Flood Hazard Research Centre
Data & Technology Updates April, 2016
Campus Master Plan.
Alternative group process at large units using the «world cafe» method
Work Environment Survey 2017 – action plan Date:…… Name of unit:…………………………………………………………… (place on the work environment file of the unit) Concrete actions.
UNMJobs Implementation
Software Development Process
Guidelines for Resident Quality Improvement Project
DSPs for Future Wireless Base-Stations
6.375 Final Project.
Embedded Computer Architecture 5SIA0 Overview
MAINTENANCE TRAINING SCHEDULE
Irregularities in DoRIS
Duy Dang, Robert Kern, Esteban Kleckner
FAY Dates School Year Traditional Fall 4x4 Spring 4x
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Incremental Waterfall
Final Project presentation
2/18/2019 E-commerce Project Minpeng Zhu.
2/25/2019 E-commerce Project Minpeng Zhu.
Irregularities in DoRIS
Omnibus IV Contract Overview Elieen Emond Contract Specialist
Structural Funds: Investing in Roma
PCS Technical Board 27th February 2018, Vienna.
Port Back Data Collection & Transition
May is Coming !!! January 31st: Project approval (16 days from now) • Brainstorming, team formation, successful RFA February 7th: Project proposal (+7.
Port Back Data Collection & Transition
System Analysis and Design:
Port Back Data Collection & Transition
Prof. Timothy Waema, Program Leader
PLAN OF WORK Plan of work is the general scheduling of program according to major activities (or phases) such as planning, implementation and evaluation.
Presentation transcript:

6.375 Final Project March 2, 2009 http://csg.csail.mit.edu/6.375

Guidelines Ideally – groups of two to three Goal: A complex digital design – functional on FPGAs, useful, substantial Ideas related to your research domain welcome Past projects online – http://csg.csail.mit.edu/6.375/6_375_2008_www/projects.html http://csg.csail.mit.edu/6.375/6_375_2007_www/projects.html http://csg.csail.mit.edu/6.375/6_375_2006_www/projects.html http://csg.csail.mit.edu/6.884/projects.html March 2, 2009 http://csg.csail.mit.edu/6.375

Project Schedule Weekly project meetings and deadlines Intermediate reports due according to following schedule: Date Task Report Mar 16 Preliminary proposal April 01 High-level Design & Arch Final proposal with diagram Apr 08 Detailed Microarchitecture Testing plan Apr 22 Routable Implementation Synthesis report (SR) Apr 29 Simulation Demonstration Perf expectations, tuning & SR May 06 FPGA Demonstration Design exploration plan & SR May 13 Project Presentation May 14 Project Report March 2, 2009 http://csg.csail.mit.edu/6.375

Project ideas Floating point Unit & other processor accelerators Asif Khan, Murali Vijayaraghavan SHA-3: Hash algorithm evaluation Elliott Fleming Channel Estimation Alfred Man Cheuk Ng HAsim: Cycle-accurate performance modeling Michael Pellauer DRAM controller Jae Lee March 2, 2009 http://csg.csail.mit.edu/6.375