Shippers’ Meeting 29 June 2005

Slides:



Advertisements
Similar presentations
Implementation of the Network Code Balancing in the Netherlands Marcel Neef 28 November 2013.
Advertisements

1 Warsaw, 16 October 2012 the system, that connects New Gas Market Model in TNC.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
Investment in Gas Infrastructure A regulator´s view Nina GRALL Seminar on Gas Industry Restructuring in SEE 4/5th October 2005, Belgrade.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
Jonas Törnquist EFET Gas Market Transparency Requirements ERGEG Enabler Group Meeting Dublin, April 2007 Törnquist.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Mod Clarifications Transmission Workstream 6 August 2009.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Long-term Security of Gas Supply in a Liberalized Market Jean-Paul PINON Director Gas Market, CREG Co-chairman of the Gas Working Group, CEER UNEC Round.
Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
European Developments Transmission Workgroup 3 rd May 2012.
Shipper meeting 19 February 2004 Sheraton- Amsterdam.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Www2.nationalgrid.com/bsuos An Introduction to Balancing Services Use of System Charging (BSUOS)
Allocation of capacities. 2 Allocation of Capacities Determination of capacities Calculation of pipeline capacities is based on the physical laws governing.
Draft Decision on the Reset of Prices for Electricity Distribution Businesses Presentation to Market Analysts 19 July 2011.
Prepared by California Department of Water Resources May 31, 2001
Fuel Cost Components in the Fuel Adder
Congestion Management
Fuel Cost Components in the Fuel Adder
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
GRI North-West Meeting
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Conclusions STC Core Group 8 September 2009 The Hague
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Fuel Cost Components in the Fuel Adder
Transparency Project GRI NW Region
UNC Modification Proposal 0202 National Grid Distribution
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Dte Consultation session, The Hague,
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
Demand forecast and network balancing
40th IG meeting 29th November 2016
PLC = Peak Load Contribution (aka “ICAP”)
26th IG meeting 23th January 2014
Background and Process
CMP Transparency Requirements
37th IG Meeting South Gas Regional Initiative
Transmission Workstream 4th July 2007
GRI NW TRANSPARENCY PROJECT
GRI North-West Meeting
An Introduction to Balancing Services Use of System Charging (BSUOS)
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
37th IG Meeting South Gas Regional Initiative
Shippers’ Meeting 7 February 2006
Gas balancing – where next
24th January 2017 Teleconference
40th IG meeting 29th November 2016
37th IG Meeting South Gas Regional Initiative
GRI North-West Meeting
Implementation of the Network Code Balancing in the Netherlands
Capacity Methodology Statements: Impact of Mod 452
NTS Entry Charging Review Update
Transmission Workgroup June 7th 2012
Shippers’ Meeting 18 November 2004
EURELECTRIC transparency requirements
Proposed Transitional Gas Exit Arrangements
Workgroup meeting October 2014
PRISMA General Information
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Presentation transcript:

Shippers’ Meeting 29 June 2005 NH Hotel - Naarden 15.05.2019

Program Introduction Paul van der Laan Conditions and system 2006 Jan Willem van Dijk Change in structure TSC 2006 Jan Eggink Miscellaneous Jan Eggink Closing Paul van der Laan Lunch

Program Introduction Paul van der Laan Conditions and system 2006 Jan Willem van Dijk Change in structure TSC 2006 Jan Eggink Miscellaneous Jan Eggink Closing Paul van der Laan Lunch

Conditions and system 2006

Penalty => Surcharge Introduction Highlights Penalty => Surcharge More time to balance exits More tolerance during the day Since previous presentation

Subjects Delay time between entry and exit Tolerance on contracted transport capacity Tolerance principles Tolerance amounts Commodity pricing Surcharges exceeding tolerance boundaries Incentive day

1 Delay in entry with respect to exit Default Two hours delay Balance/imbalance based on Exit(t) = Entry(t+2) Per portfolio Independent of ambient temperature Gas day on entry time from 6.00-6.00 (LET) Rules and imbalance correction for first two hours of entry and last two hours of exit (“two hour settlement”): New regime New portfolio Change in entry or exit contract in an existing portfolio Two hour settlement at the end of each month

1 Delay in entry with respect to exit Exceptions: no delay time TTF On entry time =>also all trading on entry time 1.5 hour time for exit balancing when TTF is entry Entry balancing via TTF remains the same as in the current system Wheeling and short haul Shipper choice: Exit(t) = Entry(t) Complete portfolio Per calendar year Compared to t+2 non optimal for pipeline network -> 25% hourly and cumulative tolerance reduction

2 Tolerance on contracted transport capacity On firm entry and exit contracts in a portfolio On interruptible contracts the tolerance amount is reduced in line with the applicable tariff class percentage Wheeling and short haul portfolios limited to 2%* tolerance on the hour No tolerance on TTF Tolerance based on monthly average of contracted transport capacity in a portfolio Overbooking of domestic exits and interruptible GTS retains right to adjust tolerance percentages of shippers in case of overbooking (e.g. no tolerance for non users above normal demand capacity) *Properties differ from current operational margin

3 Tolerance principles Example of portfolio with 20% hourly tolerance

4 Tolerance amounts Hourly and cumulative tolerance Depending on number of portfolios and portfolios sizes Development from three class system with fixed percentages to “tax bracket” system Three brackets All shippers receive tolerance of first bracket Shippers above the first threshold receive the tolerance of second bracket etc. Introduction of minimal hourly tolerance level For large diversified portfolios the portfolio uncertainty reaches a constant percentage Portfolio splitting GTS will provide portfolio hourly and cumulative tolerance per portfolio on an affiliate company level

4 Tolerance amounts “Tax bracket” system with minimum level Indicative percentages (transport contracting 2005) For default portfolios and temperatures above 0 oC: For hourly and cumulative tolerance below 0o C a linear decrease from the level in the table above to respectively 2% for hourly and 4% for cumulative tolerance at –17 oC Reset to neutral at end of the gas day Bracket mln m3/h Hourly tolerance per m3/h Cumulative tolerance per m3/h Minimal hourly tolerance % Minimal cumulative tolerance % 0.00 – 0.25 30% 120% 0.25 – 1.00 8% 32% 13.5% 54% 1.00 – > 5.7% 22.8% 6% 24%

4 Tolerance amounts Hourly tolerance as function of portfolio size

4 Tolerance amounts Daily tolerance New regime 24% of contracted hourly capacity Reset to neutral (0) at end of gas day No fall back to zero level in case of exceeding boundaries No temperature dependency In the view of GTS reset at the end of the gas day is not a TSO task because of the trading implications Decrease of daily tolerance is first step in repairing reset amount to levels corresponding to the TSO role of GTS Current regime 2% of daily volume based on accumulation of 2% uncertainty margin 2% uncertainty is valid for 1 entry or 1 exit Uncertainty in portfolio balance volumes is much less

On day ahead spot indicators 5 Commodity price On day ahead spot indicators APX Netherlands (TTF) APX UK (NBP) APX Belgium (Zeebrugge) Excess on lowest indicator Shortage on highest indicator Exceptions Monthly average APX Netherlands Reconciliation Two hour settlement

6 Surcharges exceeding tolerance boundaries Surcharges expressed as percentage of excess or shortage commodity price Excess Low commodity price Shortage High commodity price Hourly 10% 15% Cumulative 100% Daily

7 Incentive day Introduction of incentive day Days with high loads on the transportation system (e.g. ambient temperatures below 2 oC) Shipper is required to balance on Exit(t) = Entry(t+1) Announcement of an incentive day by GTS day ahead before 11.00 hour L.E.T. All other balancing rules, boundaries and penalties remain unchanged Portfolio is entered into “incentive day” scheme on calendar year basis Incentive Shipper receive a financial incentive based on the portfolio size in the applicable months of the year Incentive amount is not yet decided

Closing remarks Current status not final Subject to approval DTe Tolerance percentages dependent on transport contracting in 2006 Presented tolerance percentages and examples based on default portfolios Attention drawn on 25% tolerance reduction for non default portfolios on Exit(t) = Entry(t)

Program Introduction Paul van der Laan Conditions and system 2006 Jan Willem van Dijk Change in structure TSC 2006 Jan Eggink Miscellaneous Jan Eggink Closing Paul van der Laan Lunch

Transmission Service Conditions-2006 (1) Dutch Gas Act: Gas Conditions: Tariff structures and Conditions Proposals by joined network operators (JNO) to DTe DTe procedure: DTe compares proposals with legal requirements/standards DTe sends request to amend to JNO JNO return amended proposals to DTe Assessment by DTe (pending further notification from Brussels)

Transmission Service Conditions-2006 (2) Proposals JNO (conditions related to GTS): Tariff structure Conditions: Connection conditions Transmission conditions Metering conditions Allocation methods General legal tasks

Transmission Service Conditions-2006 (3) Planning Tariff structure: Consultation -> finished Amended version -> DTe Waiting for DTe assessment (21 July 2005) Conditions: Consultation (14 June 2005) Request to amend from DTe to JNO (mid July?) Amended version from JNO to DTe (4 weeks later) Assessment DTe (Q4 2005?)

Transmission Service Conditions-2006 (4) TSC-2006 in addition to Gas Conditions Elaboration/deepening fundamentals of Gas Conditions No duplications New framework, same structure (main text + exhibits) Timing: after assessment of Gas Conditions planning 1 October 2005 Explanation of changes in (next) Shippers’ Meeting

Miscellaneous QC 2006 Monthly factors backhaul 2006 Learning year: extended to 2006 for residential customers Tariffs 2006 Click & Book: new release Net Topology Reminder: fill out and send in the customer satisfaction questionnaire

Program Introduction Paul van der Laan Conditions and system 2006 Jan Willem van Dijk Change in structure TSC 2006 Jan Eggink Miscellaneous Jan Eggink Closing Paul van der Laan Lunch

Thank you for your attention and enjoy your lunch! Shippers’ Meeting 29 June 2005 NH Hotel Naarden Thank you for your attention and enjoy your lunch!