SSRF storage ring improvement in beam line phase II project

Slides:



Advertisements
Similar presentations
Status and Future of BESSY RF BESSY II operating since 1999 Willy Wien Laboratory groundbreaking 9/2004 HoBiCaT Testfacility for sc cavities Commissioning.
Advertisements

Mezentsev Nikolay Budker Institute of Nuclear Physics
Necessity of Moving from Green Book to White Book M. Hadi Hadizadeh Yazdi International Scientific Meetings Office Iran October 26, 2002 Amman, Jordan.
SSRF Light Source Complex Zhao Zhentang for the SSRF Project Team Shanghai Symposium on Intermediate Energy Light Sources Shanghai China, September 24-26,2001.
Dr. Zafer Nergiz Nigde University THE STATUS OF TURKISH LIGHT SOURCE.
M. Bieler, M. Ebert, L. Fröhlich, J. Keil, J. Klute, G. Kube, G. K. Sahoo, R. Wanzenberg, DESY, Hamburg, Germany Abstract Acknowledgment Commissioning.
G.N. Kulipanov, N.A.Mezentsev, A.V. Philipchenko, K.V. Zolotarev
SESAME Synchrotron Light for Experimental Science and Applications in the Middle East JSPS Asien Science Seminar Synchrotron Radiation Science Dieter Einfeld.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Conventional Facilities Advisory Committee May 8 - 9, 2007 Satoshi Ozaki Director,
Update of 3.2 km ILC DR design (DMC3) Dou Wang, Jie Gao, Gang Xu, Yiwei Wang (IHEP) IWLC2010 Monday 18 October - Friday 22 October 2010 Geneva, Switzerland.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
Superconducting Undulator Development at SSRF Zhengchen Zhang 1,2 On behalf of SCU team 1.Shanghai Institute of Applied Physics,
G-2 accelerator and cryo needs Mary Convery Muon Campus Review 1/23/13.
Turkish Accelerator and Radiation Laboratory at Ankara Suat ÖZKORUCUKLU İstanbul University.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
Insertion Devices: Wigglers and Undulators Session 6 Insertion Devices Group 11/1/12.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
Automatic Machine Review Dec 2015 MAX IV Storage Rings Automation Pedro F. Tavares.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
TAC Synchrotron Radiation Project Dr. Zafer Nergiz Nigde University Science Faculty Physics Department.
PETRA III, A New High Brilliant Light Source At DESY
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Seungyu Rah (Pohang Accelerator Laboratory, POSTECH, Korea) Nov
Workshop on Accelerator R&D for USR, Huairou, Beijing, China, Oct. 30-Nov. 1, 2012 Zhou Qiaogen Shanghai Institute of Applied Physics, C.A.S. IDs for SSRF.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz IDS- NF Acceleration Meeting, Jefferson Lab,
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Operation Status of the RF Systems and Taiwan Photon Source
Montse Pont ARW 2013 Operation and Reliability at ALBA Montse Pont.
Off-axis injection lattice design studies of HEPS storage ring
Study and Development of Large Cryogenic Systems in China
National SYNCHROTRON Radiation Centre SOLARIS Jagiellonian University, Krakow, Poland Piotr Goryl Motion Workshop, Soleil,
Diamond Light Source Status and Future Challanges
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Bocheng Jiang SSRF AP group
LLRF'15 Workshop, Shanghai, Nov. 4, 2015
Low Emittance Rings 2014 Workshop
Hosting Orsay Walid KAABI
Coupling Correction at the Australian Synchrotron
Cryogenic System Operation and the Progress of SSRF II
Operation Reliability of SSRF and upgrade plan at SSRF
ESS RF Development at Uppsala University
Commissioning the Fast Orbit Feedback System at SSRF
Superconductivity in the BEPCII Performance
PETRA IV Lattice Studies
An overview the ASTRID2 storage ring and its RF system
Machine Operation and Progresses in SSRF
R. Bartolini Diamond Light Source Ltd
Electron Source Configuration
IHEP Cryomodule Status
RF Techniques and Developments at SSRF
LAL meeting on e+ studies, Oct. 2010
LHC (SSC) Byung Yunn CASA.
Operation Progress and Upgrade in SSRF
ILC 3.2 km DR design based on FODO lattice (DMC3)
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
ILC 3.2 km DR design based on FODO lattice (DMC3)
WELCOME TO SOLEIL Amor Nadji On behalf of Synchrotron SOLEIL
Status of the ASTRID2 RF systems
Proposal for a CESR Damping Ring Test Facility
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
3.2 km FODO lattice for 10 Hz operation (DMC4)
Presentation transcript:

SSRF storage ring improvement in beam line phase II project Bocheng Jiang on Behalf of the SSRF Accelerator Team Jun 25-28 2018 Novosibirsk, Russia

Contents Introduction of SSRF Introduction of beam line Phase II project Storage ring upgrades Lattice upgrade Cryogenic system 3rd harmonic cavity Insertion devices

Introduction of SSRF Shanghai Synchrotron Radiation Facility is a 3rd generation light source in main land China. Located in Zhangjiang High tech-park, Pudong, Shanghai. Based on a 3.5GeV electron storage ring with emittance 4 nm rad.

SSRF Complex DBA lattice 7 beam lines on Phase I project 6 users’ beam lines

Introduction of SSRF 2004 ground breaking。(250Million USD) 2007 finished installation and commissioning started. 2009 open to users. 2012 Achieve op up operation (200mA->260mA). 2013 Fast orbit feedback, orbit stability sub micron. 2016 beam line phase II project started.

Operation status

Introduction of SSRF 10多个研究领域 International: singapore3 Australia2 海南3 黑龙江5 吉林6 辽宁8 山东11 福建7 湖北13 湖南6 内蒙古3 甘肃4 青海3 四川11 云南3 新疆3 江苏33 山西5 宁夏 河南4 陕西7 安徽11 贵州2 江西4 台湾2 广西3 广东13 International: singapore3 Australia2 S Korea17 Japan5 Sweden1 Denmark1 Canada2 U.S.5 Portugesa1 Tailand1 Russia1 France2 New Zealand1 Saudi Arabia1 German 1 ⊙重庆3 ⊙北京73 ⊙天津10 河北3 ⊙香港5 澳门 ⊙ ⊙上海77 浙江14 10多个研究领域

Introduction of beam line Phase II project 16条光束线站 16 beamlines Storage ring upgrade Supplementary lab Beamline tech lab Buildings Energy, environment, material, physics, chemistry, biology Lattice modification, 3rd harmonic cavity, Cryogenic system, Insertion devices. Sample preparation lab for material, In situ environment lab, Chemistry & environment lab,biology & medical lab, Data center。 Optical tech lab, Machinery & Vacuum lab, Electric &control lab, X-ray diagnostic lab Experimental hall、Supplementary lab building、Data center. Project contents Total budget: ~250M USD, From 2016~2022

Introduction of beam line Phase II project Experimental hall Experimental hall Supplementary lab Experimental hall Data center

Introduction of beam line Phase II project Disciplines Beamline Science goals Energy science E-line energy conversion and control D-Line Structure of non-equilibrium systems Radioactive materials Radioactive material Hard X-Ray Spectroscopy Catalysis Environ. Science Hard X-ray Nanoprobe Nano technology, cell, environ. components Medium-energy Spectroscopy environmental pollutants 3D Nano Imaging nano imaging Material Magnetic Dichroism magnetic and electronic properties Laue microdiffraction local microstructure and defects Surface diffraction microstructure of surfaces and interfaces Laser Electron Gamma Source nuclear astrophysics/structure Life P2 Protein Crystallography Moderate-risk infectious viruses Membrane Protein Membrane protein Industry Applications Ultra Hard X-ray Applications engineering materials and rocks Time-resolved USAXS self-assembly and fiber-spinning Fast X-ray imaging Fast process imaging

SSRF Beamlines layout

Introduction of beam line Phase II project As a part of Phase II beamline project, accelerator get an upgrade plan to satisfy users’ requirement. The major principle is as follows: Lattice adjustment to accommodate more insertion devices. Provide various kinds of radiation sources. (SW, SuperB, EPU) Provide more operation modes. (Such as hybrid filling mode) Increase the reliability of the machine. The major upgraded systems during Phase-II project: Proposed upgrade system Purpose Super-Bend lattice Provide more straight sections, Increase the flux of the hard X-ray New Cryogenic system An online spare of the primary cryogenic system, increase the machine reliability, Provide liquid helium to 3rd harmonic cavity Third harmonic cavity Increase the current threshold of single bunch, increase the beam lifetime. New IDs Satisfy the users’ requirements for new beam lines.

Storage ring upgrades Lattice upgrade C03, C13 replace 1.8m bend with 1m SuperBend Creating 1.9m short straight section Super Bend ID11, ID16 long straight section add triplet create double mini beta function straight sections accommodate 2 IDs

Storage ring upgrades Lattice upgrade

Storage ring upgrades Lattice upgrade Parameter Unit Current Upgrade Energy GeV 3.5 C m 432 431.989 Tune 22.22,11.29 22.222, 12.153 Emittance nm rad 3.9 4.22 (with SW) Momentum compaction 4.27e-4 4.2e-4 Energy spread 9.8e-4 11.1e-4 Energy loss/turn MeV 1.44 1.7 (With SW) Straight sections 4×12, 16×6.5 4×12, 16×6.5, 2×1.9 Bunch length mm 3.8 4~8 Bend field T 1.27 1.27 2.29

Storage ring upgrades Lattice upgrade Super Bends, combine sextupoles had been built ID11,ID16 upgrade had been finished and beam commissioning successfully. Vacuum system, Gird is in fabrication.

Storage ring upgrades Cryogenic system Refrigerator 650W/4.5K 60W@2K LHe Dewar 2000L Valve Boxes 4 Multi channel Transfer Line Single channel Transfer Line GHe Storage Tanks 2×100m3 O MC ORS LN 2 Buffer Main Dewar Compressor Station & Tank Farm Cold Box Mul ti - channel Transfer Line Atm N phase separator V L P 300K return S T HT B U LP Tank 4.5K return from cavities 300K supply 80K return from dewar 80K supply 4.5K supply VB SRF Cavity A C Operation mode: 1、Main cryo for 3 main RF cavity, Cryo-II for 3rd harmonic cavity @ 2K 2、Main Cryo or Cryo-II down, The other switched both for 3 main RF cavity & 3rd harmonic cavity @ 4K, with 3rd harmonic detuned.

Storage ring upgrades Cryogenic system Current status Transfer Line had been installed 2 LHE tank had been installed Foundation for Refrigerator is ready

Storage ring upgrades 3rd harmonic cavity Passive super conducting cavity 2 Cells Working at 2K, 1.5GHz Harmonic rf voltage 1.4~1.8MV

Storage ring upgrades 3rd harmonic cavity 3rd harmonic cavity installed at ID05, occupy half of the straight section Near main Rf cavity and Cryogenic hall 3rd harmonic cavity 500MHZ Main RF cavity C05 For 3rd hamonic

Storage ring upgrades 3rd harmonic cavity ACB & 2K cold box 2K Multi-transfer line Cryoplant Harmonic cryomodule Main SRF modules & ValveBoxes Test Cave RF Hall

Storage ring upgrades Lengthening effect 3rd harmonic cavity Lengthening effect Longitudinal acceptance Detuning Tracking for transient loading Long bunch train Short bunch trains Hybrid filling pattern

Storage ring upgrades Insertion devices In house built EPU , IVU

Storage ring upgrades Insertion devices CPMU Beam test, 9th harmonic

Super Conducting wigglers 4.2 Tesla, Periods 22.5, Period length 48mm Storage ring upgrades Insertion devices Super Conducting wigglers 4.2 Tesla, Periods 22.5, Period length 48mm Prototype 3D design Superconducting wire coiling Thermotat design

Scheduale Beam line Building Finished commission Started2016年11月 2018.8 2018.12 竣工 完成穿墙线基建 Supplementary lab 设备安装 试运行 2019.6 2nd bath beam line installation 3rd batch beam line installation Beam line Finished commission 2018.12 2021.9 2019.9 2020.9 First batch installation 2019.6 2020.6 Started2016年11月 2nd batch beam line commissioning 2022年6月 First batch beam line commissioning 3rd batch beam line commissioning Inspect 2022年11月 2018.12 Accelerator 3rd harmonic cavity Lattice upgrade 2020.6

Thanks