Towards an improved policy on industrial emissions Third Meeting Of Working Group E On Priority Substances 3 March 2008.

Slides:



Advertisements
Similar presentations
High Level Group on Administrative Burdens 5 th March 2009 Administrative Burden Reduction in DG Environment Timo Mäkelä European Commission – DG Environment.
Advertisements

EU FORMAL REGULATION – TYPES OF STANDARDS ENVIRONMENTAL QUALITY OBJECTIVES ENVIRONMENTAL QUALITY STANDARDS.
Industrial Emissions Directive Overview. Purpose Update IPPC Directive Update IPPC Directive Combine sectoral directives into a single text Combine sectoral.
The Industrial Emissions Directive (IED) 2010/75/EU
1 SG C Commission Communication on EU Regulatory Fitness COM (2012) 746 Working Group on Better Regulation Meeting of 4 th March, 2013 Michael Gremminger.
Industrial Pollution Control and Risk Management: IPPC Neil Emmott Environment Directorate-General 7 April 2006.
Main Developments in EU Environment Policy. 1.The 7 th Environmental Action Plan 2.Waste Electrical and Electronic Equipment Updated Directive 3.Timber.
Insert Filepath here International Symposium on Environmental Issues Industrial Pollution Control and Risk Management September 28 & Jack O’Keeffe.
The IPPC Recast. New environmental requirements for explosives production sites.
1 Towards an improved policy on industrial emissions - Impacts on the waste management industry - Marianne Wenning European Commission, DG ENV.C.4 FEAD.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
BAT as a main tool for minimisation of the negative impact of industrial activities Aivi Sissa Tallinn – Estonia 27 – 28 March 2008.
The Industrial Emissions Directive (IED) 2010/75/EU Gabriella Gerzsenyi & Menno Verheij European Commission, DG Environment Industrial Emissions Unit 03.
1 The Industrial Emissions Directive (IED) Environmental inspections Filip François DG ENV.C.3 - Industrial Emissions team Joint European Commission –
An overview of the industrial emissions Directive Richard Vincent Head of Industrial Pollution Control Department for Environment, Food and Rural Affairs.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
Current state on Harmonisation and Implementation/Enforcement of Environmental Legislation - Industrial Pollution Control in SLOVENIA Barbara Bernard Ministry.
IPPC Directive state of play and future developements
The IPPC Directive and its implementation Alexandre Paquot European Commission Environment Directorate-General Phare Capacity.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
EU Legislation in the field of environment – key developments in 2007 and rd ECENA Plenary Meeting 18 September 2008.
The Industrial Emissions Directive (IED) 2010/75/EU Gabriella Gerzsenyi & Menno Verheij European Commission, DG Environment Industrial Emissions Unit 03.
AйПиПиСи ?? IPPC implementation - experience from new EU member countries & changes brought by Industrial Emissions Directive Monika Přibylová Kiev, 10.
1IndustrialEmissionsDirective. 2 The European Parliament is discussing the Industrial Emissions Directive as adopted by the Council for the second reading.
Joint European Commission – IMPEL Seminar on Environmental Inspections Wednesday 17 November 2010 Hotel Le Meredien, Brussels 1.
Recommendation 2001/331/EC: Review and relation to sectoral inspection requirements Miroslav Angelov European Commission DG Environment, Unit A 1 Enforcement,
1 Review of the Integrated Pollution Prevention and Control (IPPC) and National Emission Ceilings (NEC) Directives Marianne Wenning DG ENV, Head of Unit,
FEAD ANNUAL CONFERENCE 2008 Future Challenges for the Waste Management Industry Paris, 19 September 2008.
Assessment of options to streamline legislation on industrial emissions IPPC Review Stakeholder Hearing 4 May 2007 Caspar Corden Entec UK Limited.
REVISION OF THE IPPC DIRECTIVE  DIRECTIVE ON INDUSTRIAL EMISSIONS.
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
Twinning project ENEA – ENforcing Environmental Acquis Skopje, 19 th of November, 2015.
BERCEN plenary meeting Sofia, March 18, 2005 Agenda item 8 Draft Scope and Proposed Location of BERCEN Training 2005 BERCEN Secretariat.
E-PRTR Refit evaluation and Article 17 official data review 1 2 nd Global Round Table on PRTRs 25 November 2015 Andreas Grangler.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
The current legal situation
1 Review of the IPPC Directive and related legislation Second Meeting Of Working Group E On Priority Substances 17 October 2007 Filip FRANCOIS – DG ENV.
IPPC recast and air emissions Gergely Simon Lisbon.
1 Overview of the Proposal for a Directive on industrial emissions (IPPC) Keir McAndrew - European Commission, DG ENV.C.4 - Industrial Emissions, ozone.
Ministry for Ecology, Energy, Sustainable Development and Sea in charge of Green Technologies and Climate Negotiations
Revised Directive 2005/36/EC Nurses responsible for general care
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 1 The IPPC Directive Introduction to the philosophy Rob Kramers.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
Introduction to the philosophy
MONITORING Mr. Jan Prášek IPPC Agency.
BAT - BREF Their scope Rob Kramers Senior advisor InfoMil.
First position of the Belgian industry about the
Overview of public participation in strategic decision-making in the UNECE area David Aspinwall.
Reporting on industrial installations
Content of the presentation
Ефикасно коришћење енергије у металургији-IPPC
The IED: Industrial Emissions Directive DG ENV. C
SCP in the 7th Environmental Action Programme
IPPC Directive Discussion on Reporting on ELV and BAT 4th Reporting Questionnaire, Q. 6.1 IEEG meeting 7 December 2010.
Expert Advisory Forum on priority substances
IPPC Review Stakeholder Hearing
Ex ante conditionalities in cohesion policy:
Reduction of total releases from unintentional production of POPs
INNOVATION DEALS: A NEW APPROACH TO REGULATION
Commission proposal for a new LIFE Regulation CGBN meeting
Introduction to the first meeting of the IPPC Review Advisory Group
DG ENV C3 Industrial Emissions, Air Quality and Noise 20 January 2012
Data specifications for IED Annex II Module 4
IPPC Review Stakeholder Hearing 4 May 2007
Environment in Cohesion Policy framework for
Industrial Emissions Directive Targeted stakeholder survey
WFD CIS Working Group Meeting Brussels, 4/4/2019
Presentation transcript:

Towards an improved policy on industrial emissions Third Meeting Of Working Group E On Priority Substances 3 March 2008

Content of the presentation Background to the proposal The Commission’s proposal – why and what? The Commission’s Communication ‘Toward an improved policy on industrial emissions’ Next steps

The current situation European Industry is subject to a range of environmental legislation.... IPPC Directive VOC Solvents Directive Waste Incineration Directive European Pollutant Emission Register (EPER) European Pollutant Release and Transfer Register (E-PRTR) Directives related to the titanium dioxide industry Large Combustion Plants Directive This makes enforcement at Community level very difficult and leads to unnecessary administrative burden

The Commission’s IPPC review The review began in early 2006, with data collection taking place over the following two years. Supported by 10 key studies focusing on: horizontal issues including implementation, environmental benefits, impacts on competitiveness; and sectoral issues including waste treatment, agriculture, waste incineration and large combustion plants Approximately 100 case study installations were analysed The entire process was overseen by an Advisory Group (Member States, industry, NGOs)

Concerns with the status quo The IPPC review identified 5 main areas of concern: Insufficient implementation of BAT Limitations with regard to compliance, enforcement and environmental improvements Unnecessary administrative burdens due to complexity and inconsistency of parts of legal framework Insufficient scope and unclear provisions to achieve the Thematic Strategy objectives (air, waste, soil) Constraints on the use of more flexible instruments, such as NOx and SO2 emission trading systems

The Commission’s Solution The 5 key areas of concern require action to be taken in the form of: Revision of the current legislation on industrial emissions through simplification, clarification and strengthening Commission’s proposal for a Directive on industrial emissions (integrated pollution prevention and control) (COM(2007) 844 final): recasts 7 Directives into a single Directive The proposal is supported by an impact assessment Reinforce the Commission’s existing Action Plan on implementation Commission Communication “Towards an improved policy on industrial emissions” (COM(2007) 843 final)

The Recast process Recast brings together, into a single new act, a legislative act and all the amendments made to it (horizontal) or a legislative act and related acts (vertical) Recasting involves new substantive changes, as amendments are made to the original act The new act passes through the full legislative process and repeals all the acts being recast

The Recast process (contd.) The main thing to remember is: Substantive amendments (grey shaded) are discussed and agreed during the co-decision process Adaptations are indicated by markers ⌦⌫ and in principle, these elements are not discussed or amended during the co-decision process A minor change is usually editorial in nature and these elements are not discussed and agreed during the co-decision process. Unchanged text is not open for discussion! See guidance on IPPC web site

Issue 1: Insufficient implementation of BAT Permits issued to operators must contain BAT based permit conditions (Article 16(2)) BREFs are the main reference for determining Emission Limit Values (ELVs) Permit conditions cover not only emissions to air and water, but also consider issues such as emissions to land, waste management, energy efficiency, environmental management systems and prevention of accidents (Article 15(1,2))

Issue 1: Insufficient implementation of BAT BREFs contain emission levels associated with the use of BAT (BAT-AELs) Permits contain emission limits set by the competent authority that do not exceed BAT-AELs (Article 16(2)) must Derogation from these limits is allowed in specific cases as long as it is justified (Article 16(3))

Issue 1: Insufficient implementation of BAT BREFs contain BAT AELs that generally cover a range of values Units of measurement (e.g. mg/m3, g/t) Averaging periods (e.g. daily, yearly) Reference conditions (e.g. 3% oxygen in waste gas) Permits must contain at least emission limits that do not exceed the BAT-AELs under the conditions set in the BREF Competent authorities to decide on monitoring regime for ELVs (frequency of measurement, standards to be used) compliance regime for ELVs (enforcement rules: number of exceedances; how to address measurement uncertainties) possible additional ELVs with different averaging period (e.g. yearly) or units (e.g. specific instead of concentrations) than described in the BREFs abnormal periods of operation (e.g. during start up and shut down) possible additional ELVs for other pollutants than described in the BREFs 10-50 mg/m3; daily <50 mg/m3; daily

Issue 1: Insufficient implementation of BAT Tightening of minimum emission limit values for large combustion plants Aligned with current BAT (upper end of the range) Implementation deadline: 2016 Significant contribution to the objectives of the Thematic Strategy on Air Pollution Net benefits of €7-28 billion per year

Issue 2: Limitations with regard to compliance, enforcement and environmental improvements Minimum provisions for inspections Production of inspection plans and programmes for IPPC installations At least one inspection every 12 months unless the programmes are based on a systematic appraisal of the environmental risks of the installations concerned Comitology for setting of minimum criteria

Issue 2: Limitations with regard to compliance, enforcement and environmental improvements review of permit conditions BAT is a dynamic concept and changes with time Permits must consequently be reconsidered within 4 years of the publishing of a new BREF in order to ensure that the installation concerned still operates according to BAT In some cases permits will have to be updated to reflect changes to BAT described in the most recent BREF This ensures that emission reduction continues to be at the forefront of operator thinking

Issue 2: Limitations with regard to compliance, enforcement and environmental improvements reporting by operators Operators to annually report on compliance to ensure that permit conditions are met, and that operators remain familiar with both their permit, and with changes in BAT

Issue 3: Unnecessary administrative burdens The Commission has identified reductions in administrative burden through the introduction of: Reduced reporting requirements for Member States and operators Simplified use of general binding rules Unified / Single permits for installations subject to the proposed Directive Actions at EU level should reduce administrative burden by €31 million per year However, working with Member States on administrative burden at a national level could result in a further €150-300 million saving per year Provisions also included to stimulate the development of eco-innovative techniques

Issue 4: Insufficient scope and unclear provisions threaten the Commission’s Thematic Strategy objectives Environmental improvements through the introduction of new activities to the scope of IPPC: Combustion installations 20-50MW Wood preservation activities Some additional waste management activities Clarification of IPPC scope: in particular for waste, food & drink, farming activities Significant benefits: inclusion of 20-50MW combustion installations net environmental and health benefits of approx. €732 million to €1.6 billion

Issue 5: Constraints on the use of more flexible instruments such as NOx and SO2 emission trading systems The Commission has not included provisions within the legal text concerning NOx and SO2 emissions trading Studies have shown that such a tool could be cost-effective and could provide significant savings in achieving environmental improvements. However, clear EU-wide rules are necessary. The Commission will continue to undertake research in this area

Expected benefits of the Commission’s proposal Significant environmental and health benefits through the application of BAT, better enforcement and inspection and the extension of the scope of the legislation For the LCPs alone: net environmental benefits from emission reduction of €7-28 billion per year including the annual reduction of premature deaths by 13 000 Reduction of administrative burden of €105-255 million per year A more unified application of BAT that improves environmental performance whilst reducing distortion of competition The impact assessment has shown that the proposals will have no long term impacts on competitiveness

Indicative timeline for the future 01/2009 07/2012 07/2015 01/2014 01/2016 12/2007 12/2010 Depending on the co-decision procedure the Commission expects the following to take place… The Commission adopts its proposal for a Directive on industrial emissions as well as issuing its Communication ‘Towards an improved policy on industrial emissions’ First reading in the European Parliament and political agreement in Council Completion of the co-decision process and publication of the Directive on industrial emissions within the Official Journal Member States fully transpose the new Directive (18 months after entry into force). The Directive applies to all new installations from this date onwards All existing installations previously subject to IPPC, Waste Incineration, Solvent Emissions and Titanium Dioxide Directives must meet the requirements of the new Directive. Large Combustion Plants do not yet need to meet the new ELVs prescribed within the Directive. The newly prescribed activities such as smaller combustion units and wood preservation activities must meet the requirements of the new Directive. Large Combustion Plants must meet the requirements set out in Chapter 2 of the new Directive, as well as the Emission Limit Values set out in Annex V

The Commission’s Communication The Commission Communication sets the context for the Commission’s future activities with regard to industrial emissions control It describes the key issues identified as part of the Commission’s review of industrial emissions legislation Recognising that the Commission’s legislative proposal will take a number of years to come into effect, it includes an update to the IPPC Action Plan that looks to improve the implementation of the present legislation

The revised IPPC Action Plan The Commission’s revised IPPC Action Plan builds upon the experience gained in the implementation of the Directive to date and the Action Plan from 2005 The Action Plan identifies 5 key actions 1. Ensure full transposition of the legislation on industrial emissions 2. Support Member States in cutting unnecessary administrative burdens 3. Support Member States in their implementation of the legislation 4. Enhanced monitoring and compliance checks of the application of the legislation on industrial emissions 5. Improve data collection for review of BREFs and create stronger links with the Research Framework Programme

For more information… Information on the proposal, as well as the review undertaken by the Commission on the present legislation can be found through: DG ENV industrial emissions website http://www.ec.europa.eu/environment/ippc/index.htm