MVB-II Assembly Instructions © All Rights Reserved to Mifram Ltd. 2018
About the MVB-II The MVB 2 is an advanced and improved version of the original Mifram MVB The overall principle remains the same When assembled units vertical element is impacted diverting the horizontal momentum into the ground The placement of the MVB is crucial. The Pictures demonstrate the correct orientation of the units The open side of the L shaped unit is the side to face the threat and receive the impact Tested & Approved:
Deployment Recommendations If Possible, deploy the MVB-II where the ramming car will be situated in the lower speed by using natural obstacles like curves etc. Block road sides and side walks. Use warning lights and signs.
Orientation of Elements in direction of potential threat (Open L shape) in direction of potential threat Direction of Potential Threat MVB – II Deployment
Safety Warning Be aware that several parts are heavy (26 kg) and sharp, pay attention during unloading, assembling and packing Elements Placed upright prior to being joined can fall on their side and create a hazard
The complete MVB-II
MVB-II Parts
R Pin
Handle
Rod & End Unit
Pull out the safety R pin
Pull out the safety R pin
Pull out the locking yellow pin
Pull out the locking yellow pin
Lift the upper part
Lift the upper part and Insert the locking yellow pin
Insert the locking yellow pin into the right hole The wrong hole The right hole
Insert the locking yellow pin into the right hole The wrong hole
Insert the safety R pin
Insert the safety R pin
Safety pin placed in the locking pin
Assembling of the units one after the other Repeat the above steps as needed in order to get required barrier width
Start on left side, insert rod
Insert the Rod B’H
Insert the Rod to the next unit
Add the second rod
Commence second section Insert second wheel section
Insert large safety pin
Insert large safety pin and lock it with the spring
Assembled and secured rods
Assembled 2 units with rods Repeat the above steps as needed in order to get required barrier width
MVB-II Assembling First Meter Exercise Care Units when opened and in standing position can tip and fall sideways. In order to prevent this, keep all units laying on their side on the ground surface until you are ready to join them.
Repeat the above steps
Assembling of the last right side unit
Assembling of the last right side unit
The End Unit
Insert the End Unit
Insert large safety pin and lock it with the spring
Assembled units without handle Place of handle
Attach the handle
Secure the handle with safety pin and lock it
MVB-II with rods & handle
Next step Assembling of the upper and lower cross section bars
Pull out the safety R pin from the upper cross section bar
Pull out the yellow pin and lift the upper cross section bar
Insert the yellow pin, Always from the front side
Secure with the R pin from the back side
Pull out the safety pins from the lower cross section bar
Move it to the right position
Secure the lower cross section bar with the safety and the R pin
Insert the R pin
MVB-II is ready for operation
Please contact us Thank you for purchasing Mifram MVB-II. with any question or information you may have. Our customer support will be happy to help you. +972.4.880.8800 sales@mifram.com www.MiframSecurity.com © All Rights Reserved to Mifram Ltd. 2018