Development Work Group 0209 Straw Man Update

Slides:



Advertisements
Similar presentations
Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
Advertisements

PN UNC Workgroup (AQ topic)
PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
AQ Amendment: Relevant UNC obligations and additional Validations Applied 27 May 2010.
Version /08/2008 The AQ calculation and validation process Compiled and delivered from the xoserve AQ Team for Review Group 209 Susan Prosser & Steve.
AQ Overview.  Annual Quantity (AQ) is a value held for each meter point that reflects the expectation as to the volume of gas that a meter point will.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
Mod 270 Potential Options Rob Hill 15/02/2009. Six potential options following discussion at last months Development Workgroup OptionNameDescription 1Elective.
AQ Tolerance Proposal Mod 209 – August Page 2Theme Date Department AQ Tolerances  Provide a view of appropriate tolerances for AQ validation 
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Analysis of the Xoserve Read Validation Proposal Author: Alex Cullin 27/08/2014.
PN UNC Workgroup Read Validation 4 th October 2011.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
ScottishPower, Energy Retail MOD 282 – Introduction of a process to manage Long Term Vacant Sites May 2010 Elaine Carr ScottishPower.
Version PNUNC AQ Principles Workgroup Mod 0209 – Rolling AQ Presenter: Steve Nunnington 23 rd March 2010.
Impacts of Mod 244 Steve Nunnington xoserve. Background  96.5% of transportation charges based on capacity.  These are dependent on historical throughput.
PN UNC Workgroup Settlement Issues 1 st November 2011.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
DESC Technical Workgroup Review of draft 2017/18 NDM Algorithms
Rolling AQ – Initial Calculation
UNC Modification Proposal 0202 National Grid Distribution
Options for Mod 640 Replacement
Project Nexus Workgroup (Settlement)
Rebecca Knight Mod 644 UIG Analysis.
Nexus Meter Read Performance April 2018
Must Read Process Guide For Shippers
Modification Proposal 0192 – Draft Business Rules.
Incentives 26 September 2018.
Project Nexus Workgroup
Project Nexus Workgroup
Impacts of Project Nexus Implementation Date to AQ17
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
XRN4790 – Introduction of winter read/consumption reports
Project Nexus Workgroup
AQ Review and Revision Processes & Development of the Current Regime
Mod Proposal 0268 : AQ Backstop Date
Changes implemented February/ March 2019
Actions for Mod209 Workgroup
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
UK Link Replacement Programme additional supporting UNC modifications
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Deferral of Retrospective Updates Functionality
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
CSEPs SPA Rejections November 2007 update
GT Response to Action AMR014 Project Nexus AMR Workgroup 20th July | Energy Networks Association.
AQ BTU Form – Process & Timeline 29th September 2009
Overview of RbD Risk Modelling 31 March 2008
DN Interruption Phase II
AQ Threshold Analysis Steve Taylor Centrica plc.
Project Nexus Workgroup
AQ Review System Calculation Overview
Nexus Workgroup Read Validation Scenarios
CSEPs SPA Rejections December 2007 update
Meter Read Rejections ..
Meter Reads.
Project Nexus Workgroup
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
PN UNC Workgroup (AQ topic)
Annual Quantity (AQ) 45.
Customer Issue Management CoMC Update for April & May 2019
CSEPs SPA Rejections January – August 2007
Enabling Large Scale Utilisation of Class 3
Presentation transcript:

Development Work Group 0209 Straw Man Update 14 May 2008

Key √ = Agreed for the purpose of Mod Development X = Rejected ? = More work required Owner = Person to submit proposed solution or discussion starter at next meeting Owner = Person to submit proposed solution or discussion starter

Meter Reads

Meter Reads √ ? SB SL Meter Readings will continue to be submitted Owner Meter Readings will continue to be submitted √ Acceptances and rejections will be notified to the User as separate data items Accepted meter reads will be put forward for review USRVs will be put forward as current practice To be considered as part of validation ? SB All NDM meter types will be put forward (except below) DMs to be considered further SL Opening read estimate will only be used as opening read for any variance period

Consumption Periods

Consumption Periods √ SB ? SN Maximum period will be three years Owner Maximum period will be three years √ Minimum period will be nine months plus one day SB Target period will be different for monthly and non monthly: Monthly will be 50 weeks ? SN Non-monthly will be 42 weeks Current backstop will no longer apply

Validation Principles

Validation Principles Validation will be able to be systematised √ Current manual validations will be systematised where practicable The User will be notified of rejection Reason codes will be issued with rejections The User may resubmit for the following month User identifier will allow validation to be overridden

Validation Details

Validation Details ? SN EL √ Owner AQ increases of over 500% will be rejected ? SN May need to reflect AQ band EL If User resubmits with an identifier it will be accepted the following month √ Negative AQs will be rejected All reductions (other than negatives) will be accepted

Change Threshold

Change Threshold √ ? SB X ST Owner There will be change thresholds below which changes in calculated AQ will be ignored √ The Small Supply Point Threshold will be [x]% ? SB The Large Supply Point Threshold will be [y]% There will be no exceptions to this rule X Potential zero or smaller percentage for larger EUCs ST

Timescales

Timescales √ ? AQ updates shall be monthly Meter readings will be processed on 15th ? Calculations will take place between 15th and 25th Users will be advised on 25th New values will be live from 1st of the following month There will be no amendment process

Appeals

Appeals Owner Appeals will not prevent calculated AQs going live but the agreed value will apply in subsequent months √ Meter reading data can be changed by: A replacement read A more recent read Appeals will be allowed if User demonstrates: Meter asset data is erroneous Incorrect data adversely affects the AQ There is a manifest change in usage Need to debate appeal process for SSPs ? SL

Monitoring

Monitoring Owner Statistics will be reported at an industry forum √ Ofgem will receive a reporting pack ? JB Reports will be produced per User : Reports to be determined SN Frequency to be determined User anonymity will be retained All

Implementation

Implementation ? DNs Large Supply Points will be implemented in 2012 Owner Large Supply Points will be implemented in 2012 ? DNs Small Supply Points will be implemented in 2013

Threshold Crossing

Threshold Crossing ? SB/ SN MJ All √ Owner LSP will only become SSP or vice versa when the AQ changes by more than [5]% ? SB/ SN Mod 0640 replacement required MJ Mandatory Daily Metering will only apply when the AQ is calculated to be above the threshold for [three] months All Site Specific Correction Factors will only apply when the AQ is calculated to be above the threshold for [three] consecutive months Supply Points will not automatically revert back if AQ reverts √

Other Parameters

Other Parameters Owner AQ will be updated using the revised WAALP at the first accepted meter reading following a change in the Seasonal Normal Composite Weather Variables √ When SNCWV is changed all AQs will be scaled WAR will be calculated each year at the first accepted meter reading after 31 March SOQs will be revised when AQ revised SOQs will be revised to reflect load factor changes (trigger to be determined) ? SB