Amendment to Section M to be consistent with Faster Switching proposals (Mod 512) October Panel Title slide [from Title Slide master] The title slide is available as a Title Master and the background and graphic elements are fixed. Text is editable for the slide heading and presentation details but the British Gas brand mark and other graphic elements are fixed on the Title Master. Font, type size and colours are fixed for the Title Master style and should not be modified.
Amendment to Section M to be consistent with Faster Switching proposals Background Modification 0477 “Supply Point Registration” set out a new minimum Confirmation period of 14 Business Days to enable faster switching An error with the original Legal text was identified This housekeeping modification seeks to align Section M 3.2.9 of the UNC with the proposals set out in Modification 0477 The Proposer invites the Panel to: • Determine that this modification should be subject to self-governance • AGREE that this modification should be issued to consultation